This was the 2020 version of this website. For the current version, visit terpeca.com.

Home

About the Project

The Top Escape Rooms Project is an attempt to find the very best escape rooms in the world by leveraging the experience of the most experienced escape room enthusiasts in the world. We serve escape room owners and designers by publicly recognizing their achievements, and we serve our fellow enthusiasts by providing an international bucket list of the best rooms to play.

The top rooms and top companies identified by this project each year are awarded a Top Escape Rooms Project Enthusiasts' Choice Award, or TERPECA, which represents the best of the best in the international escape room industry.

Contributors
Total Rooms Played
Top Rooms
Top Companies
Top Rooms

2020 Top Rooms

The following 50 escape rooms have earned a 2020 TERPECA for Top Room. These rooms stand out among all the others and exemplify the best of what the escape room industry has to offer.

If you missed the live results show during which these results were announced, you can still watch it here.

The Dome

4-6 Players
60 Minutes
Private Booking
Address:
Nijverheidsweg 5b
3751 LP Bunschoten
The Netherlands
Enthusiast Quote:
"There is no other game, in all 1500 games I've played, that I've spent more time discussing, theorising and reliving post-play. It has completely redrawn the boundaries of what escape rooms can be."
- Sarah Dodd (London, UK)

Paradox Project 2: The Bookstore

4-7 Players
200 Minutes
Private Booking
Address:
Charokopou 93
Athens, Attica 176 76
Greece
Enthusiast Quote:
"A three hour twenty minute epic adventure where entering into a normal looking bookstore leads you on a quest to discover the past and secrets of the protagonist. Magnificent narrative, inventive use of space and challenging puzzles, it's simply marvelous!"
- Jackie Catterall (Edinburgh, UK)

The Man from Beyond

4-8 Players
90 Minutes
Public Booking (Temporarily Private for COVID)
Address:
7026 Old Katy Road #310
Houston, TX 77024
United States
Enthusiast Quote:
"An absolutely transcendent, magical, thrilling, captivating, and (most importantly) human experience. From the set design to the puzzle integration down to the historically researched details of every element of the production, this was a truly revolutionary experience. What is real? What is magic? Are those two mutually exclusive? All questions you will grapple with at this remarkable place."
- Troy Armstrong (Olathe, KS)

El Exorcista

3-5 Players
90 Minutes
Private Booking
Address:
Dedousi 13
Ilioupoli 11743
Greece
Enthusiast Quote:
"The acting and special effects in this room put it over the top - I'm not usually a fan of horror, but this game is so well-designed that you can't help but admire it."
- Summer Herrick (Seattle, WA, USA)

The Sanatorium (Midnight Mode, Night Mode)

1-4 Players
90 Minutes
Private Booking
Address:
Deligiorgi 55-59, Platia Karaiskaki
Athens
Greece
Enthusiast Quote:
"The best scary room I have ever done. From the very beginning the setting created a great atmosphere and the in game actors did an amazing of keeping the tension raised without disrupting the overall flow of the room."
- Mark Tobin (London, UK)

Aunt Hilda's Room

3-8 Players
90 Minutes
Private Booking
Address:
5-7, Clos de la Fonderie
1227 Les Acacias
Switzerland
Enthusiast Quote:
"Outstanding setting that makes you go WOW! Very immersive. The puzzles are original, logical and totally fit the theme. Step into a fairy tale for 90 minutes (or less) of perfection."
- Stéphanie Noverraz (Lausanne, Switzerland)

Cutthroat Cavern

4-10 Players
60 Minutes
Public Booking (Temporarily Private for COVID)
Address:
800 St. Phillip Street
Baton Rouge, LA 70802
United States
Enthusiast Quote:
"Cutthroat Cavern's set is so insanely over-the-top to the point that it should have made no logical sense to make something so grand and elaborate. This product of passion is an absolute must-do for any enthusiast."
- William Chen (New York City, NY, USA)

The Innkeeper's Son

2-5 Players
90 Minutes
Private Booking
Address:
Calle Pintor Jesus Apellaniz, 5 Bajo
01008 Vitoria-Gasteiz
Spain
Enthusiast Quote:
"Mad Mansion stands out in this adventure for its unique gameplay and character interaction, plus an amazing set and effects. This adds up to make DragonBorn an incredible experience."
- Eulàlia Pujades (Barcelona, Spain)

La Casa [The House]

4-6 Players
70 Minutes
Private Booking
Address:
Carrer Gran Via, 1
08600 Berga, Barcelona
Spain
Enthusiast Quote:
"A great horror experience with a whole house for playing. It has scares, great atmosphere, and well-integrated puzzles."
- Eulàlia Pujades (Barcelona, Spain)

Going Underground

2-6 Players
90 Minutes
Private Booking
Address:
Hernalser Gürtel 24
1090 Wien
Austria
Enthusiast Quote:
"An amazing sense of exploration coupled with plenty of memorable moments, good puzzles and a great overarching narrative make this a fantastic game."
- Ken Ferguson (London, UK)

La Cerveseria [The Brewery]

4-6 Players
80 Minutes
Private Booking
Address:
Rosselló 508
08026 Barcelona
Spain
Enthusiast Quote:
"They thought about every detail."
- Victor Espriu (Vilassar de Mar, Spain)

Paradox Project 3: The Music Academy

4-7 Players
180 Minutes
Private Booking
Address:
Charokopou 93
Athens, Attica 176 76
Greece
Enthusiast Quote:
"It is the real deal! The meaning what an escape room has to be. I loved it and I think that once you played Paradox Project you get in love with this company. Just magical room."
- Paul Philippou (Athens, Greece)

The End

3-6 Players
60 Minutes
Private Booking
Address:
Dorpsstraat 33A
2712 AB, Zoetermeer
Netherlands
Enthusiast Quote:
"The unique story of the room will unfold itself slowly as you progress through until you get to the mind-blowing ending."
- Eli Gazit (Hod Hasharon, Israel)

Ghosthunter Brandon Darkmoor

3-5 Players
75 Minutes
Private Booking
Address:
Ruschestraße 64-66
10365 Berlin
Germany
Enthusiast Quote:
"Almost more of an immersive theatrical experience than an escape room, but manages to squeeze in just enough autonomy and puzzles to make the cut - a beautifully designed set with some nice surprises."
- Summer Herrick (Seattle, WA, USA)

The Edison Escape Room

4-8 Players
100 Minutes
Private Booking
Address:
3362 Palace Drive
San Francisco, CA 94123
United States
Enthusiast Quote:
"Clocking in at an impressive 100 minutes long, The Edison Room was no small feat. The room, however, never ran out of steam, constantly evolving with the help of impressive technology and smart game design."
- Shawn Elisha Simmons (Norton, MA, USA)

Töövestlus [Interview]

3-5 Players
60 Minutes
Private Booking
Address:
Never Bored OÜ (12948218)
Kotzebue 18, Tallinn
Estonia
Enthusiast Quote:
"Interview is not like any other game I've played anywhere. It pulls tricks that no sensible designer would try, and gets away with them. A work of bizarre genius, you won't know what's hit you."
- Toby Powell (London, UK)

The Lost Treasure of Alexander von Humboldt

2-5 Players
75 Minutes
Private Booking
Address:
Ruschestraße 64-66
10365 Berlin
Germany
Enthusiast Quote:
"The level of attention to detail in this room is incredible and simply isn't beaten by any other room I have done. You really feel like you are in an Indiana Jones adventure! The puzzles are fitted in nicely and the transitions from room to room were sufficiently disorienting (in a good way) to make to it seem like you have traveled a significant distance when in reality you were in the room next door. All escape room should aim to do immersion as well as this!"
- Mark Tobin (London, UK)

The Avalanche

The name of this room was An Avalanche of Oblivion at the time of the award.

2-4 Players
60 Minutes
Private Booking
Address:
Av. Esteve-Albert, 4, b-2
AD700 Escaldes-Engordany
Andorra
Enthusiast Quote:
"Great story and execution. Perfect setting and interesting games. "
- Carlos Entizne (Barcelona, Spain)

Ghost Hunter Ernie Hudson and the Wailing Woman

4-8 Players
60 Minutes
Private Booking
Address:
Spielbudenplatz 21
20359 Hamburg
Germany
Enthusiast Quote:
"Other than the great use of effects and funny elements, this room uses narrative elements, like in an audio novel, which puts you as the protagonist of the story. The set is furthermore really well-achieved."
- Santiago Onel (Rijswijk, Netherlands)

The Storyteller's Secret

2-5 Players
75 Minutes
Private Booking
Address:
55 Court St.
Boston, MA, 02108
United States
Enthusiast Quote:
"This sentimental experience was among the most innovative escape rooms I have ever seen, merging whimsical set design with a wholly unique puzzle structure."
- Shawn Elisha Simmons (Norton, MA, USA)

Lab Rat

2-8 Players
60 Minutes
Private Booking
Address:
1919 3rd Avenue
Los Angeles, CA 90018
United States
Enthusiast Quote:
"Some of the most clever set-as-puzzle moments I've ever experienced. Also some of the best feelings of agency, where you feel injected into the story as protagonists."
- William Chen (New York City, NY, USA)

The Secret of Saint-Rumoldus

2-6 Players
70 Minutes
Private Booking
Address:
Haverwerf 7
2800 Mechelen
Belgium
Enthusiast Quote:
"Narrative, ideas, sprawl, aesthetic, puzzles."
- Sharan Gill (London, UK)

101 Years of Forgiveness

2-5 Players
70 Minutes
Private Booking
Address:
Calle Arbizu, 17
31014 Pamplona, Navarra
Spain
Enthusiast Quote:
"Incredible second part of an action adventure with a great mixture of games and decoration and an amazing GM."
- Saioa Garcia (Vilafranca del Penedès, Spain)

Call or Die

3-5 Players
80 Minutes
Private Booking
Address:
Calle Arbizu, 17
31014 Pamplona, Navarra
Spain
Enthusiast Quote:
"Hard to believe you can experience so much of action in a long, fun and remarkable escape room that can be one of the most COMPLETE games ever created."
- Josue Perez (Madrid, Spain)

Elkano Ihes Gela [Elkano Escape Room]

2-5 Players
75 Minutes
Private Booking
Address:
Nafarroa Kalea, 1 W,
20800 Zarautz, Gipuzkoa,
Spain
Enthusiast Quote:
"This room is a hidden gem, designed with input from the small town it's located in. Care and attention was given to the story and theming. I liked it in part because it was so unexpected!"
- Sharan Gill (London, UK)

Insane Paranoid

2-5 Players
60 Minutes
Private Booking
Address:
Novokhokhlovskaya Ulitsa, 12, стр. 4
Moscow 111674
Russia
Enthusiast Quote:
"One of the most immersive experiences I've ever felt in entertainment. You were a character in your own movie."
- Nick Schilbe (Santa Clara, CA, USA)

The Mystery of Scum Island

2-5 Players
90 Minutes
Private Booking
Address:
Calle Nueva, 5
45001 Toledo
Spain
Enthusiast Quote:
"A great room if you don't know Monkey Island, an incredible experience if you do."
- Mark Greenhalgh (Manchester, UK)

Ghost Patrol

4-8 Players
90 Minutes
Private Booking
Address:
3996 San Pablo Ave., Suite H
Emeryville CA, 94608
United States
Enthusiast Quote:
"Fantastic craft, delightful puzzles, well integrated story, deliciously buttery feel"
- Dan Egnor (San Mateo, CA, USA)

Abduction 3: The Exam

2-6 Players
60 Minutes
Private Booking
Address:
Avinguda de Bac de Roda, 28
08915 Badalona, Barcelona
Spain
Enthusiast Quote:
"A room, where you will have lots of fun, that went beyond the typical escape room. While the narrative is absent, the original tasks, including physical ones combined with nicely conceived collaborative puzzles, make this room really special."
- Santiago Onel (Rijswijk, Netherlands)

The Amsterdam Catacombs

3-6 Players
90 Minutes
Private Booking
Address:
Haarlemmerstraat 124-126
1013 EX Amsterdam
The Netherlands
Enthusiast Quote:
"Making the best use out of an old catacomb, this escape room not only gives a complete experience regardless of win or loss, but also manages to make a scoring system based entirely on narrative."
- Manda Whitney (Toronto, ON, Canada)

Tomb Hunter: Akasha's Legend

2-6 Players
60 Minutes
Private Booking
Address:
Carrer d'en Baró 17
08921 Santa Coloma de Gramenet
Barcelona
Spain
Enthusiast Quote:
"The incredibly immersive set and some very cool interactions make this game a real stand-out. It's rare for a "tomb" themed game to actually feel real, and the folks at Escape Barcelona manage this feat handily."
- Summer Herrick (Seattle, WA, USA)

Der Fluch des Neptun [Neptune's Curse]

4-7 Players
60 Minutes
Private Booking
Address:
Rickmer Rickmers
Landungsbrücken, Ponton 1a
20359 Hamburg
Germany
Enthusiast Quote:
"An amazing location - a real boat - was used to house this game set inside a boat and the world of maritime myths."
- Stefan Bauer (Linz, Austria)

Wake Up

3-5 Players
130 Minutes
Private Booking
Address:
Chomatianou 33,
Athina 104 39,
Greece
Enthusiast Quote:
"Excellent atmosphere, very clever riddles and puzzles, very spacious with many rooms to explore, nice acting"
- Anna Papachristou (Athens, Greece)

Don't Take a Breath

4-7 Players
120 Minutes
Private Booking
Address:
28, Agiou Konstantinou,
Acharnes 136 73,
Greece
Enthusiast Quote:
"It's like playing in the movie. Not a simple one with solving riddles, having actors etc. Beware of the blind old man..."
- Kostas Chados (Athens, Greece)

Woman in Black

2-6 Players
110 Minutes
Private Booking
Address:
Sapfous 143,
Kallithea 176 75,
Greece
Enthusiast Quote:
"The atmosphere is outstanding, the set is great, the riddles and puzzles are just what it has to be for a horror escape room and of course the acting and the horror are so good and directed great."
- Paul Philippou (Athens, Greece)

Die Gasse [The Alley]

4-6 Players
90 Minutes
Private Booking
Address:
Kortumstraße 53/1.OG,
44787 Bochum,
Germany
Enthusiast Quote:
"Megacool!!! I could have continued doing magic for hours or simply delighted in the countless, loving details."
- Heiner Stepen (Munich, Germany)

The Storykeeper

4-6 Players
70 Minutes
Private Booking
Address:
619 North 35th Street
Seattle, WA 98103
United States
Enthusiast Quote:
"The Storykeeper somehow manages to excel in every category of escape: engaging narrative, entertaining characters, challenging puzzles, stellar set design, immersive world, and unique hint system. Start to finish it is an unforgettable experience."
- Manda Whitney (Toronto, ON, Canada)

Expedición Maldita [Cursed Expedition]

2-6 Players
75 Minutes
Private Booking
Address:
Av. de la Libertad,
1, 30120 Murcia,
Spain
Enthusiast Quote:
"A great Egyptian adventure in which you are the protagonist, it has a spectacular setting with many original and fun puzzles."
- Pedro Moreno Bermudo (Barcelona, Spain)

Haunted House 2: Poltergeist

2-6 Players
60 Minutes
Private Booking
Address:
Petrské náměstí 1186/1, Prague 1
Czech Republic
Enthusiast Quote:
"A scary game, but not by filling it with jump scares, plus an amazing backdrop that seals the immersion and creates memorable moments. Good puzzles, too, so you'll need to keep your brain working!"
- Ken Ferguson (London, UK)

Ghost Hunter Ernie Hudson and the Zoo of Death

3-6 Players
60 Minutes
Private Booking
Address:
Spielbudenplatz 21
20359 Hamburg
Germany
Enthusiast Quote:
"This room uses a combination narration and great setting to really immersive payers into the story. Additional the GM interaction (no spoilers) really helped to add to the immersion and personality of the room. Lastly it had one the most impressive 'wow' moments I have ever experienced in an escape room which I simply wasn't expecting."
- Mark Tobin (London, UK)

Stash House

4-11 Players
90 Minutes
Private Booking
Address:
4267 West 3rd Street
Los Angeles, CA 90020
United States
Enthusiast Quote:
"The game begins prior to the clock starting, trapping you in the game. The ability to keep several enthusiasts actively engaged in puzzling concurrently makes this experience stand out from the crowd."
- Rachel Bordenca (New York City, NY, USA)

Jungle Quest

3-6 Players
70 Minutes
Private Booking
Address:
2 Rue des Fenouillèdes,
66280 Saleilles,
France
Enthusiast Quote:
"Spectacular room!!"
- Jose Juan (Sabadell, Spain)

Obłęd [Asylum]

2-6 Players
90 Minutes
Private Booking
Address:
Multiple Locations
Poland
Enthusiast Quote:
"The story, atmosphere, puzzles... the overall experience makes this room special."
- Eulàlia Pujades (Barcelona, Spain)

La mina [The Mine]

2-7 Players
90 Minutes
Private Booking
Address:
Calle Bacardi, 32 - 08902
Hospitalet de Llobregat (Barcelona)
Spain
Enthusiast Quote:
"A journey deep underground into a mysterious mine. Blends puzzles and theme extremely well, creating a real sense of mystery and adventure."
- Dean Love (Coventry, UK)

The Intervention

4-12 Players
75 Minutes
Private Booking
Address:
Eliezer Mazal St 3
Rishon LeTsiyon
Israel
Enthusiast Quote:
"Based on the "How I Met Your Mother" TV series, this room is Legen-wait for it-dary!"
- Yoni Yon (Gush Dan, Israel)

The Secret Of Kryptos

2-6 Players
75 Minutes
Private Booking
Address:
1 Manush Voyvoda St.,
Sofia 1124
Bulgaria
Enthusiast Quote:
"This room is the perfect combination of really neat puzzles, a perfect and clean design, and just the most slick and elegant tech. It is such a gem in every aspect!"
- Lee Ballan (Kfar Saba, Israel)

Marcheurs de rêves [The Dreamwalkers]

3-6 Players
60 Minutes
Private Booking
Address:
1535 Ch Ste-Foy local 010,
Quebec City, Quebec
Canada
Enthusiast Quote:
"From normal to WOOOOOOOW in minutes"
- Marc Raymond (Québec, QC, Canada)

Kontinuum

3-6 Players
60 Minutes
Private Booking
Address:
8404 Winterthur,
Switzerland
Enthusiast Quote:
"Five of the best moments I've ever had in escape rooms."
- Mark Greenhalgh (Manchester, UK)

Mystère à Lived Street [Mystery on Lived Street]

3-8 Players
75 Minutes
Private Booking
Address:
2 Rue des Fenouillèdes,
66280 Saleilles,
France
Enthusiast Quote:
"Stunning decor and very smart game design."
- Lucas Roullet-Marchand (Lyon, France)

GhostHunters

2-5 Players
90 Minutes
Private Booking
Address:
Malyy Gnezdnikovskiy Pereulok, 12
Moscow 125009
Russia
Enthusiast Quote:
"It's a high budget, well themed homage to Ghostbusters that doesn't step on its toes, yet continues to delight and provide moments of joy."
- James Hamer-Morton (Reading, UK)
Top Online Rooms

2020 Top Online Rooms

The following 10 online escape rooms have earned a 2020 TERPECA for Top Online Room. These rooms stand out among all the others and exemplify the best of what the escape room industry has to offer in hosted online games.

If you missed the live results show during which these results were announced, you can still watch it here.

Pursuit of the Assassin Artist

2-8 Players
90 Minutes
Private Booking
Enthusiast Quote:
"Designed specifically for remote play, Assassin Artist is the clearest demonstration I've seen that avatar games have potential to continue as an interesting, innovative genre of their own long after COVID becomes a fading bad memory."
- Toby Powell (London, UK)

Miss Jezebel Online

1-8 Players
60 Minutes
Private Booking
Enthusiast Quote:
"It's easy to focus on the 18+ content and dark comedy tone of Miss Jezebel, but what made it a truly special game for me was the superb character work and interaction. The actors' ability to improv and banter with the players is something all avatar lead online rooms should strive for."
- Manda Whitney (Toronto, ON, Canada)

Virtual Exorcist

1-6 Players
90 Minutes
Private Booking
Enthusiast Quote:
"The amazing production values, awesome game mastering, intuitive puzzling, and engaging story line all weave together into an adventure that must be experienced."
- Brandon Taylor Smith (Morrisville, NC, USA)

The Beast

1-6 Players
90 Minutes
Private Booking
Enthusiast Quote:
"The sequel to the Virtual Exorcist, this room immediately follows on from those events and sprints full pelt at your screen."
- Jackie Catterall (Edinburgh, UK)

The Vanishing Act Remote

4 Players
90 Minutes
Private Booking
Enthusiast Quote:
"This game was so smooth from beginning to end, the flow of the puzzles and immersive experience was great, and it definitely had that chill factor throughout the journey!"
- Brandon Chow (New York, NY, USA)

The Truth About Edith

4 Players
60 Minutes
Private Booking
Enthusiast Quote:
"It was a great concept and nicely challenging."
- Sharan Gill (London, UK)

Agent Venture Mission Three: B.A.D Side of the Moon

4-5 Players
60 Minutes
Private Booking
Enthusiast Quote:
"The third game is better than the second, which is better than the first, which I gave five stars to."
- Wei-Hwa Huang (San Jose, CA, USA)

Condemned 2 Online

4-10 Players
90 Minutes
No Longer Available
Enthusiast Quote:
"An abandoned warehouse, designed with great attention to detail, with a variety of rooms, lots of action, twists and turns, nice tasks, and a great finale."
- Heiner Stepen (Munich, Germany)

Project Avatar: First Mission

1-10 Players
90 Minutes
No Longer Available
Enthusiast Quote:
"Such bold and crazy ideas but loved every minute of the game. The largest escape room space we've ever been "in"."
- Cici Cao (New York, NY, USA)

Virtual X-Caper

4-10 Players
60 Minutes
Private Booking
Enthusiast Quote:
"This game is a bundle of joy. This project was created uniquely for remote playing, and it serves as proof how a great game master, fun interactions, good puzzles, and a hilarious experience, are all it takes in order for an experience to be a top-level memorable."
- Lee Ballan (Kfar Saba, Israel)
Top Companies

2020 Top Companies

The following 25 companies have earned a 2020 TERPECA for Top Company. These companies have demonstrated a sustained ability to produce games and experiences that excel in all ways and exemplify the best of what the escape room industry has to offer.

If you missed the live results show during which these results were announced, you can still watch it here.

Mad Mansion

Location:
Spain
Experiences:
  • DragonBorn: The Innkeeper's Son (2020 Top Room #8)
  • Over Time: 101 Years of Forgiveness (2020 Top Room #23)
  • Over Time: Call or Die (2020 Top Room #24)
  • The Mystery of Scum Island (2020 Top Room #27)
  • Dino Rising Experience: Dino Rising Blue Team (2020 Finalist)
  • Dino Rising Experience: Dino Rising Red Team (2020 Finalist)
  • The Legend: The Temple of Chaak (2020 Finalist)
  • Assassins vs Templars
  • Castlemaniac
  • Madness Toledo: T-Virus Apocalyse
  • Mansion Crowell
  • Silent Town
  • The House of Madness

The Room

Location:
Berlin, Germany
Experiences:
  • Ghosthunter Brandon Darkmoor (2020 Top Room #14)
  • The Lost Treasure of Alexander von Humboldt (2020 Top Room #17)
  • Go West (2020 Finalist)
  • The Beast of Berlin (2020 Finalist)

Paradox Project

Location:
Athens, Greece
Experiences:
  • Paradox Project 2: The Bookstore (2020 Top Room #2)
  • Paradox Project 3: The Music Academy (2020 Top Room #12)
  • Paradox Project: The Mansion (2020 Finalist)

Skurrilum

Location:
Hamburg, Germany
Experiences:
  • Ghost Hunter Ernie Hudson and the Wailing Woman (2020 Top Room #19)
  • Ghost Hunter Ernie Hudson and the Zoo of Death (2020 Top Room #40)
  • Guschi's Seedy Cellar (2018 Nominee)
  • Malvini's Legacy
  • The Phantom Island

Claustrophobia

Location:
Russia / Andorra / Belarus / Estonia / Spain
Experiences:
  • An Avalanche of Oblivion (Andorra) (2020 Top Room #18)
  • GhostHunters (Russia) (2020 Top Room #50)
  • Cinema of Despair (Andorra) (2020 Nominee)
  • Gulliver and the Giants (Spain) (2020 Nominee)
  • Philosopher’s Stone (Spain) (2020 Nominee)
  • Alice in Nightmareland (Russia) (2018 Top Room #22)
  • Gravity (Estonia) (2019 Nominee)
  • Houdini's Escape (Russia) (2018 Nominee)
  • Iron Man (Russia) (2018 Nominee)
  • Rise of the Machines (Russia) (2018 Nominee)
  • Saw (Russia) (2018 Nominee)
  • and many, many others

Escape Dimension

Location:
Perpignan, France
Experiences:
  • Jungle Quest (2020 Top Room #42)
  • Mystère à Lived Street (2020 Top Room #49)
  • Morgana’s Curse

Wyjście Awaryjne

Location:
Poland
Experiences:
  • In the Shadow of the Pyramids (2020 Finalist)
  • Nautilus: The Underwater Adventure (2020 Finalist)
  • Operation: Metro (2020 Finalist)
  • The Legend of the Sword (2020 Finalist)
  • The Mystery of Nile’s Emperor (2020 Finalist)
  • Cell No. 4
  • Plan for Break
  • Treasury

13th Gate Escape

Location:
Baton Rouge, LA, USA
Experiences:
  • Cutthroat Cavern (2020 Top Room #7)
  • The Asylum (2020 Finalist)
  • Tomb of Anubis (2020 Finalist)
  • Agent 13 (2020 Nominee)
  • Spellbound (2020 Nominee)
  • The Collector (2020 Nominee)
  • Death Row
  • Hijacked

Palace Games

Location:
San Francisco, CA, USA
Experiences:
  • The Edison Escape Room (2020 Top Room #15)
  • The Roosevelt Escape Room (2020 Finalist)
  • The Great Houdini Escape Room (2020 Finalist)
  • Escape the Palace
  • Palace of Destiny
  • The Ruby Palace
  • The Sapphire Palace

Locurio

Location:
Seattle, WA, USA
Experiences:
  • The Storykeeper (2020 Top Room #37)
  • The Vanishing Act Remote (2020 Top Online Room #5)
  • The Vanishing Act (2020 Finalist)
  • The Mysteries of Noximillian
  • The Falswift Objective

No Exit

Location:
Athens, Greece
Experiences:
  • El Exorcista (2020 Top Room #4)
  • Death Row (2020 Finalist)
  • Route 666
  • The Mansion

Insomnia Corporation

Location:
Berga, Spain
Experiences:
  • The House [La Casa] (2020 Top Room #9)
  • The Doctor's Cocktail (2020 Finalist)
  • Xperiment (2020 Nominee)
  • Camping (2019 Finalist)

Escape Barcelona

Location:
Santa Coloma de Gramenet, Spain
Experiences:
  • Tomb Hunter: Akasha's Legend (2020 Top Room #31)
  • Alien: Origin (2020  Finalist)
  • Cybercity 2049
  • Jurassic Land
  • Pharaoh's Curse
  • The Lost Temple

The Maze

Location:
Petah Tikva, Israel
Experiences:
  • Cube (2020 Finalist)
  • The Sting (2020 Finalist)
  • Action! (2020 Nominee)

Omescape

Location:
Canada / USA
Experiences:
  • Pursuit of the Assassin Artist (2020 Top Online Room #1)
  • Chaos in the Galleria (2020 Finalist)
  • Joker's Asylum (2020 Nominee)
  • Nyctophobia: Fear of the Dark (2020 Nominee)
  • Kingdom of Cats
  • Forsaken Temple
  • Kingdom of Cat-tastrophy
  • Pandemic Zero
  • Sorcerer's Sanctum
  • and more!

Codex Escape Games

Location:
Laval, QC, Canada
Experiences:
  • The Night of the Wolf and the Serpent (2020 Finalist)
  • The Reflection of Madness (2020 Finalist)
  • Spaceship Graveyard (2020 Nominee)

Emergency Exit

Location:
Ashton-under-Lyne, UK
Experiences:
  • Virtual Exorcist (2020 Top Online Room #3)
  • The Beast (2020 Top Online Room #4)
  • Conjure
  • Exorcist
  • Poltergeist

Exit19.pl

Location:
Wrocław, Poland
Experiences:
  • Asylum [Obłęd] (2020 Top Room #43)
  • Betrayal in Breslau (2020 Finalist)
  • King Arthur's Dungeons (2020 Finalist)
  • Necromancer - Ritual of Death (2020 Finalist)
  • Time Machine - The Secret of Leonardo (2020 Finalist)
  • Volcano in Madagascar (2020 Finalist)
  • Murder at the Office (2020 Nominee)
  • Prison Escape (2020 Nominee)
  • and more!

The Escape Game

Location:
USA
Experiences:
  • Playground (2020 Finalist)
  • Prison Break (2020 Finalist)
  • Ruins: Forbidden Treasure Remote (2020 Finalist)
  • Special Ops: Mysterious Market (2020 Finalist)
  • Gold Rush (2020 Nominee)
  • Mission: Mars (2020 Nominee)
  • Ruins: Forbidden Treasure (2020 Nominee)
  • Classified
  • The Heist
  • Nashville
  • White Noise

DarkPark

Location:
Netherlands
Experiences:
  • The End (2020 Top Room #13)
  • The Honeymoon Hotel (2020 Finalist)
  • The Orphanage (2020 Finalist)
  • The Freakshow (2020 Nominee)
  • The Dentist
  • Conspiracy 19
  • Witchery Spell
  • Dear Santa

Immersia Escape Games Canada

Location:
Canada
Experiences:
  • Circus of Lost Souls (2020 Finalist)
  • Salutem Medicina Institute (2020 Finalist)
  • The Grand Immersia Hotel (2020 Finalist)
  • Warp Inc. (2020 Nominee)
  • The Forgotten Station
  • The Piccadilly Cabaret
  • Weekend at the Shack

The Adventure Is Real

Location:
London, UK
Experiences:
  • Agent Venture Mission 3: B.A.D Side of the Moon (2020 Top Online Room #7)
  • Agent Venture Mission 1: The Heist (2020 Finalist)
  • Agent Venture Mission 2: Cyborg Island (2020 Finalist)

Escaparium

Location:
Canada
Experiences:
  • The Legend of the Three Dragons (2020 Finalist)
  • The Lost Island of the Voodoo Queen (2020 Finalist)
  • The Wizard Four and the Book of Black Arts (2020 Finalist)
  • The Final Stop (2020 Nominee)
  • The Wizard Four and the Rise of Lord Thulsa (2020 Nominee)
  • Tyranno Industries (2020 Nominee)
  • and lots more!

The Basement

Location:
USA
Experiences:
  • The Courtyard (2020 Finalist)
  • The Elevator Shaft (2020 Finalist)
  • The Study (2020 Finalist)
  • The Basement (2020 Nominee)
  • Humana Festum
  • My Name Is Jamie

Tulleys Escape Rooms

Location:
Crawley, UK
Experiences:
  • Dodge City (2020 Finalist)
  • Mutiny (2020 Finalist)
  • Nethercott Manor (2020 Finalist)
  • The Outfitters
  • Kraken Casino
  • Uncle Tick-Tock's Circus
The Map

2020 Winners Map

For a larger version of the map, click here.

Awards and Rankings from Around the World

Top Regional Sites

The Top Escape Rooms Project's mission to find the best escape rooms in the world is clearly limited by the fact that the TERPECAs currently only recognize and honor rooms and companies that support English-speaking players and are in the countries and regions where such players are likely to visit. We humbly acknowledge that this approach fails to recognize many, many world-class escape rooms available around the world, so here we present a list of some of the most trusted websites from around the world that offer awards and rankings that we feel can help fill in many of the gaps left by our approach. We focus primarily on sites that offer aggregated recommendations, rankings, and awards that are derived from the opinions of many, rather than any sites that focus on the rankings or opinions of a single person or small group of people.

Note: The Top Escape Rooms Project has no official affiliation with any of the websites listed.

If you have any suggestions for more websites we should consider for this section, please contact us at admin@terpeca.com.

Всички стаи maintains listings of escape rooms across Bulgaria including user reviews and ratings.
EGA runs an annual awards ceremony celebrating the best games across China, as voted for by their panel of judges drawn from enthusiasts and industry experts.
Escape Room Awards is an annual competition for escape rooms in Spain run by Taty Hunter where a panel of judges, including enthusiasts and owners, choose the best escape rooms across the country.
Escape Room Guide offers a complete listing, map, and reviews of every escape room in Switzerland.
Escape the Review provides reviews and rankings for escape rooms by enthusiasts and bloggers in the United Kingdom and beyond. They also maintain the most comprehensive reviews and rankings for play-at-home games available in English around the world.
EscapeAll.gr lists most of the escape rooms in Greece and provides booking and reviews for them. It includes average user ratings for each game although there’s nowhere to see a sorted list.
EscapeGame•fr has a comprehensive list of escape rooms across France alongside information and user reviews and ratings. They also run the annual Escape Game Awards to decide the best escape rooms across France based on enthusiasts’ votes across the regions.
Escaper maintains a ranked list of games in Israel with Escape Certified Ratings, based on ratings given by users of the site.
EscapeRoomers.de compiles rankings across various cities and countries in Europe based on rankings from experienced enthusiasts. At the time of writing it includes rankings for games in Austria, Belgium, Bulgaria, the Czech Republic, France, Germany Greece, Hungary, the Netherlands, Spain, and Switzerland. They also publish a list of their top remote play games.
EscapeTalk.nl provides reviews and rankings from thousands of users for all the escape rooms in the Benelux region of Belgium, the Netherlands, and Luxembourg.
LockMe.pl provides reviews and rankings from thousands of users as well as comprehensive information and booking for all the escape rooms in Poland.
Methodology

Methodology

The Top Escape Rooms Project consists of two phases: a nomination phase and a ranking phase.

Phase 1: Nominations

In the nomination phase, pre-approved nominators (consisting of enthusiasts that have played 200 or more escape rooms) are asked to privately nominate up to 20 rooms that they feel should be considered in the conversation for best in the world. In 2020, nominators were also asked to nominate up to 10 online rooms as well, where the number of online room nominations could never exceed more than 10% of the total number of online rooms that person had played. In 2020, any room with three or more independent nominations was deemed to have sufficient support to move on to Phase 2, with the idea that for a room to be worthy of the distinction of being one of the best in the world, then it would surely be nominated by at least three people.

Owners, designers, consultants, investors, employees, and business affiliates with significant ongoing financial relationships are not allowed to nominate any of the corresponding rooms for which they may have a conflict of interest.

For a room to be eligible for nomination in 2020, there were two requirements. First, the room must have been open for at least 30 days between November 1, 2019 and October 31, 2020. Second, the room must be playable for a team consisting entirely of English-speaking players, and that fact must be verifiable online. Aside from these two rules, nominators were free to include any room they had played, using any criteria they felt was relevant to a room being considered one of the best in the world, including the very definition of what counts as an escape room.

Online rooms had specific guidance that was intended to include only games that included a hosted, time bounded, guided cooperative team journey of discovery and problem-solving through a (real or fictitious) space, in addition to being playable from home. These games generally fit the 'remote avatar' or 'actor/audio' categories on Escape the Review.

In 2020, a total of 186 enthusiasts contributed to Phase 1, resulting in 694 in-person rooms and 48 online rooms nominated, with 281 in-person rooms and 25 online rooms with enough independent nominations to move on to Phase 2. Companies that had at least two rooms of either type nominated and at least one room move on to Phase 2 were considered for the company awards, and 110 companies met this criteria. For the complete list of rooms that were nominated in Phase 1, see the Phase 1 Room Results and Phase 1 Online Room Results.

Phase 2: Rankings

In the ranking phase, pre-approved voters (consisting of enthusiasts that have played 50 or more escape rooms) are asked to provide a complete, ordered stack rank of the rooms that survived Phase 1. They are only allowed to rank rooms that they have played and for which they do not have a potential conflict of interest, as defined in the previous section.

Stack ranks are used for this process rather than numerical ratings because it forces participants to think hard about every entry in their stack, and this approach does not suffer from different people having different calibrations for numerical ratings. Stack ranks also have the nice property that you can always add new rooms at the very top as rooms worldwide get better and better without having to recalibrate your numbering system or add "6-star" ratings.

In 2020, a total of 587 enthusiasts provided rankings in Phase 2, including 177 of the 186 of those who contributed to Phase 1, and the output of these individual stack ranks provided the input to the final global rankings. The algorithm for generating a global ranking from a set of partial rankings is subject of substantial academic research and there is no universally agreed-upon method for generating such a result. TERPECA uses a fairly well-established method that was inspired by an academic paper about ranking college football teams that is itself based on the Perron-Frobenius theorem. In a nutshell, each stack rank is used to create all possible pairwise comparisons between rooms in that stack rank, and then those are used to create a matrix of scores between rooms using all the direct comparisons from any of the participants. To make the analogy to the college football analysis, we consider the score of a match between two rooms to be a combination of any direct comparisons that can be made between two rooms and any transitive, secondary comparisons that can be made between a pair of rooms. A small correction is added using the Wilson score binomial confidence interval to ensure that more confidence is given when more comparisons between the same two rooms are available. The algorithm for exactly how to calculate secondary comparisons and the appropriate relative weighting of those with respect to primary comparisons was changed slightly between 2019 and 2020 to improve the ranking to better represent the underlying data. Finally, the eigenvector corresponding to the greatest eigenvalue is calculated, and the entries in this eigenvector is used as the score for each room.

The results given by this analysis were studied in detail to verify that the final rankings stood up to careful scrutiny when comparing two rooms to each other based on all the stack ranks that included both, but this data is excluded from the final report because it can be used in some cases to infer individual preferences between rooms. Suffice it to say that we are quite confident that the outcome here faithfully represents the data provided by those participating in the project.

In 2018, companies were ranked using the same process as rooms, however, participants expressed difficulty in ranking companies, and the results indicated that company results were highly enough correlated with room results that we could generate the company rankings in 2019 from the room results instead. So, company results since 2019 are now generated based on the findings from the 2018 results applied to the current data, and roughly works based on the observation that two or more games in a higher ranking tier is weighed more heavily than more games in a lower tier. A nomination or finalist in the online room category were counted with the same weight as an in-person room, and a winning online room counted the same as Top 100 in-person room. The only exception to this is that if a company was nominated for both an online and in-person version of the same room, the two versions could only contribute at most 1.5 towards a given tier.

Ultimately this analysis provided an aggregated stack rank of all the rooms and all the companies in Phase 2, but we have chosen only to recognize a subset of these rooms and companies as official award winners. The main reason for this is that three nominations to reach Phase 2 was a pretty low bar designed to make sure that the very best possible rooms and companies would make the list if any three participants had played them, but it did not guarantee that those that did get nominated actually were significantly better than, say, those that got only one nomination in Phase 1. Regardless, we still present complete final rankings of rooms and companies from the Phase 2 analysis, which you can find in the Phase 2 Room Results, Phase 2 Online Room Results, Phase 2 Company Results.

General Notes and Caveats

It should be noted that while there are nominators and voters from many countries, and the project continues to grow, there are still some regions that have had far more players than others. As a result, rooms from some of the less well-played countries (such as Australia, Israel, Poland, and Canada) are limited as to how high on the list they can reach, given that there is the limit to the extrapolation we can do when there is not a lot of comparison data about a given room. We had hoped that this would improve considerably in 2020, but with the pandemic, improvements on this front were limited. We still hope and expect that as rooms from new countries show up on the list, more enthusiasts will play them, and in future years, those regions can find their "proper" place in the rankings.

Second, as the TERPECAs are currently targeted specifically to an English-speaking audience, we acknowledge that the claim of finding the "best rooms in the world" is a bit dubious. As such, until the scope of the project is expanded to include other languages, starting in 2020 we have added a new section that highlights the best websites from around the world that provide high-quality awards or rankings in other languages or in regions that are not currently served well by this project.

Finally, the methodology chosen does have a bias that the more rooms someone has played, the bigger an impact they'll have in the rankings, as they'll be able to provide significantly more comparisons between rooms. We accept this as a feature, not a bug, as we believe that it is certainly a defensible position that those with more experience be given greater weight in this regard.

Phase 1 Room Results

2020 Phase 1 Room Results

The following 693* rooms were nominated by at least one nominator in Phase 1. Each nomination means that someone with 200 or more rooms of experience decided to list that room as one of their all time top 20. The number of independent nominations is shown in parentheses. The 281 rooms with three or more nominations moved on to Phase 2 as finalists and are shown in bold. This list should explicitly not be taken to be a meaningful ranking, as the geographic distribution of the participants was not uniform.

* Originally we announced 698 nominees, but some were later found not to have been eligible and were subsequently removed.

An Avalanche of Oblivion [Una avalancha del olvido] - Claustrophobia (Escaldes-Engordany, Andorra) (14)
Cinema of Despair [Cine de la desesperanza] - Claustrophobia (Escaldes-Engordany, Andorra) (2)
The Other Side (Stranger Things) [El otro lado (Stranger Things)] - Eureka LEG (Buenos Aires, Argentina) (1)
The Vault - Escape Rooms Canberra (Canberra, Australia) (1)
The Hotel - Riddle Room (Australia) (Canberra, Australia) (1)
Executioner's Toolshed - Seraphim Escape (Ipswich, Australia) (1)
Chapter 3: The Last Stand - The Mystery Rooms (Melbourne, Australia) (1)
Deep Space: Termination - Ukiyo (Melbourne, Australia) (1)
The Crumbling Prince - Ukiyo (Melbourne, Australia) (1)
Unstoppable - Mission Sydney (Sydney, Australia) (1)
Ex Libris - Next Level Escape (Sydney, Australia) (2)
The Doll House - Scram Escape Rooms (Sydney, Australia) (1)
Bank Heist - Social Escape Rooms Sydney (Sydney, Australia) (1)
Espionage - The Cipher Room (Sydney, Australia) (2)
The Marlowe Hotel - The Cipher Room (Sydney, Australia) (2)
Going Underground - Crime Runners (Vienna, Austria) (16)
The Nun - NoWayOut (Vienna, Austria) (1)
Submarine Bunker - Escape Rush (Brussels, Belgium) (4)
The White House, Secrets of the Culper Ring - Escape Rush (Brussels, Belgium) (3)
Jumanji - The Missing Link (Geel, Belgium) (1)
Cube [Kubus] - Locked Gent (Gent, Belgium) (2)
Power Boating for Dummies - Create Your Escape (Kasterlee, Belgium) (1)
The Secret of Saint-Rumoldus [Het geheim van Sint-Rumoldus] - De Gouden Kooi (Mechelen, Belgium) (9)
The Hunting Season - Escaperoom Antwerp (Zoersel, Belgium) (2)
Alice in Wonderland [Alice no País das Maravílhas] - Escape Club (Sao Paulo, Brazil) (1)
Al Capone's Secret Bar [Тайният бар на Ал Капоне] - 3KEY Rooms (Sofia, Bulgaria) (3)
BlueLab - Endorphin Games (Sofia, Bulgaria) (7)
The Crystal Skull [Кристалният череп] - Escapeway (Sofia, Bulgaria) (1)
The Secret Of Kryptos [Тайната на Криптос] - Myst Entertainment (Sofia, Bulgaria) (7)
Room 66 II - Room 66 (Sofia, Bulgaria) (2)
SawRoom: Game Over - SawRoom (Sofia, Bulgaria) (1)
SawRoom: The Revenge - SawRoom (Sofia, Bulgaria) (4)
Atlantis [Атлантида] - Teorema Escape Rooms (Sofia, Bulgaria) (11)
The Triwizard Trials - Improbable Escapes (Kingston, ON, Canada) (1)
Below Zero - Crypto Escape Rooms (Newmarket, ON, Canada) (4)
The Lost Shipwreck - Crypto Escape Rooms (Newmarket, ON, Canada) (1)
Saboteur - The Crux Escape Rooms (Niagara Falls, ON, Canada) (1)
Deliverance - Room Escape Ottawa (Ottawa, ON, Canada) (1)
Nyctophobia: Fear of the Dark - Omescape (Scarborough, ON, Canada) (1)
Haunting of Noriko - Escape Games Canada (Toronto, ON, Canada) (1)
The Missing Will - Escape Games Canada (Toronto, ON, Canada) (1)
13 Sedah Ave - Ready Set Go Adventures / No Way Out Escape Rooms (Toronto, ON, Canada) (1)
AI's Martyrdom - Revo Escape (Toronto, ON, Canada) (2)
The Lab: Lockdown - Revo Escape (Toronto, ON, Canada) (3)
Black Creek Pioneer Village: Where Dark Things Dwell - Secret City Adventures (Toronto, ON, Canada) (1)
King of the Bootleggers - Secret City Adventures (Toronto, ON, Canada) (3)
Murdoch Mysteries Escape Game: The Secret of Station House No. 4 - Secret City Adventures (Toronto, ON, Canada) (1)
The Grand Wilshire Hotel - The Imaginarium (Toronto, ON, Canada) (3)
Missing [Disparue] - Enigma-Tic (Blainville, QC, Canada) (2)
Circus of the Lost Souls [Le Cirque des Âmes Perdues] - Immersia Escape Games Canada (Boisbriand, QC, Canada) (7)
Salutem Medicina Institute [L'Institut Salutem Medicina] - Immersia Escape Games Canada (Boisbriand, QC, Canada) (3)
The Grand Immersia Hotel [Le Grand Immersia Hotel] - Immersia Escape Games Canada (Boisbriand, QC, Canada) (12)
Spaceship Graveyard [Tombeau Spatial] - Codex Escape Games (Laval, QC, Canada) (2)
The Night of the Wolf and the Serpent [La Nuit du Loup et du Serpent] - Codex Escape Games (Laval, QC, Canada) (10)
The Reflection of Madness [Le Reflet de la Folie] - Codex Escape Games (Laval, QC, Canada) (8)
The Final Stop [Le Dernier Arrêt] - Escaparium (Laval, QC, Canada) (2)
The Lost Island of the Voodoo Queen [L'Île perdue de la Reine Vaudou] - Escaparium (Laval, QC, Canada) (8)
Warp Inc. - Immersia Escape Games Canada (Laval, QC, Canada) (1)
The Wizard Four and the Book of Black Arts [Les Quatre Sorciers et le Grimoire de l'Art Obscur] - Escaparium (Montreal, QC, Canada) (7)
The Wizard Four and the Rise of Lord Thulsa [Les Quatre Sorciers et l'Ascension du Seigneur des Ténèbres] - Escaparium (Montreal, QC, Canada) (1)
Tyranno Industries [Les Industries Tyranno] - Escaparium (Montreal, QC, Canada) (2)
Tomb of Anubis - X-Cape (Montréal, QC, Canada) (1)
John Jackson's Estate [Succession de John Jackson] - Sauve Qui Peut (Québec City / Saint-Jean-sur-Richelieu, QC, Canada) (1)
Screaming Metal [Ferrailles hurlantes] - Cabinet Mysteriis (Québec City, QC, Canada) (2)
The Dreamwalkers [Marcheurs de rêves] - Cabinet Mysteriis (Québec City, QC, Canada) (5)
The Longest Night [La nuit la plus longue] - Eliviascape (Québec City, QC, Canada) (1)
"Dead" Zone [Zone "Morte"] - À Double Tour (Québec City, QC, Canada) (1)
The Secret of the Dunes [Le Secret des Dunes] - À Double Tour (Québec City, QC, Canada) (1)
Dream Weekend [Weekend de Rêve] - Sauve Qui Peut (Saint-Jean-sur-Richelieu, QC, Canada) (3)
Undercover Bar [Le Bar Clandestin] - Sauve Qui Peut (Saint-Jean-sur-Richelieu, QC, Canada) (1)
Vortex Past [Vortex Passé] - Sauve Qui Peut (Saint-Jean-sur-Richelieu, QC, Canada) (1)
Wrath of Poseidon [La Colère de Poséidon] - Sauve Qui Peut (Saint-Jean-sur-Richelieu, QC, Canada) (7)
The Tavern [La taverne] - Évasion Top Chrono (Saint-Jérome, QC, Canada) (1)
The Legend of the Three Dragons [La Légende des Trois Dragons] - Escaparium (Sherbrooke, QC, Canada) (3)
Mission Gnome-Possible [Mission Nain-Possible] - SOS Aventures (St-Jérome, QC, Canada) (2)
Morgue - Endorfin (Prague, Czech Republic) (2)
An incredible story of Nautilus [Dechberoucí příběh ponorky Nautilus] - MindMaze (Prague, Czech Republic) (2)
Galactic Pioneers - MindMaze (Prague, Czech Republic) (8)
Haunted House - The Chamber (Prague, Czech Republic) (10)
Haunted House 2: Poltergeist - The Chamber (Prague, Czech Republic) (11)
Zodiac Patres / Medieval Dungeon - The Chamber (Prague, Czech Republic) (1)
Cemetery [HŘBITOV] - The Padlock (Prague, Czech Republic) (1)
Mission #53 [Mise #53] - The Padlock (Prague, Czech Republic) (2)
Interview [Töövestlus] - Affect Laboratories (Tallinn, Estonia) (3)
Exfiltration - Get Out (Amiens, France) (1)
Celestia - L'Atelier des Énigmes (Annecy, France) (3)
Super Game Colors - L'Atelier des Énigmes (Annecy, France) (1)
Einstein's Letter [La Lettre d’Einstein] - Le Passage (Bordeaux, France) (6)
The Cube [Le Cube] - One Brain (Lille, France) (1)
Demogorgon - Game of Room (Lyon, France) (2)
Soviet - Odysseus (Lyon, France) (1)
The Blackwood Affair [L’Affaire Blackwood] - Wake Up (Lyon, France) (4)
Mission Tokyo - Escape Time (Montauban / Tours, France) (2)
Dollmaker - LiveCorp (Montpellier, France) (2)
Unity - LiveCorp (Montpellier, France) (1)
The Robert Hart Affair [L'Affaire Robert Hart] - Quest Agency (Nice, France) (1)
Room 113 - Artimus (Paris, France) (1)
The Live Thriller - Borderlive Concepts (Paris, France) (3)
The Pirate's Secret [Le Secret du Pirate] - HintHunt (Paris, France) (1)
Evolvis Mission - SF Adventure [Mission Evolvis - Aventure SF] - Immersia Escape Game France (Paris, France) (2)
Time Machine - L'Antichambre (Paris, France) (2)
La Pièce Odyssey [L'Odyssée de la Pièce] - La Pièce (Paris, France) (3)
L.A. Confidential - Lock Academy (Paris, France) (7)
Little Miss Lock [Très Cher Lock] - Lock Academy (Paris, France) (2)
Revolt at Lock Academy [Révolte à la Lock] - Lock Academy (Paris, France) (10)
Lost Asylum - One Hour (France) (Paris, France) (3)
The Slaughterhouse [L'Abattoir] - One Hour (France) (Paris, France) (12)
Fairy Tale Regulations [Règlement de Contes] - Pandore & Associés (Paris, France) (6)
Alice - Phobia Escape Games (Paris, France) (2)
House of Ghosts [Les Disparus] - Phobia Escape Games (Paris, France) (1)
Cannibal Island - Quest Factory (Paris, France) (4)
The Cursed Crypt [La Crypte Maudite] - Skeleton Key (Paris, France) (1)
Mafia District - Team Time (Paris, France) (1)
Soviet Menace [Menace Soviétique] - The Escape Agency (Paris, France) (1)
The French Robbery [Braquage à la française] - The Game (France) (Paris, France) (1)
The Metro [Le Métro] - The Game (France) (Paris, France) (4)
The Plane [L'Avion] - The Game (France) (Paris, France) (3)
Jungle Quest - Escape Dimension (Perpignan, France) (3)
Mystery on Lived Street [Mystère à Lived Street] - Escape Dimension (Perpignan, France) (4)
The Aztec Temple: The MAYA Prophecy [Le Temple Azteque: La Prophétie MAYA] - The Little Red Door (Strasbourg, France) (2)
The Last Robbery [Le Dernier Casse] - The Little Red Door (Strasbourg, France) (1)
In the Footsteps of the Guardians [Sur les traces des gardiens] - Projet Dédale (Toulouse, France) (3)
Biggs - The Legacy - Exit Berlin (Berlin, Germany) (1)
Last Human / Trabi Race 2030 - Final Escape (Berlin, Germany) (1)
The Puppeteer - Final Escape (Berlin, Germany) (1)
The Executioner [Der Henker] - House of Tales (Berlin, Germany) (6)
Alien Grill - Illuminati Escape (Berlin, Germany) (2)
Alice in Smartland [Alice im Smartland] - Smart Rooms (Berlin, Germany) (1)
Beast of Berlin - The Room (Berlin, Germany) (5)
Ghosthunter Brandon Darkmoor [Geisterjäger Brandon Darkmoor] - The Room (Berlin, Germany) (15)
Go West - The Room (Berlin, Germany) (3)
The Lost Treasure of Alexander von Humboldt - The Room (Berlin, Germany) (22)
The Alley [Die Gasse] - Rätselraum Ruhrpott (Bochum, Germany) (6)
Mjölnir - Fugio (Bonn, Germany) (2)
Yarrum's Magic Hut [Yarrums magische Hütte] - Timebreak (Bonn, Germany) (2)
The Secret Elixir [Das geheime Elixier] - Hidden Games (Braunschweig, Germany) (3)
The Poltergeist [Der Poltergeist] - The Code Agency (Düsseldorf, Germany) (3)
The Search for the Scepter of Light [Die Suche nach dem Zepter des Lichts] - The Code Agency (Düsseldorf, Germany) (3)
The Forest [Der Wald] - Room Fox (formerly Tumult Live Escape Games) (Frankfurt am Main, Germany) (1)
Private Detective Sir Peter Morgan and “The Heir of Dracula” [Privatdetektiv Sir Peter Morgan und “Der Erbe Draculas”] - Alma Park (Gelsenkirchen, Germany) (1)
The Search for the Holy Grail [Die Suche nach dem Heilige Gral] - Alma Park (Gelsenkirchen, Germany) (1)
Time Doctors - Adventure Team (Hamburg, Germany) (1)
Neptune's Curse [Der Fluch des Neptun] - Hidden Games (Hamburg, Germany) (12)
The Forbidden Game [Das verbotene Spiel] - Hidden Games (Hamburg, Germany) (1)
The Golden Skull [Der goldene Schädel] - Hidden Games (Hamburg, Germany) (1)
The Master of Time [Der Meister der Zeit] - Hidden Games (Hamburg, Germany) (1)
Ghost Hunter Ernie Hudson and the Wailing Woman [Geisterjäger Ernie Hudson und die weinende Frau] - Skurrilum (Hamburg, Germany) (20)
Ghost Hunter Ernie Hudson and the Zoo of Death [Geisterjäger Ernie Hudson und der Zoo des Todes] - Skurrilum (Hamburg, Germany) (12)
Panzerknacker - The Art of Stealing [Panzerknacker - Die Kunst des Stehlens] - Limbus Escape Center (Krefeld, Germany) (5)
The Treasure of Calico Jack [Der Schatz von Calico Jack] - Mission Exit (Magdeburg, Germany) (1)
Dr. Brown Boyd's Mental Hospital [Dr. Brown Boyd's Nervenheilanstalt] - Exit Out (Mönchengladbach, Germany) (2)
Geldrausch - 66 Minuten (Neuwied, Germany) (4)
The Trophy Collector [Der Trophäensammler] - 66 Minuten (Neuwied, Germany) (2)
The Trident of Poseidon [Der Dreizack Poseidons] - Escape Rooms Trier (Trier, Germany) (1)
Don't Take a Breath - Verone (Acharnes, Greece) (10)
The Prison - Adventure Arena (Athens, Greece) (2)
The Order Of Light - Brain Cells (Athens, Greece) (7)
Rebellion - Clock Escape Rooms (Athens, Greece) (6)
Woman in Black - Coven Escape Rooms (Athens, Greece) (12)
Act II: The Litchver Woodland - Dare Escape Rooms (Athens, Greece) (7)
Another Dimension - Esc Rooms (Athens, Greece) (3)
Lethal Decision - EscapeClue (Athens, Greece) (2)
Room 107: Otherside - Escaped (Athens, Greece) (8)
Room 201: Immortal - Escaped (Athens, Greece) (6)
Room 202: Paranoic II - Escaped (Athens, Greece) (1)
Cosmos 05: Death in Space - Escapepolis (Athens, Greece) (19)
Roswell 1947 - Escapepolis (Athens, Greece) (2)
The Creepy Store and the Lost Souls - Escapepolis (Athens, Greece) (8)
The Dark Side of Elements - Exit Plan (Athens, Greece) (4)
The Survivor - Great Escape Rooms (Athens, Greece) (1)
Psychosis - Illusion Escape Rooms (Athens, Greece) (1)
Escape the Car - Killer - Lockbusters (Greece) (Athens, Greece) (8)
The Lockwood Manor [Η Έπαυλη Lockwood] - Lockhill (Athens, Greece) (4)
The Sanatorium (Day Mode) [Το Σανατόριο (Μέρα)] - Lockhill (Athens, Greece) (3)
The Sanatorium (Midnight Mode) [Το Σανατόριο (Μεσάνυχτα)] - Lockhill (Athens, Greece) (13)
The Sanatorium (Night Mode) [Το Σανατόριο (Νύχτα)] - Lockhill (Athens, Greece) (9)
The Emperor's Masterchef is Dead - Mister.E (Athens, Greece) (5)
Requiem - Mysterylab (Athens, Greece) (12)
Katharsis - Caves of Banjul - No Escape (Athens, Greece) (4)
Death Row - No Exit (Athens, Greece) (17)
El Exorcista - No Exit (Athens, Greece) (28)
Paradox Project 2: The Bookstore [Paradox Project 2: To Βιβλιοπωλείο] - Paradox Project (Athens, Greece) (41)
Paradox Project 3: The Music Academy [Paradox Project 3: Το Ωδείον] - Paradox Project (Athens, Greece) (15)
Paradox Project: The Mansion [Paradox Project: Η Έπαυλη] - Paradox Project (Athens, Greece) (19)
Swamp Of Sorrows: Death And Despair - Room 54 (Athens, Greece) (4)
Cube² - Sherlocked Homes (Athens, Greece) (1)
The Cursed Willy - Sherlocked Homes (Athens, Greece) (10)
Wake Up - Station 33 (Athens, Greece) (14)
The Mine Box - The Box (Greece) (Athens, Greece) (4)
The Temple Box - The Box (Greece) (Athens, Greece) (2)
Dark Seas - The Brainfall Hotel (Athens, Greece) (1)
Mrs. Rose's House - The Darkwood Village (Athens, Greece) (9)
Red Riding Hood - The Mind Hunters (Athens, Greece) (4)
Silent Hills pt.2 - The Mindtrap (Athens, Greece) (2)
Experimentum X - Trapped (Greece) (Athens, Greece) (4)
The Tiki Bay - Way Out Escape Rooms (Greece) (Athens, Greece) (1)
Heaven and Hell [Menny és Pokol] - E-Exit (Budapest, Hungary) (1)
Santa Muerte - E-Exit (Budapest, Hungary) (7)
Secret Subway [Titkos Metró] - E-Exit (Budapest, Hungary) (5)
Enigma Mission [Enigma Küldetés] - Enigma (Budapest, Hungary) (1)
White Mission [Fehér szoba] - Gozsdu Mission (Budapest, Hungary) (3)
House of Escobar [House of Escobar] - Locked Room Budapest (Budapest, Hungary) (2)
Secret of the Depth [A mélység titka] - Mystery Games (Budapest, Hungary) (1)
Pirate Bay [Kalóz Öböl] - Mystique Room (Budapest, Hungary) (2)
Time Machine Steampunk [Időgép Steampunk Időutazás] - Mystique Room (Budapest, Hungary) (2)
Pirate Cave [Kalózbarlang] - Pirate Cave Escape Room (Budapest, Hungary) (4)
Convicts - Escape Boats (Dublin, Ireland) (1)
SOS - Escape Boats (Dublin, Ireland) (1)
Pirates' Robbers [שודדי הפיראטים] - Escape Life / Exit Room Israel (Ashdod, Israel) (3)
Grease [גריז] - Amazon Escape (Holon, Israel) (2)
Hansel and Gretel [עמי ותמי] - Amazon Escape (Holon, Israel) (2)
Moonshine [מונשיין] - Open The Door (Jerusalem, Israel) (2)
The Knights' Watch [חדר בריחה אבירי הלילה] - QuesTeam (Merhavia, Israel) (2)
Prophecy [הנבואה] - My Real Quest (Nesher, Israel) (3)
The Knights' Duel [דו-קרב אבירים] - Lasertag Poleg (Netania, Israel) (2)
Camp 23 [מחנה 23] - Escape Room Israel / BrainIT (Petah Tikva, Israel) (1)
The Vikings [הויקינגים] - Escape Sign (Petah Tikva, Israel) (3)
Action! [אקשן!] - The Maze (Petah Tikva, Israel) (1)
Cube [קיוב] - The Maze (Petah Tikva, Israel) (5)
The Sting [העוקץ] - The Maze (Petah Tikva, Israel) (4)
Money Heist [בית הנייר] - Inside Out (Ra'anana, Israel) (1)
The Intervention [ההתערבות] - Escape Center (Rishon LeZion, Israel) (6)
Gulliver's Travels [מסעות גוליבר] - Sherlocked Israel (Rishon LeZion, Israel) (2)
The Puppets: Silent Diving [שקט צוללים - The Puppets] - Show Time (Rishon LeZion, Israel) (1)
The Puppets: Silent Photographers [שקט מצלמים - The Puppets] - Show Time (Rishon LeZion, Israel) (2)
Hollywood 117 [הוליווד 117] - Hype Esc (Tel Aviv, Israel) (4)
The Six - Hype Esc (Tel Aviv, Israel) (1)
Eurovision Pizza Party [מסיבת הפיצה לאירוויזיון] - Panica Escape (Tel Aviv, Israel) (2)
112 Mercer St. [מרסר 112] - QuestAir (Tel Aviv, Israel) (1)
The Wizard of Oz [הקוסם מארץ עוץ] - Sherlocked Israel (Tel Aviv, Israel) (1)
The Tomb [La Tomba] - Trap Milano (Milan, Italy) (2)
The Ring: Samara | Origins - Escape Room Roma (Rome, Italy) (2)
Escape from The Red Room - SCRAP (Tokyo, Japan) (6)
Race against Time [Lenktynės su laiku] - Insight Out (Vilnius, Lithuania) (3)
The Forbidden Castle - Can You Escape? Malta (Fgura, Malta) (1)
Hannibal - Room 125 (Santa Venera, Malta) (1)
The Amsterdam Catacombs - Logic Locks (Amsterdam, Netherlands) (19)
Judgment Day - My Escape Club (Amsterdam, Netherlands) (3)
The Vault - Sherlocked Netherlands (Amsterdam, Netherlands) (17)
The Dome - Escape Room Nederland (Bunschoten, Netherlands) (46)
The Girl's Room [De Meisjeskamer] - Escape Room Nederland (Bunschoten, Netherlands) (10)
Freakshow - DarkPark (Delft, Netherlands) (1)
Catch Me If You Can - Next Level (Eindhoven, Netherlands) (15)
Grolle in 1627. A Murder Plot. Will you save Prince Frederik Hendrik? - Escaperoom Groenlo (Groenlo, Netherlands) (2)
Bella Ciao - Escape Game Katwijk (Katwijk, Netherlands) (5)
Escape from Wonderland - Escape from Wonderland (Leiden, Netherlands) (3)
The Ram Raid [De Ramkraak] - ROX Escape Experience (formerly Project Escape) (Nijmegen, Netherlands) (1)
Jason's Curse - The Escape Room Rijswijk (Rijswijk, Netherlands) (1)
The Execution - The Escape Room Rijswijk (Rijswijk, Netherlands) (6)
The Asylum Revealed - Mystery House (Valkenburg, Netherlands) (1)
WW-II: Press Room [Het Verzet] - Team Trapped (Venlo, Netherlands) (1)
Room 237 [Kamer 237] - Kamer 237 (Volkel, Netherlands) (17)
Flight 815 - Down the Hatch (Voorburg, Netherlands) (5)
Molly's Game - Down the Hatch (Voorburg, Netherlands) (1)
The Cooper Case - Down the Hatch (Voorburg, Netherlands) (1)
The End - DarkPark (Zoetermeer, Netherlands) (25)
The Honeymoon Hotel - DarkPark (Zoetermeer, Netherlands) (8)
The Orphanage - DarkPark (Zoetermeer, Netherlands) (8)
The Experiment - The Great Escape (Zwolle, Netherlands) (2)
Into the Dark - CodeBreakers (Christchurch, New Zealand) (2)
The Lost Hut of Antarctica - CodeBreakers (Christchurch, New Zealand) (1)
Stripclub Escape R18 - Rotofobia (Rotorua, New Zealand) (1)
In the Shadow of the Pyramids [W cieniu piramid] - Wyjście Awaryjne (Bydgoszcz / Warsaw, Poland) (16)
Nautilus: The Underwater Adventure [Nautilus: Podmorska Przygoda] - Wyjście Awaryjne (Bydgoszcz / Warsaw, Poland) (8)
The Legend of the Sword [Legenda Miecza] - Wyjście Awaryjne (Bydgoszcz / Warsaw, Poland) (10)
Freakshow - Break The Brain (Bydgoszcz, Poland) (8)
In a galaxy far, far away... [W odległej galaktyce] - Break The Brain (Bydgoszcz, Poland) (1)
Insanity [Obłęd] - Break The Brain (Bydgoszcz, Poland) (3)
Superheroom - Mr Lock (Bydgoszcz, Poland) (7)
The Curse of Blackbeard [Klątwa Czarnobrodego] - Mr Lock (Bydgoszcz, Poland) (1)
Operation: Metro [Operacja: Metro] - Wyjście Awaryjne (Bydgoszcz, Poland) (6)
The Mystery of Nile's Emperor [Tajemnica Władcy Nilu] - Wyjście Awaryjne (Bydgoszcz, Poland) (6)
Anxiety [Niepokój] - ER 1871 Inny Wymiar (Chorzów, Poland) (2)
Cabinet of Curiosities [Gabinet Osobliwości] - Dom Tajemnic (Częstochowa, Poland) (6)
Queen of the Vampires [Królowa Wampirów] - Dom Tajemnic (Częstochowa, Poland) (3)
The Moonshiner - Zorkout Escape Rooms (Gdańsk, Poland) (2)
Temple of Doom [Świątynia Zagłady] - Open The Lock (Gliwice, Poland) (3)
Gates of Time - Tortuga [Wrota Czasu - Tortuga] - TickTack (Gliwice, Poland) (6)
Location [Lokalizacja] - TickTack (Gliwice, Poland) (9)
City Tunnels [Tunele pod miastem] - Quest Cage (Katowice, Poland) (4)
Moriarty Ltd [Moriarty sp. z o.o.] - Quest Cage (Katowice, Poland) (11)
The Yellow Sign [Żółty Znak] - Action Escape (Poznań, Poland) (3)
Vampire [Wampir] - Exodus (Poznań, Poland) (5)
In Da Club - In Da Club (Escapelandia) (Poznań, Poland) (1)
Primadonna - Operator Zagadek (Poznań, Poland) (1)
Mysterious Forest [Tajemniczy las] - Przygodownia (Escapelandia) (Poznań, Poland) (1)
Prisoned in a Fallout [Osadzeni w Bunkrze] - 8 Gates Escape Room (Warsaw, Poland) (2)
Cursed Painting [Przeklęty Obraz] - Black Cat Escape Room (Warsaw, Poland) (2)
Nazi Gold [Złoto nazistów] - Black Cat Escape Room (Warsaw, Poland) (3)
Pegazus - Dom Zagadek (Warsaw, Poland) (1)
Cursed Island [Przeklęta wyspa] - Escape Project (Warsaw, Poland) (4)
Ultimatum: Live or Die.. Make Your Choice - House Escape (Warsaw, Poland) (3)
Who Is Max Winckler? [Kim Jest Max Winckler?] - Mysterious Room (Warsaw, Poland) (2)
Musketeers [Spisek kardynała] - Room Escape Warszawa (Warsaw, Poland) (1)
Asylum [Obłęd] - Exit19.pl (Wrocław, Poland) (10)
Betrayal in Breslau [Zdrada w Breslau] - Exit19.pl (Wrocław, Poland) (7)
King Arthur's Dungeons [Lochy Króla Artura] - Exit19.pl (Wrocław, Poland) (8)
Murder at the Office [Skarbówka - Tajemnicza Zbrodnia] - Exit19.pl (Wrocław, Poland) (1)
Necromancer - Ritual of Death [Nekromanta - Rytuał Śmierci] - Exit19.pl (Wrocław, Poland) (6)
Prison Escape - Exit19.pl (Wrocław, Poland) (2)
Time Machine - The Secret of Leonardo [Wehikuł Czasu - Tajemnica Leonarda] - Exit19.pl (Wrocław, Poland) (7)
Volcano in Madagascar [Duch Wulkanu - Człowieki w Kotle] - Exit19.pl (Wrocław, Poland) (3)
Midnight Killer MK II - Piwnica Quest (Wrocław, Poland) (7)
Paranoia [Paranoja] - Tkalnia Zagadek (Łódź, Poland) (2)
The Last Adventure of Indiana Jones [Ultima aventura a lui Indiana Jones] - Escape Arena (Bucharest, Romania) (1)
Coven - The Void Escape Room (Bucharest, Romania) (1)
GhostHunters [Охотники на привидений] - Claustrophobia (Moscow, Russia) (5)
Insane Paranoid - Quest-Art (Moscow, Russia) (4)
Rage - Quest-Art (Moscow, Russia) (1)
Silent Hell [Сайлент Хэлл] - QuestReality / Quest Street (Moscow, Russia) (1)
Tesla’s Genius Mind [Teslin genijalni um] - Adrenalin Escape Rooms (Belgrade, Serbia) (1)
Murder at the Masonic Lodge [Ubistvo u Masonskoj loži] - Pin Escape Rooms (Belgrade, Serbia) (1)
The Game Escape Room Bled - The Game Escape Room (Slovenia) (Bled, Slovenia) (2)
Redlight Casino - Enigmarium (Maribor, Slovenia) (1)
Yucatan: The Last Temple [Yucatán: El último Templo] - Coco Room (Alicante / Compostela / Zaragoza, Spain) (7)
Abduction 3: The Exam - Abduction (Badalona, Spain) (26)
Abduction 4: Enterprises - Abduction (Badalona, Spain) (4)
Barum Dum - Cinema Escape (Barcelona, Spain) (5)
The Brewery [La Cerveseria] - Enigmik (Barcelona, Spain) (21)
Zombie Outbreak - Fear Escape Room (Barcelona, Spain) (1)
Futura - Futura (Barcelona, Spain) (6)
Catacombs [Catacumbas] - Golden Pop (Barcelona, Spain) (16)
Catalepsy [Catalepsia] - Horror Box (Barcelona, Spain) (7)
Ouija - Horror Box (Barcelona, Spain) (3)
The Diamond of Souls [El diamante de almas] - Inmortal Room (Barcelona, Spain) (7)
Kidnapped in Barcelona - Kidnapped in BCN (Barcelona, Spain) (3)
Darkness [Oscuridad] - Maximum Escape (Barcelona, Spain) (2)
The Dungeon: The Last Round [La Mazmorra: la última partida] - Maximum Escape (Barcelona, Spain) (1)
Ulysses Spaceship [Nave Ulysses] - Maximum Escape (Barcelona, Spain) (6)
Vault 27 [Refugio 27] - Maximum Escape (Barcelona, Spain) (9)
Explosives Specialist [Artificiero] - Open Mind Room Escape (Barcelona, Spain) (7)
S.W.A.T. Mission [Misión S.W.A.T.] - Open Mind Room Escape (Barcelona, Spain) (2)
Picadero Motel: Room 13 [Picadero Motel: Habitación número 13] - Picadero Motel (Barcelona, Spain) (1)
The Takeover [La toma de control] - Prison Experience (Barcelona, Spain) (1)
Whitechapel: La historia de Charlotte - Whitechapel (Barcelona, Spain) (8)
The Doctor's Cocktail [El Cóctel del Doctor] - Insomnia Corporation (Berga, Spain) (3)
The House [La Casa] - Insomnia Corporation (Berga, Spain) (9)
Xperiment - Insomnia Corporation (Berga, Spain) (1)
Dino Rising Blue Team [Dino Rising Equipo Azul Corp] - Dino Rising Experience (Mad Mansion) (Bilbao, Spain) (10)
Dino Rising Red Team [Dino Rising Equipo Rojo Omega] - Dino Rising Experience (Mad Mansion) (Bilbao, Spain) (10)
Entrenched [Atrincherados] - Conecta Escape / Experiencity (Cerdanyola del Valles / Madrid, Spain) (13)
Gladiators [Gladiadores] - Escape Masnou (El Masnou, Spain) (1)
Vikings [Vikingos] - Unreal Room Escape (Gava, Spain) (1)
Elkano Escape Room [Elkano Ihes Gela] - Experientziak (Getaria, Spain) (13)
Frankenstein's Girlfriend [La novia de Frankenstein] - Yurmuvi (Gijón, Spain) (5)
School of Magic [Escuela de Magia] - Yurmuvi (Gijón, Spain) (3)
Inmortum - Hostal 83 (Gironella, Spain) (2)
The Initiative [La iniciativa] - La Iniciativa Escape Room (Granollers, Spain) (1)
The Mine [La mina] - Unreal Room Escape (Hospitalet de Llobregat / Irun, Spain) (25)
The Narcos - Unreal Room Escape (Hospitalet de Llobregat, Spain) (6)
The Interview [La Entrevista] - Cubick (Madrid / Mataró / Menorca / Valencia, Spain) (8)
Library Rats [Ratas de Biblioteca] - Action House (Madrid, Spain) (2)
Red Experience [Experiencia Roja] - Experiencity (Madrid, Spain) (1)
Yellow Experience [Experiencia Amarilla] - Experiencity (Madrid, Spain) (10)
Operation Steampunk [Operación Steampunk] - Incognito Escape Game (Madrid, Spain) (4)
Quintana Mine / The Mine Diavik [Mina de Quintana / La mina Diavik] - Mina Madrid / Unreal Room Escape (Madrid, Spain) (5)
Until Dawn - La Clau (Manresa, Spain) (8)
The Kidnapping [El Secuestro] - Cubick (Mataró, Spain) (1)
Roomanji - Ilusium (Mataró, Spain) (14)
The Hour of the Beasts [La hora de las Bestias] - Katharsis (Mataró, Spain) (3)
The Trap [La trampa] - Escape Play (Murcia, Spain) (1)
Cursed Expedition [Expedición Maldita] - Mythos Escape Room (Murcia, Spain) (3)
Real Estate [La Inmobiliaria] - Insidious (Nalda, Spain) (5)
The Fate of the Kingdom [El destino del reino] - Olite Escape Room (Olite, Spain) (1)
Heirloom - Exitus (Palafolls, Spain) (8)
101 Years of Forgiveness [Over Time: 101 Años de Perdón] - Over Time (Mad Mansion) (Pamplona, Spain) (7)
Call or Die - Over Time (Mad Mansion) (Pamplona, Spain) (15)
Hotel Hello - Way Out (Spain) (Pamplona, Spain) (13)
Below Zero [Bajo Zero] - Escapem (Sabadell, Spain) (3)
Alien: The Origin [Alien: El origen] - Escape Barcelona (Santa Coloma de Gramenet, Spain) (17)
Tomb Hunter: Akasha's Legend [Tomb Hunter: La leyenda de Akasha] - Escape Barcelona (Santa Coloma de Gramenet, Spain) (27)
The Railway Station [La estación del ferrocarril] - Xkapa (Santander, Spain) (3)
The Temple of Chaak [El templo de Chaak] - The Legend Escape Room (Mad Mansion) (Santurtzi, Spain) (4)
Operation: Code Red [Operación: Código rojo] - Unreal Room Escape (Terrassa, Spain) (1)
Apophis - Vortex Escape (Terrassa, Spain) (6)
The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Toledo, Spain) (12)
Gulliver and the Giants [Gulliver y los gigantes] - Claustrophobia (Valencia, Spain) (1)
Philosopher's Stone [La piedra filosofal] - Claustrophobia (Valencia, Spain) (1)
MegaChef - Clue Hunter (Valencia, Spain) (1)
NASA: Omega Mission [NASA: Misión Omega] - Myst3ry Rooms (Valencia, Spain) (1)
The Dark Years [Los Años Oscuros] - The X-Door (Valencia, Spain) (1)
The Innkeeper's Son [El hijo del posadero] - DragonBorn Escape Room (Mad Mansion) (Vitoria, Spain) (17)
Castaway [Náufrago] - Password Room Escape (Vitoria, Spain) (11)
Indiana's Adventure - Hollywood Escape Zaragoza (Zaragoza, Spain) (1)
Ritual - Locked ZGZ Escape Room (Zaragoza, Spain) (2)
The Tenants - Sherlocked Sweden (Malmo, Sweden) (1)
The Cell - Exit Games Stockholm (Stockholm, Sweden) (1)
The Forbidden City 1901 [Die verbotene Stadt 1901] - Time Maze (Baden, Switzerland) (4)
The Heist 1847 [Beutezug 1847] - Time Maze (Baden, Switzerland) (1)
The Dream [Der Traum] - One Hour Escape (Switzerland) (Basel, Switzerland) (1)
Dragon's Castle [Burg Drachenfels] - Room Escape Basel (Basel, Switzerland) (2)
Operation: Delta Starfire - Room Escape Basel (Basel, Switzerland) (1)
Jurassic Jones - Trapgame (Charrat, Switzerland) (2)
The Pirates of the Blacktrap [Les Pirates du Blacktrap] - Trapgame (Charrat, Switzerland) (3)
An Evening with the Voodoo Queen [Une soirée avec la Reine Vaudou] - Trip Trap (Geneva, Switzerland) (4)
Aunt Hilda's Room [La Chambre de Tante Hilda] - Trip Trap (Geneva, Switzerland) (14)
Mr. Trippolyte's Vestibule [Le Vestibule de M. Trippolyte] - Trip Trap (Geneva, Switzerland) (2)
Executioner [Le Bourreau] - Evade (Lausanne, Switzerland) (2)
Bermuda Triangle: The Corsair's Treasure [Triangle des Bermudes: Le trésor du corsaire] - Escape World Switzerland (Morges, Switzerland) (1)
Lost City of Atlantis [Die verlorene Stadt Atlantis] - ExitAdventure (Rapperswil, Switzerland) (1)
Steampunk - AdventureRooms (Solothurn, Switzerland) (2)
The Legend of the Ring - AdventureRooms (Solothurn, Switzerland) (1)
Kontinuum - AdventureRooms (Winterthur, Switzerland) (8)
Spektrum - AdventureRooms (Winterthur, Switzerland) (4)
The Ticking Heart (Part 1) [The Ticking Heart (Tiel 1)] - Inside Breakout (Zug, Switzerland) (3)
Da Vinci Code - ROOM Escape Room (Zürich, Switzerland) (2)
House of Ghosts [Das Geisterhaus] - ROOM Escape Room (Zürich, Switzerland) (1)
In Search of Gulliver [Auf der Suche nach Gulliver] - ROOM Escape Room (Zürich, Switzerland) (2)
Gingerbread House [Пряниковий будиночок] - Vykhod (Odessa, Ukraine) (1)
Our Finest Hour - Escape Hunt (Basingstoke / Birmingham / Bristol / Leeds / Norwich, UK) (1)
The Hellevator - Clue HQ (Birmingham, UK) (1)
Double Cross - Escape Live (Birmingham, UK) (1)
Dormant - Housetrap Escape Rooms (Bodmin, UK) (1)
M.A.R.V.O. Induction - Marvo Mysteries (Bournemouth, UK) (2)
Operation Clearsafe - Project Breakout (Brighouse, UK) (1)
Broken - Pier Pressure / Pressure Point Escape Rooms (Brighton / Ashford, UK) (1)
Judgement D.A.V.E. - Bewilder Box (Brighton, UK) (2)
Loot the Lanes - Pier Pressure (Brighton, UK) (3)
Nautilus - Riddlr (Bristol, UK) (1)
Séance - Riddlr (Bristol, UK) (2)
UI-55 - Compendium (Bury, UK) (1)
Heaven and Hell - Cambridge Escape Rooms (Cambridge, UK) (1)
The Comms Room - Escape in the Towers (Canterbury, UK) (7)
Victoria's Last Challenge - 11th Hour Escape Rooms (Chippenham, UK) (2)
Questionable Ethics - Hounds Escape Game Experiences (Crawley, UK) (2)
Dodge City - Tulleys Escape Rooms (Crawley, UK) (5)
Mutiny - Tulleys Escape Rooms (Crawley, UK) (3)
Nethercott Manor - Tulleys Escape Rooms (Crawley, UK) (5)
Spellbound - Make Your Escape (Derby, UK) (1)
Mary - Unescapeable (Derby, UK) (1)
The Lost Tomb - Extremescape (Disley, UK) (1)
Viking - Extremescape (Disley, UK) (5)
Director's Cut - Get Lost (Dover, UK) (1)
The Krevokar Programme - Get Lost (Dover, UK) (1)
The Cutting Room - Locked in Edinburgh (Edinburgh, UK) (4)
The Secret Lab - Locked in Edinburgh (Edinburgh, UK) (3)
Christmas Dream - Locked In Glasgow (Glasgow, UK) (1)
Glasgow School of Magic - Locked In Glasgow (Glasgow, UK) (2)
The Surgery - Locked In Glasgow (Glasgow, UK) (2)
Wizard of Oz - The Panic Room (Gravesend, UK) (1)
Loop - The Panic Room / Clockwork Dog (Gravesend, UK) (2)
Venus - Paradox Parlours (Guildford, UK) (2)
Crux Codicillus - The Escaporium (Halifax, UK) (1)
Chronos - Escapologic (Leicester, UK) (1)
The Gateway - Escapologic (Leicester, UK) (2)
Dark Magik - Access Escape (London, UK) (1)
MAD - Archimedes Inspiration (London, UK) (1)
Project Ðelta - Archimedes Inspiration (London, UK) (10)
The Million Pound Heist - Enigma Quests (London, UK) (1)
Roll Out the Barrel - Escape Plan (London, UK) (1)
The Battle for Britain - Escape Plan (London, UK) (6)
Secret Studio - Escape in Time (London, UK) (2)
Poppa Plock's Wonky Workshop - Handmade Mysteries (London, UK) (4)
Sherlock: The Game is Now - Hartswood Films / Time Run (London, UK) (1)
The Lost Passenger - Mission: Breakout (London, UK) (2)
The Escapist - Modern Fables (London, UK) (1)
The Crystal Maze - The Crystal Maze (London, UK) (4)
Revenge of the Sheep - clueQuest (London, UK) (4)
cQ ORIGENES - clueQuest (London, UK) (19)
The Enchanted Forest - Break Escape (Loughborough, UK) (1)
Henry Fortune's House of Illusion - Escape Quest (Macclesfield, UK) (4)
The 13th Element - Escape Quest (Macclesfield, UK) (1)
Inbound - Escape Hub (Maidstone, UK) (1)
The Curse of Curawood's Garden - Escape Hub (Maidstone, UK) (1)
Most Wanted - Breakout Manchester (Manchester, UK) (2)
The Prison - Lucardo (Manchester, UK) (2)
Detention - Ctrl Alt Esc (Margate, UK) (3)
Spacescape - Ctrl Alt Esc (Margate, UK) (1)
Pirates of Polaris - The Escapement (Margate, UK) (3)
The Pit - The Escapement (Margate, UK) (8)
Wild Wild West - ExCLUEsive Games (Newbury, UK) (1)
Fiorella's Cave - Exit Newcastle (Newcastle, UK) (2)
ElectriCity - The Escape Key Newcastle (Newcastle upon Tyne, UK) (1)
Carfax - Cave Escape (Nottingham, UK) (2)
Monuments - Cave Escape (Nottingham, UK) (2)
Daylight Robbery - Cryptology (Nottingham, UK) (5)
Dreamscape - Cryptology (Nottingham, UK) (2)
Butcher - Escapologic (Nottingham, UK) (1)
Curio - Escapologic (Nottingham, UK) (8)
Howitz - Escapologic (Nottingham, UK) (2)
Immaterium - Escapologic (Nottingham, UK) (2)
Robin of Lockskey - Escapologic (Nottingham, UK) (2)
Madame Curio's Cirque Delirium - Trapp'd (Peterborough, UK) (2)
Pub - Other World Escapes (Portsmouth, UK) (1)
Feline Fiasco - Real Life Games (Ramsgate, UK) (1)
University of Magic: Dragon's Heart - Lucardo (Rawtenstall, UK) (3)
The Time Machine - Deadlocked Escape Rooms (Reading, UK) (4)
Age of Magic - Escape Reading (Reading, UK) (3)
The Ram Raid - Escape Reading (Reading, UK) (2)
9-to-5 Assassin - Knockout Escape Rooms (Reading, UK) (1)
Pudding Lane 1666 - TimeTrap Escape Rooms (Reading, UK) (5)
The Guardian of the Gallery - Want to Escape (Rushden, UK) (2)
Escape the R.M.S. Titanic - Houdini's Escape Room Experience (Southampton, UK) (3)
Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (Southampton, UK) (3)
Professor Dunstan and the Search for the Ancient Statuette - Co-Decode (Swindon, UK) (2)
Sub Terra - Co-Decode (Swindon, UK) (4)
The Diamond Dogs - Clue Cracker (Tunbridge Wells, UK) (2)
Casino Heist - Lakes Escapes (Workington, UK) (1)
Escape the Hydeout - Mission Escape Games (Anaheim, CA / West Hartford, CT / New York City, NY / Philadelphia, PA, USA) (1)
Saint Angelo's Castle - Konmata Quest (Boston, MA / New York City, NY / San Antonio, TX, USA) (1)
The Clock Tower - Escape The Room (Chandler, AZ / Glendale, CA / Chicago, IL / Boston, MA / St. Louis, MO / New York City, NY / Fort Worth, TX / Houston, TX, USA) (3)
The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (Chicago, IL / Denver, CO, USA) (3)
The Reel - Puzzle Effect (Clovis, CA / San Luis Obispo, CA / Denver, CO, USA) (1)
Drago's Castle - 5 Wits (Foxboro, MA / Albany, NY / Buffalo, NY / West Nyack, NY / Syracuse, NY / Plymouth Meeting, PA / Arlington, VA, USA) (2)
Cartman's Escape Room - Escape The Room (Glendale, CA / Denver, CO / Chicago, IL / Boston, MA / New York City, NY / Dallas, TX, USA) (1)
Gold Rush - The Escape Game (Irvine, CA / San Francisco, CA / Jacksonville, FL / Orlando, FL / Atlanta, GA / Chicago, IL / Cincinnati, OH / Minneapolis, MN / Las Vegas, NV / New York City, NY / King of Prussia, PA / Nashville, TN / Pigeon Forge, TN / Austin, TX / Dallas, TX / Houston, TX, USA) (2)
Prison Break - The Escape Game (Irvine, CA / San Francisco, CA / Jacksonville, FL / Orlando, FL / Atlanta, GA / Chicago, IL / New Orleans, LA / Minneapolis, MN / Las Vegas, NV / New York City, NY / Cincinnati, OH / King of Prussia, PA / Nashville, TN / Pigeon Forge, TN / Austin, TX / Dallas, TX / Houston, TX, USA) (4)
Special Ops: Mysterious Market - The Escape Game (Irvine, CA / San Francisco, CA / Jacksonville, FL / Orlando, FL / Atlanta, GA / Chicago, IL / New Orleans, LA / Minneapolis, MN / New York City, NY / Cincinnati, OH / Nashville, TN / Houston, TX, USA) (7)
Playground - The Escape Game (Irvine, CA / San Francisco, CA / Jacksonville, FL / Orlando, FL / Atlanta, GA / New Orleans, LA / Las Vegas, NV / New York City, NY / King of Prussia, PA / Nashville, TN / Austin, TX / Dallas, TX / Houston, TX, USA) (15)
Scooby-Doo and the Spooky Castle Adventure - Escapology (London, ON, Canada / Trumbull, CT / Orlando, FL / Orland Park, IL / Portage, MI / St. Peters, MO / Fayetteville, NC / Garwood, NJ / Mentor, OH / Columbia, SC / Myrtle Beach, SC, USA) (1)
Mission: Mars - The Escape Game (Orlando, FL / Chicago, IL / Minneapolis, MN / Nashville, TN / Pigeon Forge, TN, USA) (1)
Jurassic Escape - Escape The Room (Scottsdale, AZ / Glendale, CA / Littleton, CO / Washington, DC /Chicago, IL / Albuquerque, NM / New York City, NY / Fort Worth, TX / Houston, TX, USA) (1)
The Basement - The Basement (Sylmar, CA / Kansas City, MO / Las Vegas, NV, USA) (1)
The Study - The Basement (Sylmar, CA / Kansas City, MO / Las Vegas, NV, USA) (4)
The Bionic Dilemma - A Narrow Escape (Hot Springs, AR, USA) (1)
Escape from Alcatraz - North Valley Escape Room (Anthem, AZ, USA) (1)
Amazon Rainforest - International Room Escape (Gilbert, AZ, USA) (1)
Return of the Pharaohs - Paragon Escape (Mesa, AZ, USA) (1)
The Inheritance - The Zone Escape Rooms (Tempe, AZ, USA) (1)
The Fun House - Cross Roads Escape Games (Anaheim, CA, USA) (1)
The Hex Room - Cross Roads Escape Games (Anaheim, CA, USA) (5)
The Psych Ward - Cross Roads Escape Games (Anaheim, CA, USA) (3)
Escape the Darkest Hour: Torture Chamber - Mission Escape Games (Anaheim, CA, USA) (2)
Mission's Breakout: The Ultimate Bank Heist - Mission Escape Games (Anaheim, CA, USA) (1)
Time Machine - Not Another Escape Room (Brea, CA, USA) (1)
The Dragon's Lair - Maze Rooms (Culver City, CA, USA) (1)
They're Coming - Maze Rooms (Culver City, CA, USA) (1)
Ghost Patrol - Trivium Games (Emeryville, CA, USA) (5)
The King’s Keep - Next-Gen Escape (Fresno, CA, USA) (1)
Zoe - Escapade Games (Fullerton, CA, USA) (6)
The Curse of the Black Knight - EscapeX (Irvine, CA, USA) (1)
Irvine School of Wizardry and the Dragon Wand - Hidden Donkey (Irvine, CA, USA) (1)
Pirate Adventure - Limitless Escape Games (Livermore / Stockton, CA, USA) (1)
Sherlock Holmes - Limitless Escape Games (Livermore / Stockton, CA, USA) (1)
Amityville - 60out Escape Rooms (Los Angeles, CA, USA) (1)
Hyde Circus - 60out Escape Rooms (Los Angeles, CA, USA) (2)
Miss Jezebel - 60out Escape Rooms (Los Angeles, CA, USA) (1)
Turing Test - 60out Escape Rooms (Los Angeles, CA, USA) (2)
Cursed Crypt - Escape Hotel Hollywood (Los Angeles, CA, USA) (1)
Atlantis - Escape Room L.A. (Los Angeles, CA, USA) (1)
Lab Rat - Hatch Escapes (Los Angeles, CA, USA) (22)
Magic Kingdom - Maze Rooms (Los Angeles, CA, USA) (4)
Pharaoh's Tomb - Maze Rooms (Los Angeles, CA, USA) (1)
Sky Odyssey - Maze Rooms (Los Angeles, CA, USA) (1)
The Abyss - Maze Rooms (Los Angeles, CA, USA) (1)
World of Illusions - Maze Rooms (Los Angeles, CA, USA) (1)
Da Vinci's Challenge - Quest Room (Los Angeles, CA, USA) (1)
Perfumer - Quest Room (Los Angeles, CA, USA) (1)
Red Giant - Quest Room (Los Angeles, CA, USA) (4)
Stash House - Stash House (Los Angeles, CA, USA) (18)
The Laboratory - The Laboratory (Los Angeles, CA, USA) (1)
The AI - Exit Game (California) (Monterey Park / San Diego, CA, USA) (1)
An Hour To Kill - Exit Game (California) (Monterey Park, CA, USA) (1)
Arena - MindTrap Escape Room (California) (Murrieta, CA, USA) (1)
Oz - MindTrap Escape Room (California) (Murrieta, CA, USA) (2)
It's a Doggy Dog World - Level Games / ESCapades LA (North Hollywood, CA, USA) (4)
Chocolate Factory - Boss-Play (Oceanside, CA, USA) (1)
Neutrino 42 - Boss-Play (Oceanside, CA, USA) (1)
The Last Supper - Quest Tavern Escape Room (Pomona, CA, USA) (1)
13th Room Chapter 2: The Silence - The 13th Room (Pomona, CA, USA) (1)
The Secret at Whitmore Estate - Breaking Point Escape Rooms (Rancho Cucamonga, CA, USA) (3)
Amnesia - Quest Room (Redondo Beach, CA, USA) (1)
Sweet Revenge - Quandary Escape Rooms (Roseville, CA, USA) (1)
The Skull Witch - Enchambered (Sacramento, CA, USA) (4)
The Whispering Halls - Enchambered (Sacramento, CA, USA) (3)
The Lost Expedition - Steal and Escape (San Diego, CA, USA) (2)
Sister's Secret - The Unlockables (San Diego, CA, USA) (2)
The Escape - The Unlockables (San Diego, CA, USA) (1)
The Edison Escape Room - Palace Games (San Francisco, CA, USA) (16)
The Great Houdini Escape Room - Palace Games (San Francisco, CA, USA) (7)
The Roosevelt Escape Room - Palace Games (San Francisco, CA, USA) (5)
Joker's Asylum - Omescape (San Jose, CA, USA) (1)
The Ghost of Mentryville - Arcane Escape Rooms (Santa Clarita, CA, USA) (4)
Chaos in the Galleria - Omescape (Sunnyvale, CA, USA) (5)
The Courtyard - The Basement (Sylmar, CA, USA) (4)
The Elevator Shaft - The Basement (Sylmar, CA, USA) (4)
Murder Co - Black Market Escape Rooms (Upland, CA, USA) (5)
Condemned 2: The Box - NorCal Escape Co. (Yuba City, CA, USA) (1)
Experiment C73 - Conundrum Escape Rooms (Arvada, CO, USA) (1)
Tick Tock - Puzzah! (Denver, CO, USA) (1)
Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (Fort Collins, CO, USA) (6)
Escape The Machine - Fort Collins Escape Room (Fort Collins, CO, USA) (1)
Puzzler's Underground Chambers of Time / Puzzler's Underground Chambers of Mystery - Time Emporium / Legendary Adventures Escape Rooms (Fort Collins, CO, USA) (1)
Frost Base Z - Rabbit Hole Recreation Services (Louisville, CO, USA) (2)
Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (Louisville, CO, USA) (6)
Ruins of the Mystic Temple - Rabbit Hole Recreation Services (Louisville, CO, USA) (6)
Movie Mayhem - Codeword Escape (Rocky Hill, CT, USA) (1)
Warehouse 13 - Puzzle Theory (South Windsor, CT, USA) (1)
Time Chasers: Race for the Cure - trap't Escape Room Adventures (Stamford, CT, USA) (3)
Wigwam Escape - Wigwam Escape (Washington, CT, USA) (2)
Servants of Sleight - The Exit Games FL (Clearwater, FL, USA) (2)
Strange Magic - Mind Masters Challenge Chambers (Clermont, FL, USA) (3)
Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (Kissimmee, FL, USA) (10)
Red Sled Redemption at the Holly Jolly Holiday Hubcap Repair - Doldrick's Escape Room (Kissimmee, FL, USA) (2)
Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (Kissimmee, FL, USA) (3)
The Ringmaster - Dare 2 Escape (Orlando, FL, USA) (1)
A Knight to Escape - Escape Effect (Orlando, FL, USA) (4)
Bank Heist - Lockbusters (United States) (Orlando, FL, USA) (1)
Bros for Life: Fraternity Heist - The Escape Ventures (Orlando, FL, USA) (1)
Alleyway Vigilantes - Imagine Escape Rooms (Tampa, FL, USA) (1)
Dreamweaver - Imagine Escape Rooms (Tampa, FL, USA) (1)
Shadows of the Skunk Ape (Part 1) - Rabbit Hole Escape Games (Tampa, FL, USA) (2)
The Quest: Revenge of the Garzon Dragon - Escape Goat (Winter Garden, FL, USA) (2)
Nosferatu - Escape the Netherworld (Stone Mountain, GA, USA) (1)
Sasquatch: Bigfoot's Revenge - Escape the Netherworld (Stone Mountain, GA, USA) (2)
The Temple - Chambers Escape Games (Honolulu, HI, USA) (1)
Bonus Fun Time Game Show Challenge - Escape Factor (Forest Park, IL, USA) (4)
Blast from the Past - 60 to Escape (Gurnee, IL, USA) (1)
Hidden Temple - 60 to Escape (Gurnee, IL, USA) (2)
The Passage - Twisted Limits Escape Rooms (McHenry, IL, USA) (2)
Locked Up Supermax - Mind Trap Escape Rooms (Illinois) (Montgomery, IL, USA) (1)
Storm Surge - Mind Trap Escape Rooms (Illinois) (Montgomery, IL, USA) (1)
The Wizard's Curse - CU Adventures in Time and Space (Urbana, IL, USA) (1)
Tunnels Under London - Edge of Escape (Zion, IL, USA) (1)
A Night at the Castle - The Escape Room Fishers (Fishers, IN, USA) (1)
The Cabin - Twisted Room Escapes (Indianapolis, IN, USA) (1)
Agent 13 - 13th Gate Escape (Baton Rouge, LA, USA) (2)
Cutthroat Cavern - 13th Gate Escape (Baton Rouge, LA, USA) (30)
Spellbound - 13th Gate Escape (Baton Rouge, LA, USA) (2)
The Asylum - 13th Gate Escape (Baton Rouge, LA, USA) (7)
The Collector - 13th Gate Escape (Baton Rouge, LA, USA) (2)
Tomb of Anubis - 13th Gate Escape (Baton Rouge, LA, USA) (14)
Escape Extinction: Sharks - Escape My Room (New Orleans, LA, USA) (2)
Inventor's Attic - Escape My Room (New Orleans, LA, USA) (17)
Smugglers Den - Escape My Room (New Orleans, LA, USA) (4)
Boda Borg - Boda Borg (Boston, MA, USA) (7)
Conundrum Museum - Boxaroo (Boston, MA, USA) (1)
Mystery of the Magician's Study - Boxaroo (Boston, MA, USA) (1)
The Storyteller's Secret - Boxaroo (Boston, MA, USA) (16)
The Heist - Red Fox Escapes (Cambridge, MA, USA) (3)
The U-Boat - Red Fox Escapes (Cambridge, MA, USA) (3)
20,000 Leagues - 5 Wits (Foxboro, MA, USA) (1)
The Assistant - The Gate Escape (Leominster, MA, USA) (1)
The Observatory - The Gate Escape (Leominster, MA, USA) (5)
The Eckstein Experiment - Mass Escape (New Bedford, MA, USA) (2)
The Aurora Society - Decode Ypsilanti (Ypsilanti, MI, USA) (2)
Utopia - Riddle Room (United States) (Minneapolis, MN, USA) (4)
Through the Looking Glass - Big Sky Breakout (Missoula, MT, USA) (1)
Redemption - Key to Escape (Statesville, NC, USA) (1)
Boardwalk Blast - Escape Garden State (Fairfield, NJ, USA) (1)
The Grand Parlor - 13th Hour Escape Rooms (Wharton, NJ, USA) (6)
The Great Room - 13th Hour Escape Rooms (Wharton, NJ, USA) (1)
The Trophy Room - 13th Hour Escape Rooms (Wharton, NJ, USA) (2)
Dr. Guts - AmeriEscape (Las Vegas, NV, USA) (1)
Chapter 2: Playtime - Lost Games (Las Vegas, NV, USA) (3)
The Official Saw Escape - The Official Saw Escape (Las Vegas, NV, USA) (1)
One Eyed Jack - Trapped! (United States) (Las Vegas, NV, USA) (2)
Deep Space - 5 Wits (Albany / Buffalo / Syracuse / West Nyack, NY, USA) (2)
Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (Brooklyn, NY, USA) (4)
Body Collectors - Escape City Buffalo (Buffalo, NY, USA) (1)
Over The Falls - Escape City Buffalo (Buffalo, NY, USA) (4)
The Hangover - Escape City Buffalo (Buffalo, NY, USA) (2)
The Order - I Survived The Room (Long Island City, NY, USA) (1)
High Speed NYC - Exit Escape Room NYC (New York City, NY, USA) (1)
The Real Kitchen Nightmare - Esscape Room (Queens, NY, USA) (1)
Spooky Room 479 - Locked Escape Rooms NYC (Queens, NY, USA) (1)
Battleship - Unreal Escapes (Staten Island, NY, USA) (1)
The Lost Dutchman’s Mine Version 2.0 - The Sanctuary Escape (Oklahoma City, OK, USA) (2)
Cat Lady - Mad Genius Escapes (Portland, OR, USA) (1)
Lucky Dice Diner - Expedition Escape! (King of Prussia, PA, USA) (1)
The Midnighters - Olde City Escape Games (Philadelphia, PA, USA) (1)
The Inventor's Paradox - Enter the Imaginarium (Pittsburgh, PA, USA) (1)
The Mischievous Elves - Ocean State Escape (Johnston, RI, USA) (1)
The Cellar II: Saul's Revenge - Lock & Clue Escape Rooms (Pawtucket, RI, USA) (2)
Blackout - The Final Door (Columbia, SC, USA) (1)
The Vampyr - The Final Door (Columbia, SC, USA) (1)
Escape Area 51 - Elite Escape Games (Mount Pleasant, SC, USA) (1)
The Legend of Atlantis - Backstage Escape Games / Gatlin's Escape Games (Myrtle Beach, SC / Gatlinburg, TN, USA) (1)
Knight Sky - Liveminds Adventure Escape (Franklin, TN, USA) (2)
Treasure of Pacari - Liveminds Adventure Escape (Franklin, TN, USA) (1)
Big Maw Bertha's Fussin' & A' Feudin' Moonshine Hill Hootenanny - Gatlin's Escape Games (Gatlinburg, TN, USA) (1)
Frankenstein: The Awakening - 60 Minute Escape (Murfreesboro, TN, USA) (1)
Pharaoh's Chamber - 60 Minute Escape (Murfreesboro, TN, USA) (1)
Ruins: Forbidden Treasure - The Escape Game (Nashville, TN, USA) (1)
The Poe Adventure - The Secret Chambers (Arlington, TX, USA) (2)
Dead Man's Cove - Escape Hour Austin (Austin, TX, USA) (1)
Lab Rats - Escape Hour Austin (Austin, TX, USA) (1)
The Man from Beyond - Strange Bird Immersive (Houston, TX, USA) (16)
The Mine Trap - Escape Room Park City (Park City, UT, USA) (1)
8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (Herndon, VA, USA) (3)
Magician's Workshop - Escape Room Herndon (Ravenchase Adventures) (Herndon, VA, USA) (1)
Vault of the Volcano God: The Break of Day - Epic Team Adventures (Seattle, WA, USA) (1)
The Storykeeper - Locurio (Seattle, WA, USA) (13)
The Vanishing Act - Locurio (Seattle, WA, USA) (5)
The Eventide Departure - Puzzle Break (Seattle, WA, USA) (1)
Mystery Manor - Escape Room Wisconsin (Green Bay, WI, USA) (1)
221B - The Encrypted Escape (Green Bay, WI, USA) (1)
The Casino - 60 to Escape (Greendale, WI, USA) (1)
Orvellio's: Reconjured - What the Lock? (Manitowoc, WI, USA) (1)
Vlad: The Third Letter - What the Lock? (Manitowoc, WI, USA) (1)
Cyber Station - City 13 (Oak Creek, WI, USA) (1)
Neon Light Diner - City 13 (Oak Creek, WI, USA) (1)
Critter Craters - Seven Keys to Escape (Racine, WI, USA) (1)

Phase 1 Online Room Results

2020 Phase 1 Online Room Results

The following 48 online rooms were nominated by at least one nominator in Phase 1. Each nomination means that someone with 200 or more rooms of experience decided to list that room as one of top 10% of online rooms they have played. The 25 online rooms with three or more nominations moved on to Phase 2 as finalists and are shown in bold. This list should explicitly not be taken to be a meaningful ranking, as the geographic distribution of the participants was not uniform.

Neverland: Heist on the High Seas (Live Video Digital Game) - Improbable Escapes (Kingston, ON, Canada) (4)
Seven Dwarves: Mining Mission (Live Video Digital Game) - Improbable Escapes (Kingston, ON, Canada) (6)
The Witch's Forest - Daydream (Toronto, ON, Canada) (6)
DTF: Drag Task Force - Mystery Mansion Regina (Regina, SK, Canada) (4)
Night Terrors - Mystery Mansion Regina (Regina, SK, Canada) (2)
The Diamond Heist Online [La Casse du Siècle Online] - The Box (France) (Metz, France) (3)
Horror Hotel: Online - Exit Now (Athens, Greece) (6)
YouEscape #2: Elements - YouEscape (Athens, Greece) (1)
The Haunted Hotel Livecam Adventure - Breakout Escape Room Italy (Milan, Italy) (1)
Escape from the Alien Research Facility - SCRAP (Tokyo, Japan) (1)
The Pub: A Puzzle Psychopath's Trap - Can you Escape? Malta (Fgura, Malta) (1)
Cabin in the Woods Live Remote Escape Room - Escape World Netherlands (Amsterdam, Netherlands) (2)
LockedDown: The Submarine in Live 360° Video - Locked Amsterdam (Amsterdam, Netherlands) (1)
The Amsterdam Catacombs Online - Logic Locks (Amsterdam, Netherlands) (9)
The Secrets of Eliza's Heart Online - Logic Locks (Amsterdam, Netherlands) (1)
A World of Magic - Mystery Motel Murcia (Murcia, Spain) (2)
Project Avatar: First Mission - Legendary Quests (Lviv, Ukraine) (19)
The Beast - Emergency Exit (Ashton-under-Lyne, UK) (15)
Virtual Exorcist - Emergency Exit (Ashton-under-Lyne, UK) (15)
Virtual X-Caper - Agent November (London, UK) (11)
Plymouth Point - Swamp Motel (London, UK) (1)
Agent Venture Mission One: The Heist - The Adventure Is Real (London, UK) (8)
Agent Venture Mission Three: B.A.D Side of the Moon - The Adventure Is Real (London, UK) (4)
Agent Venture Mission Two: Cyborg Island - The Adventure Is Real (London, UK) (3)
Miss Jezebel Online - 60out Escape Rooms (Los Angeles, CA, USA) (20)
Operation: X-13 Online - Trapped! (United States) (Los Angeles, CA, USA) (2)
Excalibur - Livestream - MindTrap Escape Room (California) (Murrieta, CA, USA) (3)
The Menagerie (Virtual Game) - Level Games (North Hollywood, CA, USA) (2)
Animal Crossing Escape: The Tea Party - Jason M. Yu (San Jose, CA, USA) (1)
Pursuit of the Assassin Artist - Omescape (San Jose, CA, USA) (33)
Gold Rush - Livestream - MindTrap Escape Room (California) (Temecula, CA, USA) (2)
Condemned 2 Online - NorCal Escape Co. (Yuba City, CA, USA) (3)
Before Moonrise (Play at Home) - Escape New Haven / Escape.Anywhere (New Haven, CT, USA) (3)
Ready Mayor One: Apartment A.I. - Rock Avenue Escape Room (New Port Richey, FL, USA) (2)
Villains - Fuzzy Logic Escape Room (Downers Grove, IL, USA) (6)
Book Smart - Sqounkland (Walkersville, MD, USA) (2)
Hunt for the Crimson Fang - Castle Escapes (Detroit, MI, USA) (2)
Monster Smash - Trapped Puzzle Rooms (St. Paul, MN, USA) (1)
Super Squad - Trapped Puzzle Rooms (St. Paul, MN, USA) (4)
Geno's Getaway - Fox-N-Otter Adventure Escapes (Asheville, NC, USA) (2)
Boonabo Farm - Mad Genius Escapes (Portland, OR, USA) (1)
The Truth About Edith - Mad Genius Escapes (Portland, OR, USA) (12)
The Bunker - "Remote Avatar" Virtual Experience - Escape Experience (Chattanooga, TN, USA) (1)
Lost Pyramid - Live Video Escape Room - Memphis Escape Rooms (Memphis, TN, USA) (1)
Ruins: Forbidden Treasure (Remote Adventure) - The Escape Game (Nashville, TN, USA) (8)
Evil Dead 2: Official Remote Escape - Hourglass Escapes (Seattle, WA, USA) (9)
The Vanishing Act Remote - Locurio (Seattle, WA, USA) (7)
REC: Escape the ‘80s Workout VHS - Virtual Escape Games (Seattle, WA, USA) (2)

Phase 2 Room Results

2020 Phase 2 Room Results

The final room rankings from Phase 2 are shown below. The top 50 rooms have been awarded a TERPECA for Top Room and are shown in bold. Score is the final output of the analysis. Players is the number of players that ranked that room. Coverage is the number of other rooms in the list that were directly compared to that room by at least one player. Comps is the total number of comparisons made between that room and all other rooms by all players. Last Year shows how the room was ranked last year, where "nom" means it was nominated but was not a finalist.

Note that, as described in the Methodology section, while this data is interesting, we do not claim for this to be the authoritative list of the top 279 rooms in the world, as rooms lower on the list would not necessarily have been ranked this high if other rooms with fewer than the required number of nominations had made it to Phase 2.

#
Room
Score
Players
Coverage
Comps
Last
Year
1
The Dome - Escape Room Nederland (Bunschoten, Netherlands)
0.082097
113
256
3792
#1
2
Paradox Project 2: The Bookstore [Paradox Project 2: To Βιβλιοπωλείο] - Paradox Project (Athens, Greece)
0.077285
92
251
3407
#2
3
The Man from Beyond - Strange Bird Immersive (Houston, TX, USA)
0.072594
28
161
1297
#3
4
El Exorcista - No Exit (Athens, Greece)
0.071881
70
244
2498
#10
5
The Sanatorium (Midnight Mode) [Το Σανατόριο (Μεσάνυχτα)] - Lockhill (Athens, Greece)
0.070711
32
205
1156
#24*
6
Aunt Hilda's Room [La Chambre de Tante Hilda] - Trip Trap (Geneva, Switzerland)
0.070701
26
218
1042
#31
7
Cutthroat Cavern - 13th Gate Escape (Baton Rouge, LA, USA)
0.070616
84
164
2383
#4
8
The Innkeeper's Son [El hijo del posadero] - DragonBorn Escape Room (Mad Mansion) (Vitoria, Spain)
0.070327
49
190
2207
#16
9
The House [La Casa] - Insomnia Corporation (Berga, Spain)
0.070064
26
115
1088
10
Going Underground - Crime Runners (Vienna, Austria)
0.069978
31
261
1332
#13
11
The Brewery [La Cerveseria] - Enigmik (Barcelona, Spain)
0.069516
72
200
2789
#33
12
Paradox Project 3: The Music Academy [Paradox Project 3: Το Ωδείον] - Paradox Project (Athens, Greece)
0.069318
50
131
1271
13
The End - DarkPark (Zoetermeer, Netherlands)
0.068651
89
249
3089
#23
14
Ghosthunter Brandon Darkmoor [Geisterjäger Brandon Darkmoor] - The Room (Berlin, Germany)
0.068603
57
234
1832
#11
15
The Edison Escape Room - Palace Games (San Francisco, CA, USA)
0.068501
76
196
2183
#5
16
Interview [Töövestlus] - Affect Laboratories (Tallinn, Estonia)
0.068301
5
133
312
#20
17
The Lost Treasure of Alexander von Humboldt - The Room (Berlin, Germany)
0.068242
95
266
3050
#9
18
An Avalanche of Oblivion [Una avalancha del olvido] - Claustrophobia (Escaldes-Engordany, Andorra)
0.068177
34
166
1559
#26
19
Ghost Hunter Ernie Hudson and the Wailing Woman [Geisterjäger Ernie Hudson und die weinende Frau] - Skurrilum (Hamburg, Germany)
0.068137
77
248
2822
#17
20
The Storyteller's Secret - Boxaroo (Boston, MA, USA)
0.067629
42
172
1384
#14
21
Lab Rat - Hatch Escapes (Los Angeles, CA, USA)
0.067628
87
218
2735
#12
22
The Secret of Saint-Rumoldus [Het geheim van Sint-Rumoldus] - De Gouden Kooi (Mechelen, Belgium)
0.067544
32
183
1027
#27
23
101 Years of Forgiveness [101 Años de Perdón] - Over Time (Mad Mansion) (Pamplona, Spain)
0.067491
47
161
2023
24
Call or Die - Over Time (Mad Mansion) (Pamplona, Spain)
0.066961
48
167
2058
25
Elkano Escape Room [Elkano Ihes Gela] - Experientziak (Getaria, Spain)
0.066948
30
165
1506
26
Insane Paranoid - Quest-Art (Moscow, Russia)
0.066571
4
118
320
#25
27
The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Toledo, Spain)
0.066270
36
166
1711
#142
28
Ghost Patrol - Trivium Games (Emeryville, CA, USA)
0.066142
23
138
936
29
Abduction 3: The Exam - Abduction (Badalona, Spain)
0.065991
99
250
4081
#8
NR
The Sanatorium (Night Mode) [Το Σανατόριο (Νύχτα)] - Lockhill (Athens, Greece)
0.065911
29
150
884
#24*
30
The Amsterdam Catacombs - Logic Locks (Amsterdam, Netherlands)
0.065810
99
257
3640
#19
31
Tomb Hunter: Akasha's Legend [Tomb Hunter: La leyenda de Akasha] - Escape Barcelona (Santa Coloma de Gramenet, Spain)
0.065773
77
233
3235
#6
32
Neptune's Curse [Der Fluch des Neptun] - Hidden Games (Hamburg, Germany)
0.065584
39
219
1591
#22
33
Wake Up - Station 33 (Athens, Greece)
0.065422
50
128
1285
34
Don't Take a Breath - Verone (Acharnes, Greece)
0.065232
40
123
1060
nom
35
Woman in Black - Coven Escape Rooms (Athens, Greece)
0.065091
43
127
1157
36
The Alley [Die Gasse] - Rätselraum Ruhrpott (Bochum, Germany)
0.064709
31
161
856
nom
37
The Storykeeper - Locurio (Seattle, WA, USA)
0.064708
37
172
1159
#15
38
Cursed Expedition [Expedición Maldita] - Mythos Escape Room (Murcia, Spain)
0.064289
6
52
227
39
Haunted House 2: Poltergeist - The Chamber (Prague, Czech Republic)
0.064099
36
241
1336
#39
40
Ghost Hunter Ernie Hudson and the Zoo of Death [Geisterjäger Ernie Hudson und der Zoo des Todes] - Skurrilum (Hamburg, Germany)
0.063999
77
248
2860
#35
41
Stash House - Stash House (Los Angeles, CA, USA)
0.063742
83
179
2490
#30
42
Jungle Quest - Escape Dimension (Perpignan, France)
0.063493
6
82
147
43
Asylum [Obłęd] - Exit19.pl (Wrocław, Poland)
0.063387
38
138
977
#34
44
The Mine [La mina] - Unreal Room Escape (Hospitalet de Llobregat / Irun, Spain)
0.063373
98
249
3970
#18
45
The Intervention [ההתערבות] - Escape Center (Rishon LeZion, Israel)
0.063372
15
95
244
#42
46
The Secret Of Kryptos [Тайната на Криптос] - Myst Entertainment (Sofia, Bulgaria)
0.063258
25
197
1114
#51
47
The Dreamwalkers [Marcheurs de rêves] - Cabinet Mysteriis (Québec City, QC, Canada)
0.063222
19
45
258
48
Kontinuum - AdventureRooms (Winterthur, Switzerland)
0.062979
21
174
861
49
Mystery on Lived Street [Mystère à Lived Street] - Escape Dimension (Perpignan, France)
0.062959
6
82
147
50
GhostHunters [Охотники на привидений] - Claustrophobia (Moscow, Russia)
0.062806
9
160
569
#83
51
Quintana Mine / The Mine Diavik [Mina de Quintana / La mina Diavik] - Mina Madrid / Unreal Room Escape (Madrid, Spain)
0.062740
35
188
1742
52
Dino Rising Red Team [Dino Rising Equipo Rojo Omega] - Dino Rising Experience (Mad Mansion) (Bilbao, Spain)
0.062556
50
194
2272
#59
53
Fairy Tale Regulations [Règlement de Contes] - Pandore & Associés (Paris, France)
0.062543
13
78
273
54
Act II: The Litchver Woodland - Dare Escape Rooms (Athens, Greece)
0.062534
33
126
960
55
Room 237 [Kamer 237] - Kamer 237 (Volkel, Netherlands)
0.062490
86
257
3106
#32
56
Below Zero - Crypto Escape Rooms (Newmarket, ON, Canada)
0.062394
12
102
211
#43
57
Death Row - No Exit (Athens, Greece)
0.062223
41
129
1143
58
The Grand Immersia Hotel [Le Grand Immersia Hotel] - Immersia Escape Games Canada (Boisbriand, QC, Canada)
0.062146
31
128
668
59
Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (Fort Collins, CO, USA)
0.062054
21
154
1031
#38
60
Operation: Metro [Operacja: Metro] - Wyjście Awaryjne (Bydgoszcz, Poland)
0.061997
16
31
303
61
Atlantis [Атлантида] - Teorema Escape Rooms (Sofia, Bulgaria)
0.061930
36
207
1352
#58
62
The Pirates of the Blacktrap [Les Pirates du Blacktrap] - Trapgame (Charrat, Switzerland)
0.061852
12
166
718
#63
63
Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (Kissimmee, FL, USA)
0.061800
39
140
903
#60
64
Einstein's Letter [La Lettre d’Einstein] - Le Passage (Bordeaux, France)
0.061777
18
154
727
#45
65
In the Shadow of the Pyramids [W cieniu piramid] - Wyjście Awaryjne (Bydgoszcz / Warsaw, Poland)
0.061744
49
153
1186
#56
66
Requiem - Mysterylab (Athens, Greece)
0.061696
78
243
2676
#61
67
Location [Lokalizacja] - TickTack (Gliwice, Poland)
0.061677
29
40
521
#72
68
Cube [קיוב] - The Maze (Petah Tikva, Israel)
0.061565
14
95
240
#78
69
Whitechapel: La historia de Charlotte - Whitechapel (Barcelona, Spain)
0.061551
60
163
2134
70
The Slaughterhouse [L'Abattoir] - One Hour (France) (Paris, France)
0.061537
30
212
960
#44
71
The Diamond of Souls [El diamante de almas] - Inmortal Room (Barcelona, Spain)
0.061514
73
234
3301
#37
72
The Yellow Sign [Żółty Znak] - Action Escape (Poznań, Poland)
0.061285
18
32
343
73
The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (Chicago, IL / Denver, CO, USA)
0.061030
24
151
994
#28
74
The Vikings [הויקינגים] - Escape Sign (Petah Tikva, Israel)
0.060990
13
60
217
75
The Grand Parlor - 13th Hour Escape Rooms (Wharton, NJ, USA)
0.060963
13
123
457
#76
76
The Ghost of Mentryville - Arcane Escape Rooms (Santa Clarita, CA, USA)
0.060927
16
141
895
#55
77
Tomb of Anubis - 13th Gate Escape (Baton Rouge, LA, USA)
0.060727
81
164
2340
#50
78
Until Dawn - La Clau (Manresa, Spain)
0.060612
52
192
2275
#54
79
The Observatory - The Gate Escape (Leominster, MA, USA)
0.060577
25
156
951
#41
80
Chaos in the Galleria - Omescape (Sunnyvale, CA, USA)
0.060556
26
154
852
#62
81
Alien: The Origin [Alien: El origen] - Escape Barcelona (Santa Coloma de Gramenet, Spain)
0.060492
87
245
3699
#47
82
Entrenched [Atrincherados] - Conecta Escape / Experiencity (Cerdanyola del Valles / Madrid, Spain)
0.060442
74
226
2903
#48
83
The Lost Island of the Voodoo Queen [L'Île perdue de la Reine Vaudou] - Escaparium (Laval, QC, Canada)
0.060406
20
121
504
84
The Sting [העוקץ] - The Maze (Petah Tikva, Israel)
0.060395
13
59
190
#80
85
Real Estate [La Inmobiliaria] - Insidious (Nalda, Spain)
0.060327
24
118
1043
86
Explosives Specialist [Artificiero] - Open Mind Room Escape (Barcelona, Spain)
0.060169
45
162
1846
87
Catch Me If You Can - Next Level (Eindhoven, Netherlands)
0.060077
79
257
3053
#57
88
The Night of the Wolf and the Serpent [La Nuit du Loup et du Serpent] - Codex Escape Games (Laval, QC, Canada)
0.059970
38
163
791
nom
89
Hollywood 117 [הוליווד 117] - Hype Esc (Tel Aviv, Israel)
0.059840
9
55
161
90
The Reflection of Madness [Le Reflet de la Folie] - Codex Escape Games (Laval, QC, Canada)
0.059817
29
145
693
91
Bella Ciao - Escape Game Katwijk (Katwijk, Netherlands)
0.059806
55
183
1199
92
Prophecy [הנבואה] - My Real Quest (Nesher, Israel)
0.059805
10
59
197
nom
93
The Live Thriller - Borderlive Concepts (Paris, France)
0.059607
22
117
486
94
Wrath of Poseidon [La Colère de Poséidon] - Sauve Qui Peut (Saint-Jean-sur-Richelieu, QC, Canada)
0.059602
26
111
568
95
Dino Rising Blue Team [Dino Rising Equipo Azul Corp] - Dino Rising Experience (Mad Mansion) (Bilbao, Spain)
0.059449
44
193
2077
#96
96
Panzerknacker - The Art of Stealing [Panzerknacker - Die Kunst des Stehlens] - Limbus Escape Center (Krefeld, Germany)
0.059252
18
131
513
97
The Doctor's Cocktail [El Cóctel del Doctor] - Insomnia Corporation (Berga, Spain)
0.059239
52
166
1952
#97
98
Pirates' Robbers [שודדי הפיראטים] - Escape Life / Exit Room Israel (Ashdod, Israel)
0.059234
14
84
232
#95
99
Superheroom - Mr Lock (Bydgoszcz, Poland)
0.059215
32
54
610
#99
100
The Roosevelt Escape Room - Palace Games (San Francisco, CA, USA)
0.059123
65
189
1904
#77
101
Yucatan: The Last Temple [Yucatán: El último Templo] - Coco Room (Alicante / Compostela / Zaragoza, Spain)
0.059070
45
166
1926
#52
102
Galactic Pioneers - MindMaze (Prague, Czech Republic)
0.058951
37
248
1078
#46
103
Paradox Project: The Mansion [Paradox Project: Η Έπαυλη] - Paradox Project (Athens, Greece)
0.058856
106
252
3611
#70
104
Heirloom - Exitus (Palafolls, Spain)
0.058835
54
190
2292
#94
105
The Asylum - 13th Gate Escape (Baton Rouge, LA, USA)
0.058817
31
94
626
#91
106
The Temple of Chaak [El templo de Chaak] - The Legend Escape Room (Mad Mansion) (Santurtzi, Spain)
0.058815
51
198
2309
#74
NR
The Sanatorium (Day Mode) [Το Σανατόριο (Μέρα)] - Lockhill (Athens, Greece)
0.058806
28
183
1126
#24*
107
Yellow Experience [Experiencia Amarilla] - Experiencity (Madrid, Spain)
0.058723
40
189
2004
108
Hotel Hello - Way Out (Spain) (Pamplona, Spain)
0.058718
53
178
2187
#49
109
Loot the Lanes - Pier Pressure (Brighton, UK)
0.058717
24
136
816
#67
110
BlueLab - Endorphin Games (Sofia, Bulgaria)
0.058634
32
206
1341
#79
111
The Creepy Store and the Lost Souls - Escapepolis (Athens, Greece)
0.058610
37
126
991
112
Cosmos 05: Death in Space - Escapepolis (Athens, Greece)
0.058385
80
248
3176
#66
113
Roomanji - Ilusium (Mataró, Spain)
0.058372
83
238
3536
#36
114
King Arthur's Dungeons [Lochy Króla Artura] - Exit19.pl (Wrocław, Poland)
0.058346
36
134
936
nom
115
An Evening with the Voodoo Queen [Une soirée avec la Reine Vaudou] - Trip Trap (Geneva, Switzerland)
0.058272
23
173
958
#89
116
Race against Time [Lenktynės su laiku] - Insight Out (Vilnius, Lithuania)
0.058086
3
24
41
117
Inventor's Attic - Escape My Room (New Orleans, LA, USA)
0.058052
82
163
2351
#82
118
The Execution - The Escape Room Rijswijk (Rijswijk, Netherlands)
0.057984
54
198
1263
nom
119
Haunted House - The Chamber (Prague, Czech Republic)
0.057904
41
250
1644
#115
120
Daylight Robbery - Cryptology (Nottingham, UK)
0.057763
17
127
616
121
The Railway Station [La estación del ferrocarril] - Xkapa (Santander, Spain)
0.057632
43
189
2081
122
The Narcos - Unreal Room Escape (Hospitalet de Llobregat, Spain)
0.057566
74
240
3200
#65
123
The Lab: Lockdown - Revo Escape (Toronto, ON, Canada)
0.057532
9
76
184
#123
124
Cursed Island [Przeklęta wyspa] - Escape Project (Warsaw, Poland)
0.057525
36
95
705
#101
125
cQ ORIGENES - clueQuest (London, UK)
0.057337
74
224
2658
#87
126
Apophis - Vortex Escape (Terrassa, Spain)
0.057239
68
192
2751
#64
127
Circus of the Lost Souls [Le Cirque des Âmes Perdues] - Immersia Escape Games Canada (Boisbriand, QC, Canada)
0.057046
26
130
645
128
Catalepsy [Catalepsia] - Horror Box (Barcelona, Spain)
0.056998
67
227
2991
#104
129
SawRoom: The Revenge - SawRoom (Sofia, Bulgaria)
0.056894
23
191
931
#124
130
The Secret Elixir [Das geheime Elixier] - Hidden Games (Braunschweig, Germany)
0.056876
14
129
409
131
The Orphanage - DarkPark (Zoetermeer, Netherlands)
0.056872
76
253
2669
#153
132
Spektrum - AdventureRooms (Winterthur, Switzerland)
0.056864
21
174
861
133
The Hex Room - Cross Roads Escape Games (Anaheim, CA, USA)
0.056790
58
168
1899
#108
134
Moriarty Ltd [Moriarty sp. z o.o.] - Quest Cage (Katowice, Poland)
0.056685
34
43
611
#100
135
The Poltergeist [Der Poltergeist] - The Code Agency (Düsseldorf, Germany)
0.056677
25
89
424
136
Utopia - Riddle Room (United States) (Minneapolis, MN, USA)
0.056620
11
119
434
#102
137
Freakshow - Break The Brain (Bydgoszcz, Poland)
0.056619
32
76
622
#114
138
The Vanishing Act - Locurio (Seattle, WA, USA)
0.056537
50
169
1640
#84
139
A Knight to Escape - Escape Effect (Orlando, FL, USA)
0.056523
13
102
278
140
8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (Herndon, VA, USA)
0.056512
11
111
334
#126
141
Catacombs [Catacumbas] - Golden Pop (Barcelona, Spain)
0.056380
84
245
3697
#110
142
Nethercott Manor - Tulleys Escape Rooms (Crawley, UK)
0.056352
41
202
1745
#81
143
The Forbidden City 1901 [Die verbotene Stadt 1901] - Time Maze (Baden, Switzerland)
0.056290
16
153
632
144
Revolt at Lock Academy [Révolte à la Lock] - Lock Academy (Paris, France)
0.056233
40
237
1481
#92
145
Abduction 4: Enterprises - Abduction (Badalona, Spain)
0.056064
77
241
3299
#133
146
The Courtyard - The Basement (Sylmar, CA, USA)
0.056051
42
209
1779
#130
147
Zoe - Escapade Games (Fullerton, CA, USA)
0.055873
43
167
1678
#134
148
The Great Houdini Escape Room - Palace Games (San Francisco, CA, USA)
0.055861
71
165
2109
#137
149
The Emperor's Masterchef is Dead - Mister.E (Athens, Greece)
0.055810
28
189
805
150
Time Chasers: Race for the Cure - trap't Escape Room Adventures (Stamford, CT, USA)
0.055716
17
124
488
#117
151
Room 201: Immortal - Escaped (Athens, Greece)
0.055544
53
137
1335
152
Escape the Car - Killer - Lockbusters (Greece) (Athens, Greece)
0.055533
43
201
1332
153
Strange Magic - Mind Masters Challenge Chambers (Clermont, FL, USA)
0.055497
8
111
344
nom
154
Viking - Extremescape (Disley, UK)
0.055462
20
183
913
#71
155
Salutem Medicina Institute [L'Institut Salutem Medicina] - Immersia Escape Games Canada (Boisbriand, QC, Canada)
0.055371
13
44
189
156
The Wizard Four and the Book of Black Arts [Les Quatre Sorciers et le Grimoire de l'Art Obscur] - Escaparium (Montreal, QC, Canada)
0.055309
38
141
754
#107
157
Over The Falls - Escape City Buffalo (Buffalo, NY, USA)
0.055141
16
136
497
#150
158
The Honeymoon Hotel - DarkPark (Zoetermeer, Netherlands)
0.055113
93
255
3322
#157
159
Escape the R.M.S. Titanic - Houdini's Escape Room Experience (Southampton, UK)
0.055097
27
187
746
nom
160
Playground - The Escape Game (Irvine, CA / San Francisco, CA / Jacksonville, FL / Orlando, FL / Atlanta, GA / New Orleans, LA / Las Vegas, NV / New York City, NY / King of Prussia, PA / Nashville, TN / Austin, TX / Dallas, TX / Houston, TX, USA)
0.054964
106
178
2537
#131
161
Curio - Escapologic (Nottingham, UK)
0.054752
55
191
1793
#136
162
Cabinet of Curiosities [Gabinet Osobliwości] - Dom Tajemnic (Częstochowa, Poland)
0.054567
15
35
327
163
Nautilus: The Underwater Adventure [Nautilus: Podmorska Przygoda] - Wyjście Awaryjne (Bydgoszcz / Warsaw, Poland)
0.054566
51
168
1305
#98
164
Bonus Fun Time Game Show Challenge - Escape Factor (Forest Park, IL, USA)
0.054550
16
139
777
#129
165
Castaway [Náufrago] - Password Room Escape (Vitoria, Spain)
0.054506
44
185
2081
#106
166
Escape from Wonderland - Escape from Wonderland (Leiden, Netherlands)
0.054442
50
223
1521
nom
167
The Secret at Whitmore Estate - Breaking Point Escape Rooms (Rancho Cucamonga, CA, USA)
0.054317
29
138
1152
168
The Search for the Scepter of Light [Die Suche nach dem Zepter des Lichts] - The Code Agency (Düsseldorf, Germany)
0.054292
29
132
640
169
Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (Southampton, UK)
0.054149
18
69
321
170
Pudding Lane 1666 - TimeTrap Escape Rooms (Reading, UK)
0.054106
30
191
1040
171
The Legend of the Sword [Legenda Miecza] - Wyjście Awaryjne (Bydgoszcz / Warsaw, Poland)
0.053926
51
177
1285
#122
172
La Pièce Odyssey [L'Odyssée de la Pièce] - La Pièce (Paris, France)
0.053864
33
210
1222
#147
173
The Plane [L'Avion] - The Game (France) (Paris, France)
0.053853
32
223
1108
#132
174
Murder Co - Black Market Escape Rooms (Upland, CA, USA)
0.053850
23
152
1131
#143
175
Queen of the Vampires [Królowa Wampirów] - Dom Tajemnic (Częstochowa, Poland)
0.053849
14
35
307
176
Geldrausch - 66 Minuten (Neuwied, Germany)
0.053717
18
128
393
177
Experimentum X - Trapped (Greece) (Athens, Greece)
0.053705
52
135
1308
178
The Whispering Halls - Enchambered (Sacramento, CA, USA)
0.053698
38
159
1486
#146
179
The Order Of Light - Brain Cells (Athens, Greece)
0.053665
53
123
1241
nom
180
Midnight Killer MK II - Piwnica Quest (Wrocław, Poland)
0.053640
32
200
896
#120
181
Frankenstein's Girlfriend [La novia de Frankenstein] - Yurmuvi (Gijón, Spain)
0.053624
25
164
1217
#86
182
Celestia - L'Atelier des Énigmes (Annecy, France)
0.053615
13
84
283
nom
183
The Vault - Sherlocked Netherlands (Amsterdam, Netherlands)
0.053580
102
258
3508
#162
184
Gates of Time - Tortuga [Wrota Czasu - Tortuga] - TickTack (Gliwice, Poland)
0.053531
30
43
547
185
The Mystery of Nile's Emperor [Tajemnica Władcy Nilu] - Wyjście Awaryjne (Bydgoszcz, Poland)
0.053514
26
54
516
186
Betrayal in Breslau [Zdrada w Breslau] - Exit19.pl (Wrocław, Poland)
0.053464
39
135
979
#113
187
Room 107: Otherside - Escaped (Athens, Greece)
0.053440
72
226
2596
#156
188
The White House, Secrets of the Culper Ring - Escape Rush (Brussels, Belgium)
0.053394
10
170
597
189
In the Footsteps of the Guardians [Sur les traces des gardiens] - Projet Dédale (Toulouse, France)
0.053333
14
82
271
190
Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (Kissimmee, FL, USA)
0.053213
34
151
815
nom
191
City Tunnels [Tunele pod miastem] - Quest Cage (Katowice, Poland)
0.053110
23
34
444
192
The Dark Side of Elements - Exit Plan (Athens, Greece)
0.053093
51
125
1264
193
The Elevator Shaft - The Basement (Sylmar, CA, USA)
0.053012
47
209
1864
#165
194
The Legend of the Three Dragons [La Légende des Trois Dragons] - Escaparium (Sherbrooke, QC, Canada)
0.052955
15
79
300
195
Project Ðelta - Archimedes Inspiration (London, UK)
0.052908
60
227
2314
#135
196
The Girl's Room [De Meisjeskamer] - Escape Room Nederland (Bunschoten, Netherlands)
0.052878
102
255
3317
#160
197
Ultimatum: Live or Die.. Make Your Choice - House Escape (Warsaw, Poland)
0.052739
12
35
229
198
Age of Magic - Escape Reading (Reading, UK)
0.052693
12
125
395
199
The Grand Wilshire Hotel - The Imaginarium (Toronto, ON, Canada)
0.052654
15
118
301
#166
200
Secret Subway [Titkos Metró] - E-Exit (Budapest, Hungary)
0.052526
26
200
1033
201
Red Riding Hood - The Mind Hunters (Athens, Greece)
0.052471
46
122
1186
202
Escape from The Red Room - SCRAP (Tokyo, Japan)
0.052469
22
149
462
#184
203
Swamp Of Sorrows: Death And Despair - Room 54 (Athens, Greece)
0.052354
47
234
1991
nom
204
Insanity [Obłęd] - Break The Brain (Bydgoszcz, Poland)
0.052304
22
32
428
205
King of the Bootleggers - Secret City Adventures (Toronto, ON, Canada)
0.052258
10
115
276
#169
206
Kidnapped in Barcelona - Kidnapped in BCN (Barcelona, Spain)
0.052234
53
192
2107
#154
207
Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (Brooklyn, NY, USA)
0.052113
24
144
944
#164
208
The Heist - Red Fox Escapes (Cambridge, MA, USA)
0.052103
23
159
830
209
Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (Louisville, CO, USA)
0.051977
34
167
1326
#171
210
Mrs. Rose's House - The Darkwood Village (Athens, Greece)
0.051972
73
243
2628
#103
211
The Skull Witch - Enchambered (Sacramento, CA, USA)
0.051868
32
159
1371
#175
212
The Secret Lab - Locked in Edinburgh (Edinburgh, UK)
0.051858
44
217
1262
#167
213
Temple of Doom [Świątynia Zagłady] - Open The Lock (Gliwice, Poland)
0.051838
20
38
383
214
The Interview [La Entrevista] - Cubick (Madrid / Mataró / Menorca / Valencia, Spain)
0.051834
97
238
3791
#168
215
Ruins of the Mystic Temple - Rabbit Hole Recreation Services (Louisville, CO, USA)
0.051746
32
162
1213
#176
216
Rebellion - Clock Escape Rooms (Athens, Greece)
0.051729
58
244
2213
nom
217
The Blackwood Affair [L’Affaire Blackwood] - Wake Up (Lyon, France)
0.051615
17
97
380
#127
218
L.A. Confidential - Lock Academy (Paris, France)
0.051334
38
236
1537
#139
219
The Pit - The Escapement (Margate, UK)
0.051131
43
201
1202
#172
220
Dream Weekend [Weekend de Rêve] - Sauve Qui Peut (Saint-Jean-sur-Richelieu, QC, Canada)
0.051047
25
116
571
nom
221
Boda Borg - Boda Borg (Boston, MA, USA)
0.051004
52
158
1633
#186
222
Henry Fortune's House of Illusion - Escape Quest (Macclesfield, UK)
0.050829
23
190
1002
#173
223
Futura - Futura (Barcelona, Spain)
0.050821
73
232
3062
#179
224
Below Zero [Bajo Zero] - Escapem (Sabadell, Spain)
0.050643
71
226
2875
#161
225
The Hour of the Beasts [La hora de las Bestias] - Katharsis (Mataró, Spain)
0.050378
55
166
1972
226
The Metro [Le Métro] - The Game (France) (Paris, France)
0.050347
50
245
1593
#159
227
Flight 815 - Down the Hatch (Voorburg, Netherlands)
0.050329
72
241
2409
#189
228
The Cutting Room - Locked in Edinburgh (Edinburgh, UK)
0.050232
23
201
954
#192
229
Chapter 2: Playtime - Lost Games (Las Vegas, NV, USA)
0.049863
23
191
703
nom
230
Time Machine - The Secret of Leonardo [Wehikuł Czasu - Tajemnica Leonarda] - Exit19.pl (Wrocław, Poland)
0.049760
30
130
774
231
The Mine Box - The Box (Greece) (Athens, Greece)
0.049649
61
175
1813
nom
232
The Study - The Basement (Sylmar, CA / Kansas City, MO / Las Vegas, NV, USA)
0.049631
59
214
1966
#180
233
Cannibal Island - Quest Factory (Paris, France)
0.049551
22
198
944
234
Volcano in Madagascar [Duch Wulkanu - Człowieki w Kotle] - Exit19.pl (Wrocław, Poland)
0.049546
24
80
560
235
Vampire [Wampir] - Exodus (Poznań, Poland)
0.049502
24
58
477
236
Submarine Bunker - Escape Rush (Brussels, Belgium)
0.049305
16
192
749
nom
237
The Comms Room - Escape in the Towers (Canterbury, UK)
0.049042
25
190
825
nom
238
Dodge City - Tulleys Escape Rooms (Crawley, UK)
0.048889
31
190
1272
nom
239
Special Ops: Mysterious Market - The Escape Game (Irvine, CA / San Francisco, CA / Jacksonville, FL / Orlando, FL / Atlanta, GA / Chicago, IL / New Orleans, LA / Minneapolis, MN / New York City, NY / Cincinnati, OH / Nashville, TN / Houston, TX, USA)
0.048658
96
189
2277
#191
240
Al Capone's Secret Bar [Тайният бар на Ал Капоне] - 3KEY Rooms (Sofia, Bulgaria)
0.048534
29
201
1265
#194
241
Katharsis - Caves of Banjul - No Escape (Athens, Greece)
0.048237
33
51
792
242
The U-Boat - Red Fox Escapes (Cambridge, MA, USA)
0.048230
19
158
718
243
Smugglers Den - Escape My Room (New Orleans, LA, USA)
0.048146
63
161
2019
nom
244
School of Magic [Escuela de Magia] - Yurmuvi (Gijón, Spain)
0.048099
18
162
966
245
The Battle for Britain - Escape Plan (London, UK)
0.048047
70
237
2637
#170
246
Mutiny - Tulleys Escape Rooms (Crawley, UK)
0.047935
49
200
1835
#193
247
Sub Terra - Co-Decode (Swindon, UK)
0.047917
23
190
968
248
It's a Doggy Dog World - Level Games / ESCapades LA (North Hollywood, CA, USA)
0.047800
56
168
1984
#208
249
Red Giant - Quest Room (Los Angeles, CA, USA)
0.047791
75
218
2489
#205
250
Ulysses Spaceship [Nave Ulysses] - Maximum Escape (Barcelona, Spain)
0.047649
58
221
2632
#212
251
Operation Steampunk [Operación Steampunk] - Incognito Escape Game (Madrid, Spain)
0.047380
47
198
2122
#181
252
Pirates of Polaris - The Escapement (Margate, UK)
0.047206
36
195
1070
#187
253
Poppa Plock's Wonky Workshop - Handmade Mysteries (London, UK)
0.047182
37
196
1431
nom
254
The Ticking Heart (Part 1) [The Ticking Heart (Tiel 1)] - Inside Breakout (Zug, Switzerland)
0.047068
16
171
844
255
Santa Muerte - E-Exit (Budapest, Hungary)
0.047044
69
261
2168
#201
256
Magic Kingdom - Maze Rooms (Los Angeles, CA, USA)
0.046982
56
171
1933
#218
257
Nazi Gold [Złoto nazistów] - Black Cat Escape Room (Warsaw, Poland)
0.046924
31
177
837
258
Ouija - Horror Box (Barcelona, Spain)
0.046633
64
229
2879
#195
259
Barum Dum - Cinema Escape (Barcelona, Spain)
0.046474
74
245
3348
#190
260
University of Magic: Dragon's Heart - Lucardo (Rawtenstall, UK)
0.046450
19
188
964
#203
261
The Clock Tower - Escape The Room (Chandler, AZ / Glendale, CA / Chicago, IL / Boston, MA / St. Louis, MO / New York City, NY / Fort Worth, TX / Houston, TX, USA)
0.046366
61
182
1803
nom
262
Necromancer - Ritual of Death [Nekromanta - Rytuał Śmierci] - Exit19.pl (Wrocław, Poland)
0.046155
29
129
809
nom
263
Lost Asylum - One Hour (France) (Paris, France)
0.046010
28
233
1097
#210
264
Beast of Berlin - The Room (Berlin, Germany)
0.045696
77
258
2766
nom
265
The Cursed Willy - Sherlocked Homes (Athens, Greece)
0.045639
66
209
2124
nom
266
Judgment Day - My Escape Club (Amsterdam, Netherlands)
0.045639
48
244
1627
nom
267
The Time Machine - Deadlocked Escape Rooms (Reading, UK)
0.045366
27
185
974
268
Revenge of the Sheep - clueQuest (London, UK)
0.045307
77
242
2566
nom
269
Go West - The Room (Berlin, Germany)
0.045236
74
269
2607
270
Detention - Ctrl Alt Esc (Margate, UK)
0.045224
25
183
827
271
Pirate Cave [Kalózbarlang] - Pirate Cave Escape Room (Budapest, Hungary)
0.045122
73
264
2325
#207
272
The Executioner [Der Henker] - House of Tales (Berlin, Germany)
0.044735
61
242
2186
nom
273
Vault 27 [Refugio 27] - Maximum Escape (Barcelona, Spain)
0.044670
72
235
2936
#219
274
The Crystal Maze - The Crystal Maze (London, UK)
0.044496
62
248
2153
#178
275
Another Dimension - Esc Rooms (Athens, Greece)
0.044387
46
135
1255
nom
276
The Psych Ward - Cross Roads Escape Games (Anaheim, CA, USA)
0.043757
27
131
1070
#220
277
White Mission [Fehér szoba] - Gozsdu Mission (Budapest, Hungary)
0.043166
85
262
2767
#222
278
The Lockwood Manor [Η Έπαυλη Lockwood] - Lockhill (Athens, Greece)
0.042439
60
177
1794
nom
279
Prison Break - The Escape Game (Irvine, CA / San Francisco, CA / Jacksonville, FL / Orlando, FL / Atlanta, GA / Chicago, IL / New Orleans, LA / Minneapolis, MN / Las Vegas, NV / New York City, NY / Cincinnati, OH / King of Prussia, PA / Nashville, TN / Pigeon Forge, TN / Austin, TX / Dallas, TX / Houston, TX, USA)
0.042292
102
210
2576
Phase 2 Online Room Results

2020 Phase 2 Online Room Results

The final online room rankings from Phase 2 are shown below. The top 10 online rooms have been awarded a TERPECA for Top Online Room and are shown in bold. Score is the final output of the analysis. Players is the number of players that ranked that room. Coverage is the number of other rooms in the list that were directly compared to that room by at least one player. Comps is the total number of comparisons made between that room and all other rooms by all players.

#
Room
Score
Players
Coverage
Comps
1
Pursuit of the Assassin Artist - Omescape (San Jose, CA, USA)
0.060081
82
24
741
2
Miss Jezebel Online - 60out Escape Rooms (Los Angeles, CA, USA)
0.059460
64
24
633
3
Virtual Exorcist - Emergency Exit (Ashton-under-Lyne, UK)
0.058927
64
24
723
4
The Beast - Emergency Exit (Ashton-under-Lyne, UK)
0.058835
57
24
654
5
The Vanishing Act Remote - Locurio (Seattle, WA, USA)
0.058804
35
24
479
6
The Truth About Edith - Mad Genius Escapes (Portland, OR, USA)
0.058099
90
24
788
7
Agent Venture Mission Three: B.A.D Side of the Moon - The Adventure Is Real (London, UK)
0.058018
25
24
395
8
Condemned 2 Online - NorCal Escape Co. (Yuba City, CA, USA)
0.058003
19
24
320
9
Project Avatar: First Mission - Legendary Quests (Lviv, Ukraine)
0.057782
80
24
738
10
Virtual X-Caper - Agent November (London, UK)
0.057731
60
24
680
11
Evil Dead 2: Official Remote Escape - Hourglass Escapes (Seattle, WA, USA)
0.057612
48
24
560
12
Ruins: Forbidden Treasure (Remote Adventure) - The Escape Game (Nashville, TN, USA)
0.057362
50
24
509
13
Villains - Fuzzy Logic Escape Room (Downers Grove, IL, USA)
0.057259
38
24
474
14
Horror Hotel: Online - Exit Now (Athens, Greece)
0.057196
46
24
533
15
Agent Venture Mission One: The Heist - The Adventure Is Real (London, UK)
0.056948
61
24
686
16
The Amsterdam Catacombs Online - Logic Locks (Amsterdam, Netherlands)
0.056934
34
24
388
17
Super Squad - Trapped Puzzle Rooms (St. Paul, MN, USA)
0.056916
32
24
492
18
Agent Venture Mission Two: Cyborg Island - The Adventure Is Real (London, UK)
0.056843
35
24
502
19
Seven Dwarves: Mining Mission (Live Video Digital Game) - Improbable Escapes (Kingston, ON, Canada)
0.056809
76
24
742
20
Before Moonrise (Play at Home) - Escape New Haven / Escape.Anywhere (New Haven, CT, USA)
0.056662
32
24
432
21
Excalibur - Livestream - MindTrap Escape Room (California) (Murrieta, CA, USA)
0.056640
31
24
359
22
Neverland: Heist on the High Seas (Live Video Digital Game) - Improbable Escapes (Kingston, ON, Canada)
0.056554
54
24
568
23
The Witch's Forest - Daydream (Toronto, ON, Canada)
0.056514
48
24
582
24
DTF: Drag Task Force - Mystery Mansion Regina (Regina, SK, Canada)
0.056384
49
24
614
25
The Diamond Heist Online [La Casse du Siècle Online] - The Box (France) (Metz, France)
0.056153
41
24
358
Phase 2 Company Results

2020 Phase 2 Company Results

The final company rankings from Phase 2 are shown below. The top 25 companies have been awarded a TERPECA for Top Company and are shown in bold. Score is the final output of the analysis. Top 25 and Top 50 are the number of in-person rooms from each company that finished in that tier, while Top 100/10 combines Top 100 in-person rooms with Top 10 online rooms. Finalists () is the number of rooms (both in-person and online) from that company that advanced to Phase 2, and Nominees () is the total number of rooms (both in-person and online) from that company that received at least one nomination. Last Year shows where the company was ranked last year if present.

Note that, as described in the Methodology section, while this data is interesting, we do not claim for this to be the authoritative list of the top 109 companies in the world, as companies lower on the list would not necessarily have been ranked this high if other rooms with fewer than the required number of nominations had made it to Phase 2.

#
Company
Score
Top 25
Top 50
Top 100/10
Last
Year
1
Mad Mansion (Spain)
0.372315
3
4
6
7
7
#5
2
The Room (Berlin, Germany)
0.322771
2
2
2
4
4
#1
3
Paradox Project (Athens, Greece)
0.322051
2
2
2
3
3
#9
4
Skurrilum (Hamburg, Germany)
0.230257
1
2
2
2
2
#4
5
Claustrophobia (Andorra / Russia / Spain)
0.230256
1
2
2
2
5
#11
6
Escape Dimension (Perpignan, France)
0.230255
0
2
2
2
2
7
Wyjście Awaryjne (Poland)
0.152300
0
0
2
5
5
#8
8
13th Gate Escape (Baton Rouge, LA, USA)
0.150847
1
1
2
3
6
#2
9
Palace Games (San Francisco, CA, USA)
0.150846
1
1
2
3
3
#6
10
Locurio (Seattle, WA, USA)
0.150481
0
1
2
3
3
#10
11
No Exit (Athens, Greece)
0.150122
1
1
2
2
2
12
Insomnia Corporation (Berga, Spain)
0.150120
1
1
2
2
3
#15
13
Escape Barcelona (Santa Coloma de Gramenet, Spain)
0.150119
0
1
2
2
2
#3
14
The Maze (Petah Tikva, Israel)
0.150117
0
0
2
2
3
#14
15
Omescape (Canada / USA)
0.150117
0
0
2
2
4
#43
16
Codex Escape Games (Laval, QC, Canada)
0.150116
0
0
2
2
3
17
Emergency Exit (Ashton-under-Lyne, UK)
0.150116
0
0
2
2
2
18
Exit19.pl (Wrocław, Poland)
0.076532
0
1
1
6
8
#23
19
The Escape Game (USA)
0.075073
0
0
0
4
7
#20
20
DarkPark (Netherlands)
0.074352
1
1
1
3
4
#18
21
Immersia Escape Games Canada (Canada)
0.074350
0
0
1
3
4
22
The Adventure Is Real (London, UK)
0.074350
0
0
1
3
3
23
Escaparium (Canada)
0.074349
0
0
1
3
6
24
The Basement (USA)
0.074346
0
0
0
3
4
#19
25
Tulleys Escape Rooms (Crawley, UK)
0.074345
0
0
0
3
3
#31
26
Escape Room Nederland (Bunschoten, Netherlands)
0.073629
1
1
1
2
2
#21
27
Trip Trap (Geneva, Switzerland)
0.073626
1
1
1
2
3
#12
28
Hidden Games (Germany)
0.073624
0
1
1
2
5
#17
29
Abduction (Badalona, Spain)
0.073624
0
1
1
2
2
#22
30
The Chamber (Prague, Czech Republic)
0.073624
0
1
1
2
3
#24
31
Unreal Room Escape (Spain)
0.073623
0
1
1
2
4
#7
32
AdventureRooms (Switzerland)
0.073623
0
1
1
2
4
33
Experiencity (Spain)
0.073623
0
0
1
2
3
34
Escapepolis (Athens, Greece)
0.073622
0
0
0
2
3
#60
35
TickTack (Gliwice, Poland)
0.073621
0
0
1
2
2
36
Doldrick's Escape Room (Kissimmee, FL, USA)
0.073621
0
0
1
2
3
#59
37
Improbable Escapes (Kingston, ON, Canada)
0.073621
0
0
0
2
3
38
Lockhill (Athens, Greece)
0.073621
1
1
1
2
2
#54
39
The Code Agency (Düsseldorf, Germany)
0.073620
0
0
0
2
2
40
Sauve Qui Peut (Canada)
0.073620
0
0
1
2
5
41
Quest Cage (Katowice, Poland)
0.073619
0
0
0
2
2
42
Houdini's Escape Room Experience (Southampton, UK)
0.073619
0
0
0
2
2
43
Escaped (Athens, Greece)
0.073619
0
0
0
2
3
#48
44
Break The Brain (Bydgoszcz, Poland)
0.073619
0
0
0
2
3
45
Dom Tajemnic (Częstochowa, Poland)
0.073619
0
0
0
2
2
46
Lock Academy (Paris, France)
0.073619
0
0
0
2
3
#26
47
One Hour (France) (Paris, France)
0.073619
0
0
1
2
2
#30
48
Escape My Room (New Orleans, LA, USA)
0.073618
0
0
0
2
3
#16
49
Enchambered (Sacramento, CA, USA)
0.073618
0
0
0
2
2
#33
50
The Game (France) (Paris, France)
0.073617
0
0
0
2
3
#29
51
Rabbit Hole Recreation Services (Louisville, CO, USA)
0.073617
0
0
0
2
3
#34
52
Horror Box (Barcelona, Spain)
0.073617
0
0
0
2
2
#32
53
Escape Rush (Brussels, Belgium)
0.073617
0
0
0
2
2
54
clueQuest (London, UK)
0.073617
0
0
0
2
2
#63
55
Locked in Edinburgh (Edinburgh, UK)
0.073617
0
0
0
2
2
#38
56
Yurmuvi (Gijón, Spain)
0.073616
0
0
0
2
2
57
Cross Roads Escape Games (Anaheim, CA, USA)
0.073616
0
0
0
2
3
#37
58
Red Fox Escapes (Cambridge, MA, USA)
0.073616
0
0
0
2
2
59
E-Exit (Budapest, Hungary)
0.073616
0
0
0
2
3
#75
60
The Escapement (Margate, UK)
0.073615
0
0
0
2
2
#36
61
Maximum Escape (Barcelona, Spain)
0.073613
0
0
0
2
4
#40
62
Logic Locks (Amsterdam, Netherlands)
0.073260
0
1
1
2
3
63
Escapologic (UK)
0.005139
0
0
0
1
7
#45
64
Maze Rooms (USA)
0.005134
0
0
0
1
7
#41
65
60out Escape Rooms (Los Angeles, CA, USA)
0.003322
0
0
1
1
5
#42
66
MindTrap Escape Room (California) (USA)
0.002955
0
0
0
1
4
67
Quest Room (USA)
0.002949
0
0
0
1
4
68
Boxaroo (Boston, MA, USA)
0.002235
1
1
1
1
3
#53
69
13th Hour Escape Rooms (Wharton, NJ, USA)
0.002230
0
0
1
1
3
70
Mad Genius Escapes (Portland, OR, USA)
0.002228
0
0
1
1
3
71
Escape City Buffalo (Buffalo, NY, USA)
0.002226
0
0
0
1
3
#27
72
Secret City Adventures (Toronto, ON, Canada)
0.002224
0
0
0
1
3
#49
73
Down the Hatch (Voorburg, Netherlands)
0.002222
0
0
0
1
3
#73
74
Escape The Room (USA)
0.002219
0
0
0
1
3
#79
75
Quest-Art (Moscow, Russia)
0.001506
0
1
1
1
2
#55
76
Cabinet Mysteriis (Québec City, QC, Canada)
0.001503
0
1
1
1
2
77
Crypto Escape Rooms (Canada)
0.001502
0
0
1
1
2
78
Trapgame (Charrat, Switzerland)
0.001502
0
0
1
1
2
#13
79
The Gate Escape (Leominster, MA, USA)
0.001501
0
0
1
1
2
#57
80
Open Mind Room Escape (Barcelona, Spain)
0.001501
0
0
1
1
2
81
Hype Esc (Tel Aviv, Israel)
0.001501
0
0
1
1
2
82
Mr Lock (Bydgoszcz, Poland)
0.001500
0
0
1
1
2
83
MindMaze (Prague, Czech Republic)
0.001500
0
0
0
1
2
84
Pier Pressure (UK)
0.001500
0
0
0
1
2
#61
85
The Escape Room Rijswijk (Rijswijk, Netherlands)
0.001499
0
0
0
1
2
86
Cryptology (Nottingham, UK)
0.001499
0
0
0
1
2
87
Revo Escape (Toronto, ON, Canada)
0.001499
0
0
0
1
2
#67
88
Trapped Puzzle Rooms (St. Paul, MN, USA)
0.001498
0
0
0
1
2
89
SawRoom (Sofia, Bulgaria)
0.001498
0
0
0
1
2
90
Ravenchase Adventures* (USA)
0.001498
0
0
0
1
2
#44
91
Mystery Mansion Regina (Regina, SK, Canada)
0.001498
0
0
0
1
2
92
Time Maze (Baden, Switzerland)
0.001498
0
0
0
1
2
93
Extremescape (Disley, UK)
0.001497
0
0
0
1
2
#25
94
66 Minuten (Neuwied, Germany)
0.001496
0
0
0
1
2
95
L'Atelier des Énigmes (Annecy, France)
0.001496
0
0
0
1
2
96
Archimedes Inspiration (London, UK)
0.001496
0
0
0
1
2
#69
97
Escape Reading (Reading, UK)
0.001495
0
0
0
1
2
98
SCRAP (Tokyo, Japan)
0.001495
0
0
0
1
2
99
Cubick (Spain)
0.001495
0
0
0
1
2
#39
100
Escape Quest (Macclesfield, UK)
0.001494
0
0
0
1
2
#72
101
The Box (Greece) (Athens, Greece)
0.001493
0
0
0
1
2
102
Escape Plan (London, UK)
0.001492
0
0
0
1
2
103
Co-Decode (Swindon, UK)
0.001492
0
0
0
1
2
104
Level Games (North Hollywood, CA, USA)
0.001492
0
0
0
1
2
#76
105
Black Cat Escape Room (Warsaw, Poland)
0.001491
0
0
0
1
2
106
Lucardo (UK)
0.001491
0
0
0
1
2
107
Sherlocked Homes (Athens, Greece)
0.001490
0
0
0
1
2
108
Ctrl Alt Esc (Margate, UK)
0.001490
0
0
0
1
2
109
NorCal Escape Co. (Yuba City, CA, USA)
0.001135
0
0
1
1
2

* Originally the multiple venues owned by Ravenchase Adventures were incorrectly treated as separate companies, so the first version of this table listed Escape Room Herndon at #90 rather than Ravenchase Adventures.

The Ones Receiving Emails

The Board

Rich Bragg (Los Altos, CA, USA) is the founder of the Top Escape Rooms Project. Rich has played over 900 escape rooms and over 300 puzzle hunts in North America and Europe. He participated in both the 2017 and 2019 Red Bull Escape Room World Championships, is a former Guinness World Record holder for most escape rooms played in one day, and is the co-founder and CEO of ClueKeeper, a platform for creating and playing location-based clue hunts.
Sarah Dodd (London, UK) has played just over 1800 rooms. This makes her almost certainly the most experienced escape room player in the western world alongside Sharan, with whom she's played every single game. Together they have a 99.8% escape rate, have played in 17 different countries, and once played 615 games in a single year. Only discovering escape rooms in May 2016 when Sarah decided to book something spontaneous for her own birthday, they have since been members of Team UK during both Red Bull Escape Room World Championships. They've played approximately 500 games as a pair and shared 1000 games with over 80 different teammates from around the world, at least 500 of which have been with the incumbent UK team, Team Squared. Sera co-founded and has run the UK Escape Room Industry Conference (ERIC) for the past three years, works as a UX and Design Consultant within the industry, was a speaker and panelist at Up the Game in 2017, 2018 and 2019, is an admin of the UK Escape Room Owners Facebook group, a moderator on the UK Escape Room Enthusiasts Group, one of three co-hosts on a new UK-based ER podcast, runs Team Squared’s Instagram account and has been featured in the UK press, TV and radio on a number of occasions. Her real hobbies include bouldering and befriending wild animals. In her spare time, she's a doctor.
Dan Egnor (San Mateo, CA, USA) has played over 900 rooms and is a former Guinness World Record holder for most escape rooms played in one day. He was the creator and maintainer of the now defunct, but much beloved, Escape Room Directory, and he contributed to the design and production of The Edison Escape Room at Palace Games in San Francisco, a multiple TERPECA Top Room winner.
Ken Ferguson (London, UK) has played over 800 rooms and runs The Logic Escapes Me, an escape room review blog covering the UK and Europe, as well as Exit Games UK, a directory, map, and news site for UK games. He was a member of Team UK in the 2017 Red Bull Escape Room World Championship, was on the design team for the 2019 competition, and was a speaker at both the UK and European escape room conferences in 2017, 2018, and 2019.
David and Lisa Spira (New York City, NY, USA) have both played over 800 rooms, publish about escape rooms daily at RoomEscapeArtist.com, launched in 2014, and have served on the nomination panel for the USA Today 10 Best Escape Rooms. They keep an updated directory of escape room companies in the United States and run Escape Immerse Explore, group tours to some of the country's best escape rooms... and contrary to popular assumption, they also have day jobs.
Our Liaisons to the World

The Ambassadors

In 2020, the TERPECA Regional Ambassador Program was launched to help with outreach to known regions from around the world where escape rooms are popular. These ambassadors helped recruit participants, process rooms, raise awareness of the project, and much more.

Stefan Bauer, representing Austria, is one half of Two Bears Life, a couple who loves to travel the world and discover new and exciting escape rooms all over the globe.
Dimitar Smilyanov and Nadezhda Danabasheva, representing Bulgaria, play together on Team Fury, which finished 6th at the 2019 Red Bull Escape Room World Championships. They blog about their team's experience playing escape rooms around the world and online on Nadia's Blog and at Fury Escape.
Melissa Faucher, representing France is a contributor to EscapeGame•fr, an escape room directory and review site for France and beyond.
Heiner Stepen, representing Germany, runs the Escape Roomers DE Facebook group and the Escape Roomers DE website, which reviews and aggregates rankings for escape rooms throughout Europe and online.
Elli Kouliadelli, representing Greece, is a well-connected enthusiast that is also a coordinator for the <3 4 Escape Rooms Facebook group for Greek enthusiasts.
Ron Kagan, representing Israel, is a well-connected enthusiast who has played more games than anyone from Israel, including having played every game within the nation.
Pim Arts, representing the Netherlands, runs EscapeTalk.NL, an escape room enthusiast platform serving The Netherlands, Belgium, and Luxembourg.
Wojciech Nadara, representing Poland, is a well-connected enthusiast, whose team, Ewarsaw Eagles, finished 3rd in PolandEscape 2019 and 13th in ER Champ 2020.
Victor Espriu, representing Spain, is an admin of the Spanish enthusiasts' group Room Escapers and a member of El Quinto Elemento, a team that travels the world and blogs about their adventures.
They Played All The Rooms

The Contributors

The following 596 people contributed to the 2020 TERPECA awards as voters and/or nominators. We do not specifically identify the 186 nominators for privacy reasons.

Note that the rooms played total for each person mentioned in this section were all self-reported as of October 31, 2020, and there is no clear consensus as to what people do and don't count as a room towards their total, although these totals do include the types of rooms that qualified for our online room category.

Rooms Played: 264
With 264 rooms played in nine countries, Pa is a journalist and event coordinator who helped create Australian blog Lock Me If You Can. She loves travelling, puzzling and reading detective stories.
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 135
Keziah is an escape room enthusiast and owner, who has played around 115 escape rooms, and loves to vlog about their experiences on their business Facebook page, Youtube, Instagram, and LinkedIn. They own Seraphim Escape Room in Ipswich, Qld, Australia, and currently have three games to choose from: Santa's Cottage (family friendly), Executioner's Toolshed (horror) and Atonement (Thriller with side quest)
Affiliated Rooms: 1
  • Executioner's Toolshed - Seraphim Escape (Australia)
Ranked Rooms: 0 (sorted by location)
Rooms Played: 178
My name is Julia I am an Escape Room enthusiast having done over 175 physical escape rooms and 20 online escape rooms. I first learnt about escape rooms back in 2017 where I became hooked on them in the UK and travelled around 7 countries in Europe in 2 months completing 50 escape rooms. Where my partner Darren and I decided to come home and start our own business Elude Escape Rooms in Galston. We have a passion for the industry and want to help this industry grow in Australia.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Curio - Escapologic (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
Rooms Played: 130
Lee-Fay Low (Sydney, Australia) has played over 130 rooms in 6 countries, assists in compiling the annual Escape Room Enthusiast Survey. https://thecodex.ca/2018-escape-room-enthusiast-survey/ and helped organise the escape room conference RECON 2020
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Inventor's Attic - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 290
Alex is a Mexican enthusiast living in Austria and part of the TwoBearsLife.com group
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Interview - Cubick (Spain)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 290
Stefan is one half of Two Bears Life, a couple who loves to travel the world and discover new and exciting Escape Rooms all over the globe.
Affiliated Rooms: 0
Ranked Rooms: 33 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Interview - Cubick (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 50
Not only am I at Moonscape in Mondsee, Austria, Escape Room Owner with all my heart, I am a real Escape Room enthusiasts too. Each of my trips starts with finding out whether there are any Escape Rooms on the way. Escape rooms have enriched my live in every way.
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
Rooms Played: 150
Lukas Rauscher is the Co-Founder and Creative Director of Crime Runners. Originally working in Public Relations, he changed his career path after playing his first Escape Room in 2014. He founded Crime Runners (www.crimerunners.at) in August 2015 with Stefan Tauchhammer, Steffen Volkmer and later Uli Breunig. Simultaneousily, he started to play more and more rooms: At first it was only market research, but it didn’t take very long till the addiction kicked in. Most of his time is completely used for Crime Runners, but in the minor occasions he actually has a day off, he uses it for playing Escape Rooms. His room counter says 150 games all over Europe.
Affiliated Rooms: 1
  • Going Underground - Crime Runners (Austria)
Ranked Rooms: 35 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Brewery - Enigmik (Spain)
  • Catacombs - Golden Pop (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 60
Uli develops tech stuff at Crime Runners in Vienna, and enjoys playing good games!
Affiliated Rooms: 1
  • Going Underground - Crime Runners (Austria)
Ranked Rooms: 11 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 90
Escape room enthusiast and owner of Open The Door in Vienna (Austria).
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
Rooms Played: 110
I run Open The Door, an Escape Room Company in Vienna together with my husband since 2015. We have been to around 10 different countries to play games and the list is still long. I love the combination of challenging puzzles and beautiful settings and that is also the focus of our rooms, where I try to put my creativity into.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
Rooms Played: 175
Derk is a Brussels-based escape enthousiast who has played more than 100 rooms in 12 different countries (mainly Europe: Netherlands, Belgium, Poland, Spain, Germany, and France) and is an active reviewer on the Dutch and Belgian review websites www.escapetalk.nl and www.debesteescaperooms.be.
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • L.A. Confidential - Lock Academy (France)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Freakshow - Break The Brain (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Roomanji - Ilusium (Spain)
  • The Mine - Unreal Room Escape (Spain)
Rooms Played: 165
Escape enthusiast, with +165 rooms played, & owner of two Belgian Escape room portal websites + Exitroom. Member of the board of the Belgian Escaperoom Federation.
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 155
Kobe Heleven, Student 22 years old, World Record Holder Most Escape Rooms in 24h, organiser of the first Belgian Championship of Escape Rooms in Stabroek. Founder and owner of company Loconsilio Game Design.
Affiliated Rooms: 0
Ranked Rooms: 1 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
Rooms Played: 103
My Wive and i have played over 100 escape rooms together. We have being playing for 4 years. Around 90% of the rooms we have played. We played it only with each other. When we Played our fitst room, we where sold immediately.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Go West - The Room (Germany)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 85
Joeri is a Vlogger, 3rd place Red Bull Mind Gamer and puzzle creator. An all around creative guy whose goal is to entertain the masses.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Submarine Bunker - Escape Rush (Belgium)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Judgment Day - My Escape Club (Netherlands)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 59
I like to play video & real time escape games, walking & watching movies & series. I am member of an escape team in Belgium, and have played about 60 rooms by now.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
Rooms Played: 123
Yves, 38 years old. Owner of www.beyondthegame.be podcast, owner of the website www.want2escape.be.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 61
34 years old, always gone in 60 minutes
Affiliated Rooms: 0
Ranked Rooms: 1 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
Rooms Played: 60
I'm a problem/puzzle solver both in personal and professional life. While solving an issue or just choosing a product to buy, I can process a lot of information fast and after the task is done to forget it completely, which caused me some troubles in my university years. My team title is "The Consul(t)" as I am both a consul - not living in the city of the team and a consultant as a job position. While in a room, I describe myself more of a thinker than a doer, but I can switch if it needs to. Combining thoughts of teammates is newly explored area for me with the team. A good laugh is mandatory for me while solving puzzles at the recap after the game.
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Paradox Project: The Mansion - Paradox Project (Greece)
Rooms Played: 210
Escape rooms enthusiast, Gamer and a Software Engineer. Participant in the Red Bull Escape Room World Championships 2019.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 100
Escape room enthusiast with over 100 rooms played in 7 different countries and online. With team "Fury" he won the Greek qualification for the Red Bull Escape Room World Championships 2019 and finished 6th on the finals in London.
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • The Dome - Escape Room Nederland (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 160
Escape room owner of two of the best horror rooms in Sofia, Bulgaria
Affiliated Rooms: 2
  • SawRoom: Game Over - SawRoom (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
Ranked Rooms: 12 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 67
The Лъ in team ВъЖъЛъДъ - 4 Bulgarian girls who have played over 65 rooms together. Puzzle hunt enthusiast. Board game geek. Digital marketing professional.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
Rooms Played: 200
Escape enthusiast from Sofia, Bulgaria. With her team, Fury, she has played 200 rooms in the last 6 years. Fury came 6th at the Red Bull Escape Room World Championship 2018. Nadia writes and maintains the only Bulgarian blog about escape rooms in the region. Scary rooms are not her forte :)
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • The Dome - Escape Room Nederland (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 50
Started playing escape rooms 3 years ago. Mostly in my home town, but I've played with team Fury in Greece, Serbia and the Netherlands. Some of the rooms I've played have been documented at https://www.danabasheva.com/category/escape-rooms/ I took part in the 2019 Red Bull Escape Room World Championship with team Fury and we got 6th place among the 22 teams.
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • The Mine Box - The Box (Greece) (Greece)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 51
Escape rooms owner and enthusiast. I have played a little more than 50 rooms in 4 different countries.
Affiliated Rooms: 2
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
Ranked Rooms: 3 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
Rooms Played: 50
I'm Errol's sister. So, escape rooms were inevitable.
Affiliated Rooms: 0
Ranked Rooms: 3 (sorted by location)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
Rooms Played: 85
After completing my first escape room on my 30th birthday, I was hooked and have continued my quest for more. As I did more, I started designing puzzles for family and friends and look to continue to learn more and experience more in the escape room world!
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 68
Andrew has played 68 rooms, is an owner of Escape From the 6 I’m Mississauga, Canada and has played in Canada, the US, and Malaysia.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
Rooms Played: 96
ER owner and room designer, and avid enthusiast.
Affiliated Rooms: 1
  • Saboteur - The Crux Escape Rooms (Canada)
Ranked Rooms: 2 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • Prison Break - The Escape Game (United States)
Rooms Played: 56
I’m an experiential graphic designer by day, and escape room enthusiast by evenings/weekends. There’s a lot of overlap between my career and my love of escape rooms… except when I design airport signage and wayfinding, I include as few puzzles as possible!
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Chapter 2: Playtime - Lost Games (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 81
Cédric Duchesne is only 14, but he's played over 80 rooms in 2 different countries.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Rooms Played: 50
Flora Duchesne is only 12, but she's played over 50 rooms in two countries.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Rooms Played: 217
Gilles Duchesne has played over 200 rooms, and runs a blog called The ESC Key (https://theesckey.blogspot.com/). He's the proud father of 4 kids aged 10-16, who have each played at least 50 rooms themselves.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Rooms Played: 71
Julie Brodeur likes Escape Rooms just fine, but her husband loves them, and, well, she loves him. :-)
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Rooms Played: 51
Léandre Duchesne will tell you loud & clear that he doesn't like Escape Rooms, but that 10-year-old still managed to play 50 of them, in 2 different countries.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Rooms Played: 79
Éloïse Duchesne is only 16, but she's played over 75 rooms in two countries.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Rooms Played: 150
I am an escape room enthusiast. I have played well over 100 rooms since the pandemic started as well as about 50 brick and mortar rooms prior to that. I have been both beta tester and enthusiast on many occasions
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 270
Errol Elumir creates puzzle hunts and large scale theatrical escape events. He also co-hosts the podcast Room Escape Divas, compiles the annual Escape Room Enthusiast Survey, has 13 Rules for Escape Room Puzzle Design, and keeps a number of his articles on the infrequently visited website thecodex.ca. He's a freak about puzzle design.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Escape from The Red Room - SCRAP (Japan)
  • Lab Rat - Hatch Escapes (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
Rooms Played: 115
Escape Room enthusiast with over 100 rooms completed. I have been published in my internal company magazine, circulated across 2500 employees, about best practices in escape rooms and how it can apply to your success at work. Co-Host of an escape room meetup on meetup.com with 149 members and 18 events to date. I have also completed multiple rooms outside of my city and Canada (3 being on the top 50 list- Palace Games, SF, Escape Games, Barcelona & Enigmik, Barcelona ). In April, we will be traveling to Baton Rouge to complete room #'s 4 & 50 on the 2019 list and completing rooms at Escape my Room in New Orleans and visiting Locurio in Seattle before March.
Affiliated Rooms: 0
Ranked Rooms: 3 (sorted by location)
  • Alien: The Origin - Escape Barcelona (Spain)
  • The Edison Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
Rooms Played: 285
Manda Whitney (Toronto, ON, Canada) has played over 250 rooms and is a co-host of Room Escape Divas, a popular escape room podcast. She has also done narrative design for various escape rooms, including the first one in North America to be done on a moving train. Her articles on narrative design as well as other nerdy musings can be found at mandawhitney.com.
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Escape from The Red Room - SCRAP (Japan)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Playground - The Escape Game (United States)
Rooms Played: 90
A brand & people photographer in Toronto with a cat named Mochi and an aloe named Rupert.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
Rooms Played: 105
Enthusiast that co-hosts a monthly escape room club. Last year I completed my 100th room on my wedding day. Live in and completed 99 rooms in Canada and 6 international. Now planning annual international trips based on the TERPECA lists.
Affiliated Rooms: 0
Ranked Rooms: 1 (sorted by location)
  • Alien: The Origin - Escape Barcelona (Spain)
Rooms Played: 450
Mike Yuan (Toronto, ON, Canada) has played over 400-450 rooms, runs Escape Games Review, a Toronto-focused escape room review site, and is a co-host of Room Escape Divas, a popular escape room podcast.
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Escape from The Red Room - SCRAP (Japan)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Playground - The Escape Game (United States)
Rooms Played: 400
Part of the REDIVAs and contributor to the Escape Games Review blog. Played over 300 escape rooms both inside and outside of Canada. Was part of the Canadian Caper team that brought immersive live theatrical escapes to Toronto.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Playground - The Escape Game (United States)
Rooms Played: 81
I'm a programmer by day and a... programmer by night. I love escape games and boardgames. I am the creator of escapedia.ca
Affiliated Rooms: 3
  • Spaceship Graveyard - Codex Escape Games (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
Ranked Rooms: 8 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
Rooms Played: 60
Escape room enthusiast since 2017, I have a blog named " Le poulet en fuite" (The escaping chicken). I am also a game master at Escaparium (Rossignol) and used to be a game master at Codex (Rest in pieces sweet angel)
Affiliated Rooms: 9
  • Spaceship Graveyard - Codex Escape Games (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Final Stop - Escaparium (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Wizard Four and the Rise of Lord Thulsa - Escaparium (Canada)
  • Tyranno Industries - Escaparium (Canada)
Ranked Rooms: 5 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
Rooms Played: 480
Owner of Escaparium Escape Games in Quebec. As much of a player as an owner, played over 425 games now, can't stop, won't stop!
Affiliated Rooms: 6
  • The Final Stop - Escaparium (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Wizard Four and the Rise of Lord Thulsa - Escaparium (Canada)
  • Tyranno Industries - Escaparium (Canada)
Ranked Rooms: 20 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 173
I played my first room on january 28th 2015 and now I am a manager in an escape room company
Affiliated Rooms: 4
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Warp Inc. - Immersia Escape Games Canada (Canada)
Ranked Rooms: 7 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
Rooms Played: 185
Enthusiast and Owner of Codex Escape Games
Affiliated Rooms: 3
  • Spaceship Graveyard - Codex Escape Games (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
Ranked Rooms: 19 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 180
I was co-owner of Codex Escape Games (Laval, Québec) with Kevin Currie. I am predominantly a visual artist with a love for set designs.
Affiliated Rooms: 9
  • Spaceship Graveyard - Codex Escape Games (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Final Stop - Escaparium (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Wizard Four and the Rise of Lord Thulsa - Escaparium (Canada)
  • Tyranno Industries - Escaparium (Canada)
Ranked Rooms: 16 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 101
Enthusiast with 101 rooms played, active in the community! I created a Facebook group for French enthusiasts in Quebec, Canada that has now more than 2700 members.
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
Rooms Played: 50
Escape room enthousiast always looking for a new challenge. I have tremendous admiration for those who create and build rooms and always push the boundaries of human brains and human behaviours.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
Rooms Played: 87
Escape room enthusiast, always looking forward to the next one!
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 204
Patrick Pilon has played 200+ games across 7 countries, is one of the administrators of the french speaking facebook group “Accros aux jeux d’évasion” as well as one of the organisers of “Triathlon des accros” events that aim to plan meet-ups with local escape room enthusiasts. He's one of the collaborators of escapedia.ca and contributed the data gathered from all rooms in Canada to the platform. His team won the 2019 Enigmorama escape games competition in Québec.
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Santa Muerte - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 204
Catherine Perreault has played over 200 escape games since 2016 mainly in the province of Québec, Canada, but also in Europe and the US. She is part of the winning team for the Enigmorama 2019 competition.
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Santa Muerte - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 154
I am a moderator of the Québec`s enthousiasts groupe : Accros aux jeux d'évasion. I have posted numerous reviews on this group if you want to look at it. I`m am also a member of ontario`s enthousiasts group.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 231
First room played in 2016. After 40 rooms played, together with my partner in crime Jessica, I have started a french Escape game blog. We mostly play in the province of Quebec and in France, but also played in the USA. COVID gave us live stream games, so this is mostly what we played lately.
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 85
I started in 2017 and since then I can't stop solving puzzles. My specialty : decoding!
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • The Clock Tower - Escape The Room (United States)
Rooms Played: 214
I’m a French Blogger from Quebec, do all the escape room with 5 friends. I’ve discover Escape room in 2018 and since, i’m totally addicted.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • The Storyteller's Secret - Boxaroo (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Playground - The Escape Game (United States)
Rooms Played: 176
Member of Les Fugitifs
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • The Storyteller's Secret - Boxaroo (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 250
Owner of SQP. I have done over 250 escape rooms across Canada and the US
Affiliated Rooms: 5
  • Dream Weekend - Sauve Qui Peut (Canada)
  • John Jackson's Estate - Sauve Qui Peut (Canada)
  • Undercover Bar - Sauve Qui Peut (Canada)
  • Vortex Past - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
Ranked Rooms: 27 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 86
I'm an enthusiast since my first escape room in 2017. My girlfriend and I are doing all of our rooms together, now more than 80. I'm active on social media especially the FB group "Accros aux jeux d'évasion", which is the Québec french canadian group of escape games enthusiast.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Salutem Medicina Institute - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • The Clock Tower - Escape The Room (United States)
Rooms Played: 184
French Canadian blogger from Quebec at www.evadesencavale.ca, They've played most of their 100+ games in their home country, but have also done some in England, Morocco and United States. They love the escape room community and so organized three enthusiasts meet-ups in Quebec, where they played with random teams of passionate players.
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 135
A hobby has almost become an addiction... I have a mission to play in as many countries as possible. Thanks to remote escape rooms and great teammates I have now played 135 games in 32 different countries.
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 240
I founded the experienceimmersive.fr website more than 3 years ago to talk about escape games but also about virtual reality and other unusual and immersive experiences. I have played in several countries: England, Spain, Germany, Canada and of course France.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Live Thriller - Borderlive Concepts (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 415
Valentin is the runner of the French blog, Le Meilleur Escape Game (https://lemeilleurescapegame.fr/) with Alexis Lemeg. He played more than 400 escape rooms mostly in France, but also in Spain, Netherlands, Budapest and Geneva. They have a top by year for 19 of the main cities in France and a ranking of the best escape game in Paris for English speakers here: https://lemeilleurescapegame.fr/les-tops/top-paris/top-list-best-escape-rooms-paris/
Affiliated Rooms: 0
Ranked Rooms: 46 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 137
I am from France and I play escape rooms since 2017. I have played 136 rooms so far, in France, Portugal, the Netherlands and Belgium. I love escape rooms so much, that I even have a blog to talk about my experiences.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
Rooms Played: 169
Co-founder and redactor of lemeilleurescapegame.fr, I have played around 170 rooms in France and Netherlands.
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 210
Lucas has played 210 rooms in several countries (France, Hungary, Bulgaria, Canada, Greece, Austria, Czech Republic)
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Submarine Bunker - Escape Rush (Belgium)
  • BlueLab - Endorphin Games (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Jungle Quest - Escape Dimension (France)
  • Mystery on Lived Street - Escape Dimension (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
Rooms Played: 226
Escape room fanatic, i travel the world to eat and play :-)
Affiliated Rooms: 0
Ranked Rooms: 24 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Lost Asylum - One Hour (France) (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Room 107: Otherside - Escaped (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Catacombs - Golden Pop (Spain)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 707
Magritte has played 700 + rooms, mainly in France, the Netherlands, Austria and Online with her boyfriend Nicolas Jaubert. They have created the team: Serial-Escapers and enjoy playing with different players and sharing their passion with enthousiats from all around the world as well as new players. They have started to write about their experiences on their blog: serial-escapers.com They love escaping, love playing and love to travel in order to be locked in to break out.
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Live Thriller - Borderlive Concepts (France)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 451
Nicolas has played more then 450 rooms in several coutries. With his girlfriend Magritte he has formed the Serial-escapers. They write for the French blog Serial-escapers.com . He enjoys playing with enthusiasts as well as first time players. Escaping is a real addiction.
Affiliated Rooms: 0
Ranked Rooms: 28 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Live Thriller - Borderlive Concepts (France)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 110
I am a French Escape Room enthusiast. I have played over 100 escape rooms, mainly in France, but also Spain, Andorra and Belgium. As I find that players reviews are very important for others to select the best rooms they can find, and for the owners to promote their rooms, I would gladly give my point of view for the TERPECAs.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • The Live Thriller - Borderlive Concepts (France)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Blackwood Affair - Wake Up (France)
Rooms Played: 246
Totally addict to escape rooms, I share my passion in my blog : http://lesglandus.fr/. I only live to schedule escape trips everywhere and meet enthusiasts, players, ER owners
Affiliated Rooms: 0
Ranked Rooms: 24 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • Jungle Quest - Escape Dimension (France)
  • Mystery on Lived Street - Escape Dimension (France)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • Santa Muerte - E-Exit (Hungary)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 309
Alexis is the co-runner of the French blog, Le Meilleur Escape Game (https://lemeilleurescapegame.fr/), that he created with Valentin. They have played 309 escape rooms mostly in France, but also in Spain, Netherlands and Switzerland. They have a ranking by year for 19 of the main cities in France and like to also review new kind of immersive concepts like action games or immersive theater.
Affiliated Rooms: 0
Ranked Rooms: 42 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 211
My name is Aline, I am a French blogger for escapegameblog.wordpress.com. I started playing escape rooms 4 years ago and have played more than 200 rooms within Europe. I am also a huge fan of cinema and I'm easily affraid in the rooms, even when they are not supposed to be scary!
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • Haunted House - The Chamber (Czech Republic)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Go West - The Room (Germany)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
Rooms Played: 72
Manager at Pandore & Associés (Paris, France) created in 2020. It's 1st room "Fairy Tale Regulations" [Règlement de Contes] is a 2020 TERPECA nominee and finalist.
Affiliated Rooms: 1
  • Fairy Tale Regulations - Pandore & Associés (France)
Ranked Rooms: 9 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
Rooms Played: 340
Cindy likes to escape.
Affiliated Rooms: 2
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
Ranked Rooms: 15 (sorted by location)
  • Submarine Bunker - Escape Rush (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • The Live Thriller - Borderlive Concepts (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 300
Hello, I am an avid and enthusiastic escape room player.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Blackwood Affair - Wake Up (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 130
Creator of "Un Trésor à Paris", treasure hunts in Paris inspired by escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • The Live Thriller - Borderlive Concepts (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
Rooms Played: 316
French escape game addict 316 rooms as of today, in France, UK, Spain, Italy and Russia
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • Jungle Quest - Escape Dimension (France)
  • Mystery on Lived Street - Escape Dimension (France)
  • Celestia - L'Atelier des Énigmes (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • The Metro - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • GhostHunters - Claustrophobia (Russia)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 60
As a UX designer, I love solving problems... escape rooms naturally attracted me and today, I'm looking for the best story telling and immersive experience possible. My favorite part is beta tests of new rooms where you help a new adventure to come true!
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • The Plane - The Game (France) (France)
Rooms Played: 581
Melanie Vives (Paris, France) has played more than 580 rooms in 12 countries and is a contributor to EscapeGame•fr (https://www.escapegame.fr/), an escape room directory and review site for France and beyond. She also creates escape game books and table top escape games (https://escapegame-livre.fr/) for adults and children that are published throughout Europe, Asia and USA.
Affiliated Rooms: 0
Ranked Rooms: 33 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Catacombs - Golden Pop (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 580
Melissa has played 580+ rooms in 12 countries and is a contributor to EscapeGame•fr (https://www.escapegame.fr/), an escape room directory and review site for France and beyond. She is the 2020 TERPECA Regional Ambassador for France.
Affiliated Rooms: 0
Ranked Rooms: 33 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Catacombs - Golden Pop (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 257
Phileas has played 257 escape room across 9 countries. He holds the blog Escape The World at https://escapearoundtheworld.wordpress.com/, and French translations of some of his articles are also available on the blog experienceimmersive.fr run by his friends Alexandra and Virginie. He has the opportunity to travel regularly for work to various areas in the world, and plays to the best local escape rooms whenever he can.
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • Over The Falls - Escape City Buffalo (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Storykeeper - Locurio (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 309
Hello, I'm Quentin, 29 years old, from Paris. I'm a speech therapist and an escape room player since 2015. I created, with Margaux Barré, Allo Escape. It's a website and a blog on escape rooms across France and some countries over the world. We've played over 300 escape rooms, and wrote an article on each on them on Allo Escape. We would be pleased to contribued on Top Escape Room Project ! Quentin
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • Jungle Quest - Escape Dimension (France)
  • Mystery on Lived Street - Escape Dimension (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Abduction 3: The Exam - Abduction (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
Rooms Played: 345
Rémy has played over 300 rooms in Europe since 2015. He is also a Game Designer at Lock Academy ( www.lockacademy.com ) and write escape books that are published in French and German
Affiliated Rooms: 5
  • Dollmaker - LiveCorp (France)
  • Unity - LiveCorp (France)
  • L.A. Confidential - Lock Academy (France)
  • Little Miss Lock - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
Ranked Rooms: 18 (sorted by location)
  • Submarine Bunker - Escape Rush (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • The Live Thriller - Borderlive Concepts (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 125
Founder of The Escapers, the social network for escape rooms: www.the-escapers.com ; 19.000 games have already been logged and 13.000 reviews have been published. Only available in french for now, but stay tuned for the international version ;)
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Slaughterhouse - One Hour (France) (France)
  • The Metro - The Game (France) (France)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 70
French player and big addict of board games and escape games. 50+ escape rooms to my credit.
Affiliated Rooms: 0
Ranked Rooms: 2 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Celestia - L'Atelier des Énigmes (France)
Rooms Played: 52
As long as I remember I always have enjoyed solving puzzles, riddles and other brain-teasers. So when I heard for the first time about escape games, in 2013 in London I immediately gathered a small team of friends from my work and booked one of the few rooms available by that time. After this first try we were already addicted to it! Since then I have played about more than 50 rooms, mainly with the same team. I consider myself as an escape room enthusiast, I enjoy this thrill of an escape room challenge the puzzles solving, the efficient communication required, the hunt for clues and the thrill of escaping in such a short time!
Affiliated Rooms: 0
Ranked Rooms: 3 (sorted by location)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • The Metro - The Game (France) (France)
  • Ulysses Spaceship - Maximum Escape (Spain)
Rooms Played: 220
Escape game fan, Toulousescape creator, member of RPG editor Les XII Singes. I have played over 220 rooms.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • La Pièce Odyssey - La Pièce (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
Rooms Played: 83
Fan of escape game since 2015, I have played 83 rooms, mainly in France, but also in Spain, Andorra and New Caledonia.
Affiliated Rooms: 1
  • In the Footsteps of the Guardians - Projet Dédale (France)
Ranked Rooms: 14 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • The Live Thriller - Borderlive Concepts (France)
  • Einstein's Letter - Le Passage (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • The Metro - The Game (France) (France)
  • Abduction 3: The Exam - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • The Mine - Unreal Room Escape (Spain)
Rooms Played: 116
I've been an Escape enthusiast for a few years now... At the beginning I played only one room here and there trying to restrict myself, then over the years I add more and more and don't really slow me down anymore... As soon as I have the opportunity to play, I go for it ! I love to play and share this passion with lots of friends and don't restrict myself to a single team implying that I've already played with 85 different people. I play mainly in France but I had the opportunity to go to Bulgaria to test several venues. Since a few months I even opened a blog with my brother-in-law: escapegroom.fr which allows us to give our opinion on the rooms and share our passion to the largest number.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Slaughterhouse - One Hour (France) (France)
  • In the Footsteps of the Guardians - Projet Dédale (France)
  • The Metro - The Game (France) (France)
Rooms Played: 206
I'm an Enthusiast that played over 200 rooms.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Geldrausch - 66 Minuten (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 75
I am a Escape Room player since 8 years in Europe.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 300
After 28 years working as a professional DJ playing techno and house in clubs around the world, Chris decided it was time for something completely different. His first escape game experience in London in March 2013 was the ignition point for the decision to open his own escape game in Berlin. Together with his business parter Jochen Krüger and their former geocaching crew, he opened THE ROOM on the 3rd of October 2014 after a year of planing and six months of building. Their first two rooms, GO WEST and THE BEAST OF BERLIN were more successful than they ever imagined and the business quickly grew to a point where a third room made sense. The goal with the third room was to create something groundbreaking in terms of set design and technical equipment, thus the team was expanded to include Malte Eiben, who is responsible for programming, and Wilko Drews, with whom Chris designed HUMBOLDT, or THE LOST TREASURE as it is known today. After 8 months of building, THE LOST TREASURE opened to the public in November 2015 and has been extremely well received with many very positive reviews from both new and experienced players. End of 2018 THE ROOM opened BRANDON DARKMOOR. A one of its kind immersive adventure.
Affiliated Rooms: 3
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Ranked Rooms: 20 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Geldrausch - 66 Minuten (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 100
Jan is an adventure blogger on https://www.lebegeil.de and reaches more than 130,000 users per month with his articles about escape rooms, adrenaline activities and adventure travel. To date, Jan has played more than 100 escape rooms around the world. With his marketing agency lebegeil media he helps escape room owners to get more bookings via Facebook Ads and Google Ads.
Affiliated Rooms: 4
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Da Vinci Code - ROOM Escape Room (Switzerland)
  • House of Ghosts - ROOM Escape Room (Switzerland)
  • In Search of Gulliver - ROOM Escape Room (Switzerland)
Ranked Rooms: 9 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Alien: The Origin - Escape Barcelona (Spain)
Rooms Played: 61
I‘m a huge fan of Escape Rooms and live in Germany. With my husband and some friends I‘ve played over 60 Games in different Cities in Germany, UK (1) and USA (2).
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 63
I’m Marie from Berlin, Germany and I’ve played 60 Escape Rooms so far. Most of them in in Germany but I’m looking forward to change that as soon as possible. I’m also a game master at Final Escape in Berlin.
Affiliated Rooms: 2
  • Last Human / Trabi Race 2030 - Final Escape (Germany)
  • The Puppeteer - Final Escape (Germany)
Ranked Rooms: 8 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
Rooms Played: 54
4 years ago I started working for an Escape Game in Berlin beside my studies. What started as as sideline with a pinch of scepticism became a real passion for me. By now I'm fully employed at THE ROOM - Live Escape Game Berlin as a team leader with construction and maintenance duties and I'm eager to learn new skills in electro installations and game design. I love to play story driven adventures and immerse into strange worlds.
Affiliated Rooms: 4
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Ranked Rooms: 11 (sorted by location)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Executioner - House of Tales (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • The End - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
Rooms Played: 200
Ryan Rosin from Berlin Germany is an enthusiast since 2018. He played most of his rooms in his hometown, but also played a few rooms in the US, Spain, Czech Republic. In 2020 he played 150+ rooms online all across the world and became moderator of the biggest german Facebook group Escape Roomers (DE).
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Vanishing Act - Locurio (United States)
Rooms Played: 70
Just love to escape :)
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 211
Sebastian has played over 210 rooms and is the founder of Escape-Maniac.com Germany’s oldest and biggest Escape Room Blog. He is not only focused about rooms in germany, also in rooms in the neighborhood countries.
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Geldrausch - 66 Minuten (Germany)
  • Neptune's Curse - Hidden Games (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
Rooms Played: 84
Eleonore has worked in an Escape Room for two and a half years now and played more than 80 Rooms and some Outdoor Escape Games since then (most of them in Germany, one in France and four in Holland).
Affiliated Rooms: 1
  • The Alley - Rätselraum Ruhrpott (Germany)
Ranked Rooms: 12 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
Rooms Played: 127
Founder of Rätselraum Ruhrpott in Bochum, Germany: www.raetselraum.de and head of the German Escaperoom Association (LEAG)
Affiliated Rooms: 1
  • The Alley - Rätselraum Ruhrpott (Germany)
Ranked Rooms: 24 (sorted by location)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 104
Local search & seo evangelist. Played >100 rooms across europe. co-owner of TIMEBREAK (www.timebreak-bonn.de)
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Geldrausch - 66 Minuten (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 106
Enthusiast since 5 years. Played around 105-110 games. Manager of an escape room store in cologne. Love the community!
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Geldrausch - 66 Minuten (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 101
I'm a Software developer from Germany, who played his first Room in 2016. I've played most rooms as a group of four and 15 rooms with my girlfriend only.
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 252
My name is Christoph, i play Room in Germany, Spain, Austria, Suiss and Czech Republic.
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 54
Being addicted since 2016, when i played Sherlocked at Komnata New York the first time. Hunting to play the best rooms in the world is my passion. Specialized in playing rooms with only one teammate and focused on ultra realistic games. I'm technically trained and don't like doing things by halves.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
Rooms Played: 70
I play on regular basis Escape rooms, live and online.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
Rooms Played: 127
29yrs female, speech therapist and escape room enthusiast. Loved riddles my whole life
Affiliated Rooms: 1
  • The Alley - Rätselraum Ruhrpott (Germany)
Ranked Rooms: 19 (sorted by location)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 96
I have been playing ERs since 2016 in Germany and France. During this time I played 96 different rooms. I only play ‘real‘ ERs (I don‘t enjoy virtual reality or online games).
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 63
I am looking forward to finally play escape rooms again, I really miss it during this corona times.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
Rooms Played: 112
Hi there! As Location Manager at Rätselraum Ruhrpott in Bochum I’m an Escape Room Enthusiast to the core! Throughout the last couple of years Escape Rooms developed to be my No. 1 leisure activity and right now I believe it is going to stay that way until I’m gray and old!
Affiliated Rooms: 1
  • The Alley - Rätselraum Ruhrpott (Germany)
Ranked Rooms: 18 (sorted by location)
  • Submarine Bunker - Escape Rush (Belgium)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 220
Hello! I‘m Henrik from Frankfurt, Germany! I am a big Escape Room Fan and Plan to visit all the Countries in the World - 2 things that go great together 😁
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Race against Time - Insight Out (Lithuania)
Rooms Played: 75
Owner of TeamBreakout Games & The Code Agency
Affiliated Rooms: 2
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
Ranked Rooms: 16 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
Rooms Played: 256
I'm an escape room enthusiast since I've played the first rooms in 2016 and since then a lot had happend: I've travelled to escape, helped building the rooms of X-it-ADVENTURES and became a moderator of the Escape Roomers-Facebook Group. I still can't believe this amount, but due to Corona I played over 230 rooms, in person and online.
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Submarine Bunker - Escape Rush (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • Geldrausch - 66 Minuten (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 80
Stand-up Comedian, Actor & Author, escape room creator. Since 2015 I am running a self created escape Room in Bielefeld/Germany. (www.x-it-adventures.de)
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • Geldrausch - 66 Minuten (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 110
My name Is Friederike and as an escaperoom enthusiast I played my number 100 escaperoom right before the actual Lockdown. Together with Jan I Play in the team “letscape” and experienced rooms in the Netherlands, Germany, Switzerland, Sweden, Norway, Czech Republic, Great Britain, Hungary. And additionally some remote games in the US, Lithuania, Canada and Austria, Ukrain.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
Rooms Played: 110
My name is Jan. I am 33 years old and played more than 100 escaperooms together with Friederike in the Team letscape.
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
Rooms Played: 90
I'm Donna, an American living in Europe. I was introduced to the Escape Industry nearly 5 years ago when I joined a few friends and helped to open and operate a successful escape game business. I have moved on from being a part-owner and now run a charity which aims to promote socially conscious gaming which gives to the needy.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
Rooms Played: 130
I am one of the owners of Big Break Hamburg and am a big Escape Game Enthusiast
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Alien: The Origin - Escape Barcelona (Spain)
Rooms Played: 85
I am escaping since 5 years. Have around 80-90 rooms played in Germany and United Kingdom. Plans for next year are Netherlands and Greece. Heiner Stepen from Germany can tell you that I played that amount of Escape Rooms.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • Geldrausch - 66 Minuten (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 100
I own Mysteria Escape in Obernkirchen together with my partner Dirk Bergmann. Together we have played over 100 games worldwide.
Affiliated Rooms: 0
Ranked Rooms: 30 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Until Dawn - La Clau (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
Rooms Played: 60
Born in 1976 in Stuttgart I was always a fan of games, riddles and brain teasers. Now working as a teacher I became addicted to escape rooms and play them whenever it is possible.
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 70
I am working for "66 Minuten" in Neuwied in Germany since two and a half years. As the "head of tinkering", I am involved in planning, at the construction and maintenance of espace rooms. Since my employment at "66 Minuten" I am also a gamemaster and an enthusiastic gamer.
Affiliated Rooms: 2
  • Geldrausch - 66 Minuten (Germany)
  • The Trophy Collector - 66 Minuten (Germany)
Ranked Rooms: 23 (sorted by location)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Woman in Black - Coven Escape Rooms (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Don't Take a Breath - Verone (Greece)
  • The End - DarkPark (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 110
My name is Hanna Klein and i played more than 100 Escape Rooms in Germany, Czech, the Netherlands and Italy.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Geldrausch - 66 Minuten (Germany)
  • The Executioner - House of Tales (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
Rooms Played: 130
Dirk Bergmann has played over 120 Escape Rooms in Europe and the USA and some online rooms. He is the owner of Mysteria Escape in Obernkirchen, Germany. www.mysteria-escape.de
Affiliated Rooms: 1
  • The Secret of the Bermuda Triangle - Mysteria Escape Live Adventures (Germany)
Ranked Rooms: 29 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Below Zero - Escapem (Spain)
  • Catacombs - Golden Pop (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
Rooms Played: 120
I'm a member of the EscapeRoomers.de team, with roughly 125 rooms played. I design my own online escape games at Edaqa's Room: https://edaqasroom.com/
Affiliated Rooms: 0
Ranked Rooms: 3 (sorted by location)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
Rooms Played: 1107
I haven't been everywhere, but it's on my list! Heiner is an enthusiast and escape traveler since 2014. He’s running the Facebook community Escape Roomers De (https://www.facebook.com/groups/EscapeRoomersDE/) and the blog escaperoomers.de which are covering Germany and Europe. He played more than 800 live escape games and almost 300 remote escape games in many different countries. In 2019 he won the Swiss escape room championship.
Affiliated Rooms: 0
Ranked Rooms: 119 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Submarine Bunker - Escape Rush (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • Geldrausch - 66 Minuten (Germany)
  • Neptune's Curse - Hidden Games (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 95
I love escaperooms, escapegames and puzzles of all kinds, but also geocaching. Mostly I play in a team with my partner and friends. I have already played almost 70 rooms, mostly in my extended Homzone.
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 60
I am an avid and passionate escape room player. The positive side of Corona is that I got to play some fantastic online rooms in exotic locations,
Affiliated Rooms: 0
Ranked Rooms: 2 (sorted by location)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 53
Playing escape rooms just since the beginning of the year, it turned into a kind of obsecion in a positive kind of way-
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • Wake Up - Station 33 (Greece)
Rooms Played: 150
Malte is one of the writers of Germany's largest escape room Blog escape-maniac.com. He is always looking for immersive escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 36 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Geldrausch - 66 Minuten (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Don't Take a Breath - Verone (Greece)
  • Secret Subway - E-Exit (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 202
Www.66minuten.de
Affiliated Rooms: 2
  • Geldrausch - 66 Minuten (Germany)
  • The Trophy Collector - 66 Minuten (Germany)
Ranked Rooms: 36 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Woman in Black - Coven Escape Rooms (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Don't Take a Breath - Verone (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 55
I have played over 50 escape Rooms all over Germany and I managed most of them.
Affiliated Rooms: 0
Ranked Rooms: 1 (sorted by location)
  • Geldrausch - 66 Minuten (Germany)
Rooms Played: 189
Anna is an enthusiast which played about 160 rooms mainly in Germany and some in Czech Republic, the Netherlands and the US. She is also playing online remote rooms which ad up to about 30 rooms now.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
Rooms Played: 110
I am Bianca, 31 years old and I have played escape rooms in Europa, Asia and the Americas.
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 110
Played more than 100 games in Germany, Netherland, Prague, Greek,.. I am part of the Organisation Team 66 Minuten - Theater Adventures Neuwied. I produced a lot of Media Content and clues, electronic, Sounds and Effects. I like an immersive ER with good role play.
Affiliated Rooms: 2
  • Geldrausch - 66 Minuten (Germany)
  • The Trophy Collector - 66 Minuten (Germany)
Ranked Rooms: 15 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Executioner - House of Tales (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 102
creator of the "EXIT - The Game" board games from KOSMOS https://store.thamesandkosmos.com/collections/exit-the-game
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 250
Escape room owner. Played Around 300 rooms
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 56
I'm 50 years old and live in North Rhine Westphalia near Cologne. Neither do I work in ER business, nor do I run a website. I just love to play Escape Rooms. Usually in a group of 4, including my wife and two other very good friends. In my opinion Germany's ER are often underrated or rather going short, that's why it is important for me to take part in this survey.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
Rooms Played: 220
Julia Ivancenco has played 189 rooms in 13 countries and 33 live video games around the world. She runs her own escape games in a small town in Germany (www.harz-escape.de)
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • Geldrausch - 66 Minuten (Germany)
  • Neptune's Curse - Hidden Games (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 72
German escape room enthusiast/ addict and since the end of 2019 founder & owner of TIMEBREAK Bonn (https://www.timebreak-bonn.de). Played 70+ rooms in Germany, Belgium and the Netherlands so far.
Affiliated Rooms: 1
  • Yarrum's Magic Hut - Timebreak (Germany)
Ranked Rooms: 21 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Geldrausch - 66 Minuten (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 60
I am a member of the Suicide Squad escape team and I used to play with other friends and friendly escape teams. I have already played 60 er. I love rooms with riddles, creepy and light horror atmosphere rooms.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
Rooms Played: 150
Electrical engineering Student (NTUA, Athens) Escape Rooms enthusiast (150+)
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 308
Anna is an escape room enthusiast from Greece. She has played over 300 E.Rs (all in Athens GR except one in Rome IT) and will keep playing because she loves it !
Affiliated Rooms: 0
Ranked Rooms: 30 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 250
I am escape room enthusiast from Athens, Greece since 2016. I have played 240 escape room and look forward for more! Member of Ebola Team. Web Page: https://ebola-escape-team.webnode.gr/ Facebook Page : https://m.facebook.com/ebolaescapeteam/?ref=m_notif&notif_t=page_post_reaction Instagram Page : https://www.instagram.com/ebola_esc_team/?utm_source=ig_profile_share&igshid=1m2jpbhiotfx0
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 200
I have been a player since 2016, my team is called Drill Team and I have played about 200 rooms. It's a fun way to use your mind and body and I do not change it!
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 300
I'm playing escape rooms since 2015, I love puzzles but also go to horror rooms to live a different reality. My team is the Suicide Squad-escapers and you can find our reviews and photo gallery to our Facebook page. Escape rooms have no limits, just play.
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 120
I m an escape room enthusiast with experience of 120 rooms. I m also escape room designer and owner of Clock escape rooms in Athens
Affiliated Rooms: 1
  • Rebellion - Clock Escape Rooms (Greece)
Ranked Rooms: 11 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 280
Greek Escape Room Enthusiast Co-Creator of Paradox Project
Affiliated Rooms: 3
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
Ranked Rooms: 21 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 326
I am an escape room player from Greece. I have played 326 rooms in Athens, Amsterdam, Bulgaria, Prague, Munich and Italy. I started playing escape rooms from 2014 and i instantly fell in love with that kind of entertainment! Meanwhile i became a coordinator in a Facebook group called "❤️4 escape rooms"
Affiliated Rooms: 1
  • Rebellion - Clock Escape Rooms (Greece)
Ranked Rooms: 30 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 100
I am an escape room enthusiast since 2017 and I have played more than 100 games. I own an escape room in Greece .
Affiliated Rooms: 1
  • Red Riding Hood - The Mind Hunters (Greece)
Ranked Rooms: 17 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 312
At first I am an escape room enthusiasts. Then I'm owner of escape rooms in Athens since January of 2015. I have played over 300 rooms and I like them all!
Affiliated Rooms: 3
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Room 202: Paranoic II - Escaped (Greece)
Ranked Rooms: 21 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 212
Escape Room Enthusiast. I have played around 210 rooms since 2015.
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 201
Played over 200 escape rooms by Oct 2020, Owner of Escapepolis Athens in Greece, Designer and Concept Visualiser of Cosmos 05-Death in space escape room and many more. Above all Dreamer. Our team has created over 10 different themes including the Rooms Avissos, Tyranny, Roswell 1947, Creepy Store, DARK Mirror, Hellevator the 70th Floor, The Butcher, Gustave Eiffel a view to die for and more...
Affiliated Rooms: 3
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Roswell 1947 - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
Ranked Rooms: 21 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 220
I am Giannis Ioakimidis from Athens, Greece. Escape room enthusiast since 2015. Have played over 200 rooms.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 139
I am an escape room enthusiast with 139 rooms experience based on Greece and recently a co-owner of an escape room company in Greece, Escapepolis Galatsi
Affiliated Rooms: 3
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Roswell 1947 - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
Ranked Rooms: 23 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 333
Escape room addict
Affiliated Rooms: 0
Ranked Rooms: 28 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 289
I'm Kostas, 31y/o.Currently working in IT industry. I've been playing ER since 2013. Also participated in Scare Acting Seminars by Thodoris Eleftheriadis in 2020.
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 207
Escaper since they first started in Athens. Always up for a tough riddle.
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 145
My name is Maria and I am an escape room aficionado. I started playing escape rooms when they were only three escape rooms in Athens, Greece. I was actually dreaming of escape rooms coming to life. When I was in college I presented an essay in public speaking about murder mysteries, as they were called at the time, the prequel to escape rooms. I usually play in a team of four, along with my husband and another couple. 3 years ago we traveled to Budapest, Hungary for three days packed with escape room experiences. I have also been to escape rooms in London, Edinburgh, Stockholm and USA and I can strongly advocate that the Greek escape rooms are my favorite ones, regarding both riddles and atmosphere. I love escape rooms and every year on my birthday I play three escape rooms as a great birthday gift.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 71
Living in Athens and love escaping
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
Rooms Played: 333
Escapeaholic from Greece, only 4 greek ERs left to play. gonna catch them all!
Affiliated Rooms: 1
  • Rebellion - Clock Escape Rooms (Greece)
Ranked Rooms: 27 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 50
Just an escape room enthusiast. Play for fun with my teammates. Experience 50+ rooms.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Mine Box - The Box (Greece) (Greece)
Rooms Played: 308
I am a farmer, 46 years old, married with 2 kids and I have played more than 300 ER games all of them in Greece. All 4 members of my family are escapers !
Affiliated Rooms: 0
Ranked Rooms: 30 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 351
I played my first escape room on February 2015. Since then I have played 346 escape rooms only in Greece. I have my own escape team named Alytes and I fully love this kind of hobby.
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 248
Escaper, administrator of greek group for Escape Rooms (Drapetes)
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 305
Nikol has been a passionate enthusiast for about 5 years and also works as a game master. She enjoys all kinds of escape rooms, both horror and not, virtual reality and online. She has played rooms in 4 different countries until today.
Affiliated Rooms: 0
Ranked Rooms: 28 (sorted by location)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 123
Avid escape room enthusiast, player, and designer. Don't much care for horror but love a creepy atmosphere and good riddles.
Affiliated Rooms: 1
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
Ranked Rooms: 18 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
Rooms Played: 173
My first escape room experience was in 2014 and I have since 173 escape rooms, most of them in Athens
Affiliated Rooms: 0
Ranked Rooms: 24 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 273
I believe that since march of 2015 that i started playing ers every time that i walk in a room its like the first time.. the same heartbeat and i am trying to use all my sences to be a part of the game.. its the time that i am not playing but i am living the concept.. i love it!
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 432
Escape room enthusiast! A passion that will never end! I see riddles everywhere, even not playing escape room! Love them! Live for them! :)
Affiliated Rooms: 2
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
Ranked Rooms: 29 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 300
I love escape room 😍😍😍😍 i have played over 300 rooms.
Affiliated Rooms: 1
  • Wake Up - Station 33 (Greece)
Ranked Rooms: 26 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 120
Playing escape rooms is wonderful. It's an alternative experience. Solving riddles is really fun. I really prefer riddle based rooms.
Affiliated Rooms: 1
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
Ranked Rooms: 16 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
Rooms Played: 120
ER enthusiast. Author of "Clue Story" - Interactive novels with riddles.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 308
Paul has played 308 rooms and really loves playing ERs. He was the co-owner of Cryptogram Escape Rooms in Athens, Greece. He is creator-designer of escape rooms and director of acting when the room includes live performance. He worked as manager, GM and actor in many companies in Athens, Greece. He has a YouTube channel called DarkTales that its main purpose is to show the world that is not concerned what an escape room is. They create interviews with the owners of companies and people that play ERs and make a fully detailed video of its company with its rooms. They are on Facebook as DarkTalesChannel. His goal now is to go around the world and played as many rooms as he can and make videos from this experience. His favourite moment in an escape room is when they solve a riddle or a puzzle. That's why his best escape rooms in Athens is Paradox Project 2 & Paradox Project 3.
Affiliated Rooms: 0
Ranked Rooms: 28 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 75
Petros Adamopoulos has played 75 rooms across 4 countries. He loves riddles and puzzles, tries to avoid rooms with live acting and stays clear of horror and jump scares!
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
Rooms Played: 209
I am the owner at the ESC ROOMS company in Athens which is active in the area of ​​escape rooms since March 2015 I have played over 200 rooms from 2013 until today and it is my main way of having fun
Affiliated Rooms: 1
  • Another Dimension - Esc Rooms (Greece)
Ranked Rooms: 9 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 59
Player since 2015!! I love thematic rooms with riddles and nice sceneries!! I am also owner of No Escape Escape Rooms in Athens, since 2017!!
Affiliated Rooms: 1
  • Katharsis - Caves of Banjul - No Escape (Greece)
Ranked Rooms: 14 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 250
I am escape room addict from Greece. I have played about 240 rooms since 2016. I am also runner up in the 1st Greek Escape Room Championship 2018. My official Escape Room Facebook Page: https://m.facebook.com/ebolaescapeteam/?ref=m_notif&notif_t=page_post_reaction Web Page(Requires Update): https://ebola-escape-team.webnode.gr/ Instagram: https://www.instagram.com/ebola_esc_team/?utm_source=ig_profile_share&igshid=1m2jpbhiotfx0
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 231
Game master-designer at Mystery Lab for 4 years / Player for 6 years / Former pirate
Affiliated Rooms: 1
  • Requiem - Mysterylab (Greece)
Ranked Rooms: 21 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 54
I am a enthusiastic player of more than 50 rooms
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 333
Addicted to escape rooms
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 176
I am an experienced escape room player,actress and creator. I 'm very excited as a person and love to solve riddles and completing tasks with my team.
Affiliated Rooms: 0
Ranked Rooms: 24 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 70
I am 22 years old I have played around 100 rooms andhave worked as a GM for about a year
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 69
Player at least 3 years
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • El Exorcista - No Exit (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 52
I'm a kindergarten teacher and I love playing escape rooms with my team "No Padlock Remained". Also, I work as a game master in a escape room company.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 165
Game master, actor, escape room enthusiast.
Affiliated Rooms: 1
  • Katharsis - Caves of Banjul - No Escape (Greece)
Ranked Rooms: 21 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 63
I'm an escape room player and enthusiast.
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 110
Hello. My name is Dora and i am from Greece. One of favourite hobbies is visiting escapes rooms. I have played more than 100 er. I am here as i believe that Greece has many excellent escape rooms and i would like to vote for them.
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 170
Hello!! I am a member of the escape team 3μ3Ψ. I love escape rooms as everyone here and I have been playing since 2016. That's all folks. Keep escaping!
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 320
I love escape room!I have played 320 rooms in greece
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 270
I’m 21 years old. From Greece. I have been playing escape rooms for 4 years and I believe that it’s by far the best hobby ever.
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 151
I m a 39year old woman from Greece, playing escape rooms the last 2 years...Almost 150 and keep going for the 200!!! I d love to be a member of your community and help other players choose ....
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 65
Escape gamer.
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 193
The first escape room that i played was in November 30th 2018. I still remember that day, how amazing it was and it was then when i fell in love with this hobby. After that day i managed to play over a 100 escape room in just a few months, I played at least 6 a week, it was like an addiction to me and my friends. Many times i thought of working as a Game Master or an actress but, then i wouldn;t have time to play as many escape rooms i wanted. I love all kinds of escape room and it's a hobby that i hope it will last forever.
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 250
I am an escape room enthusiast from Athens, Greece! Its a part of my life and i have a lot of fun playing escape rooms! I have played 240 rooms and counting!
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 203
Hi there dear escapers! I play escape rooms from 2014. My first room was Prison Break. At 2018 me and my friends build our own escape room named The Prison.
Affiliated Rooms: 1
  • The Prison - Adventure Arena (Greece)
Ranked Rooms: 14 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 160
I have played more than 160 rooms in Greece and I love all kinds of escape rooms!
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 195
I am the owner of The Darkwood Village. Our company has two rooms Mrs Rose's House and Dark.
Affiliated Rooms: 1
  • Mrs. Rose's House - The Darkwood Village (Greece)
Ranked Rooms: 18 (sorted by location)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 230
I am a Lawyer since 2015, a dancer since 1994 and Escape room addict since 2017. I've played almost 230 escape rooms! I'm 29 years old, from Piraeus, Greece!
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • Requiem - Mysterylab (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 200
over 200 rooms
Affiliated Rooms: 0
Ranked Rooms: 28 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
Rooms Played: 262
My name is Stefanos Rizinos, i have a degree in business management and currently i work in a private company. I am the founder - owner of tamavroskyla.gr, The first and most popular Escape Room lifestyle website in Greece. I played in 262 Escape Rooms so far, and i created 200+ riddles/quizzes.
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
Rooms Played: 87
Mark Noone has played 87 rooms across 3 continents and 8 countries. He plays most rooms in a group of 2 with his fiancé Jessica. They are hoping to do a lot more rooms next year with the difficulties this year presented.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Boda Borg - Boda Borg (United States)
Rooms Played: 412
Played 412 Escape Rooms: 398 in Israel and 14 in Greece.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Rooms Played: 497
Avid Escape room player. Played over 495 rooms. 3 in the US, all the others in Israel.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Prophecy - My Real Quest (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Rooms Played: 638
Escape Room Enthusiast Since 2015, Escape Room Owner Since 2017. Since they've played most of the rooms in Israel, they are trying to visit as many countries as possible (mostly Europe) looking for the best escape rooms to play. They are also a Software developer and among other work have created many cool things for escape rooms (mode details, including minor spoilers, can be found on their channel, https://www.youtube.com/channel/UCYt07RhAGlTyqJ1UBxU44zA)
Affiliated Rooms: 0
Ranked Rooms: 49 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Beast of Berlin - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Prophecy - My Real Quest (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cursed Island - Escape Project (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 761
Ron has played 761 games in 15 countries since late 2015, making him the leading most experienced player out of Israel. In 2016 he co-designed and co-created an escape game in Israel, and kept being heavily involved in the Israeli escape room industry ever since, consulting and helping create many different experiences in the escape room space.
Affiliated Rooms: 0
Ranked Rooms: 51 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Prophecy - My Real Quest (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cursed Island - Escape Project (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 720
Gai Bosco is a Gamification expert and enthusiast, who has created over 150 real life gaming experiences for organizations, museums, television shows, and more. As an enthusiast he has played in over 700 ERs all over the world. He studies the ER market and trends and is a speaker in international escape room conferences.
Affiliated Rooms: 13
  • Grease - Amazon Escape (Israel)
  • Hansel and Gretel - Amazon Escape (Israel)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • The Six - Hype Esc (Israel)
  • Gulliver's Travels - Sherlocked Israel (Israel)
  • The Wizard of Oz - Sherlocked Israel (Israel)
  • The Puppets: Silent Diving - Show Time (Israel)
  • The Puppets: Silent Photographers - Show Time (Israel)
  • Action! - The Maze (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Ranked Rooms: 34 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Rebellion - Clock Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • The Vikings - Escape Sign (Israel)
  • Prophecy - My Real Quest (Israel)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 450
Hey, I’m an escape room developer from Israel. I’ve played over 450 rooms in Israel and around the world, and big fan of your concept!
Affiliated Rooms: 1
  • Hollywood 117 - Hype Esc (Israel)
Ranked Rooms: 17 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • White Mission - Gozsdu Mission (Hungary)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Prophecy - My Real Quest (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 133
Looking for new ways to escape and new countries to explore.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • The Intervention - Escape Center (Israel)
  • The Vikings - Escape Sign (Israel)
  • Prophecy - My Real Quest (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Rooms Played: 135
Escaper from Israel. One of the owners of "Action!" Escape Room from Israel
Affiliated Rooms: 2
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Ranked Rooms: 5 (sorted by location)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Prophecy - My Real Quest (Israel)
Rooms Played: 271
Eat. Sleep. Escape. Repeat!
Affiliated Rooms: 2
  • Eurovision Pizza Party - Panica Escape (Israel)
  • The Hummus King - Panica Escape (Israel)
Ranked Rooms: 0 (sorted by location)
Rooms Played: 142
Funny guy. Loves to smile and help people.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Rooms Played: 203
An enthusiastic escaper, have played over 200 escape room worldwide.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Prophecy - My Real Quest (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Rooms Played: 580
Hadar has played over 580 rooms, almost all of Israel's rooms, as well as ~100 rooms in Europe and a few in the US
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Prophecy - My Real Quest (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
  • The Storykeeper - Locurio (United States)
Rooms Played: 200
Iliya has played over 200 rooms, most of them in Israel. They have also been on escape rooms vacations to Moscow, Kiev and Sofia.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • BlueLab - Endorphin Games (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • Hollywood 117 - Hype Esc (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Rooms Played: 105
30 years old Data Scientist from Tel-Aviv. Avid Escaper
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
Rooms Played: 109
Liran started his addiction in December 2017 with three friends, and since then has played over 100 rooms, all of them in Israel. They play each month in 4 rooms at least.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The Vikings - Escape Sign (Israel)
  • Prophecy - My Real Quest (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Rooms Played: 360
Only 340 rooms so far but they're still young
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • The Intervention - Escape Center (Israel)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • Cube - The Maze (Israel)
  • The Sting - The Maze (Israel)
Rooms Played: 80
Discovered the ER in April 2014 and get addicted to them immediately. Opened the first multi room in Apulia (south Italy) in 2015. In 2020 I opened Bruum Escape, a company that focus on mobile escape room experiences like a live game on a trailer and, due to covid, an online experience with live avatar. I've played around 80 rooms around Italy, Ireland, Usa, Dubai, Holland, Spain, Germany and other countries.
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • Go West - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Interview - Cubick (Spain)
Rooms Played: 100
Zi Yang has played over 100 escape rooms, mainly in Asia and Oceania, and hopes to see more representation from these regions. He is the co-owner of the LOST in JB escape rooms (https://lostinjb.com/en), an operator that also has franchises in Singapore and Australia.
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 90
Director & Co-Founder of Sherlocked in Amsterdam. Played around 90 games so far. Fan of immersion and adventure.
Affiliated Rooms: 1
  • The Vault - Sherlocked Netherlands (Netherlands)
Ranked Rooms: 21 (sorted by location)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • The Clock Tower - Escape The Room (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Stash House - Stash House (United States)
Rooms Played: 144
Big escape enthousiast. Played more then 150 rooms mainly in the Netherlands
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 200
Marloes has played 200 rooms, mostly in the Netherlands, but also in Czech, America, Bulgary, France, Belgium and Germany. She's also an enthusiast when it comes to escape room games at home. She loves to talk and write about experiences, mostly on escapetalk.nl and sometimes www.want2escape.be.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
Rooms Played: 72
I am Eline, 27 years old and I love escape rooms! About 4 years ago I played the first and now the counter is at about 70. I enjoy the anticipation, the puzzles, the decoration, the endless chats, etc.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 72
Hi, my name is Marc Verhagen and I've played more than 70 escape rooms at the moment. Let's say a hobby that got out of hand, but great fun! :)
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 51
Teacher, foodie & escape addict
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 63
Done over 50 physical rooms, some online and various other escape games. Also built some for friends and family
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
Rooms Played: 81
Escape addict, psychologist and co-founder of Township Escape in the Netherlands.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 113
Keeping up with the release of top notch escape games in The Netherlands, I've also played some amazing games in Berlin, Prague, Budapest and Hamburg. Things I love to see in a room: a developing storyline, an immersive experience and a lot of teamwork. Things I don't like in a room: puzzles that do not fit the story, darkness as a handicap and splitting a team without equal workloads.
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 315
Founder of biggest and most complete escape room platform Escape Rooms Netherlands. I played more than 300 escape rooms. Founder & Marketeer at Online Boswachters. I help companies grow their business. I create mobile immersive experiences for clients like Damco, Shell, RIVM as well. I love to share my experiences on events like Up The Game. I design and make games. I live games. I am game in creating unforgettable experiences. I am the owner of Team Undercover and Circus Pief Paf.
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 206
39 years old escaperoom player. Working in IT. Played 206 rooms in the Netherlands, Belgium, Lithuania and Latvia
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 55
Escaperoom Enthousiast and Owner. Love playing and building. ;)
Affiliated Rooms: 1
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
Ranked Rooms: 8 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 64
Yentl is an project organiser who has played 63 escape rooms in 6 countries (plus one online escape room with host). She also works in one escape rooms in Leiden, the Netherlands: Mayflower Escaperoom in the Pieterskerk. With my own company I always try to incorporate an escape room in the program that I design for my guests.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 69
Escape room junkie
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 141
Andrea was introduced to escape rooms about four years ago, together with her boyfriend, by some good friends of theirs. Since then they have been playing regularly, mostly in The Netherlands, but also when travelling abroad. They have even made a few dedicated escape room trips together with their friends (e.g. to Hamburg and Paris and Barcelona). She especially likes rooms with a good storyline and eye for detail - and is not a big fan of gory horror rooms.
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • L.A. Confidential - Lock Academy (France)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Freakshow - Break The Brain (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Roomanji - Ilusium (Spain)
  • The Mine - Unreal Room Escape (Spain)
Rooms Played: 64
Stefan has designed multiple rooms in the Netherlands
Affiliated Rooms: 1
  • The Ram Raid - ROX Escape Experience (formerly Project Escape) (Netherlands)
Ranked Rooms: 8 (sorted by location)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 174
Ever since playing my first escape room in february 2015, I've been totally hooked. I've played more than 170 escape rooms, some during escape trips abroad. I've played with many different friends, family members and colleagues. When I'm not out escaping, I often play a home escape game or escape app as well.
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cursed Island - Escape Project (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 100
Escaperoom fan sinds 2017. Played over a 100 rooms and still counting.
Affiliated Rooms: 1
  • Bella Ciao - Escape Game Katwijk (Netherlands)
Ranked Rooms: 13 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 102
Owner, Escape Room Katwijk🔑 Fanatic Escape Room Player🧩
Affiliated Rooms: 1
  • Bella Ciao - Escape Game Katwijk (Netherlands)
Ranked Rooms: 13 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 370
Addict player like practically everybody else on this site. Originally from Uruguay and living in the Netherlands. Played in 11 countries (Europe and South America). Organizer of the MeetUp Group: Escape rooms, offline team adventures in the Netherlands, Admin of Escape Room Enthusiasts NL, BE in Facebook, Top reviewer and honorary article writer for escapetalk.nl, Moderator and reviewer of Escape Roomers (DE).
Affiliated Rooms: 0
Ranked Rooms: 79 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Submarine Bunker - Escape Rush (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • The Order Of Light - Brain Cells (Greece)
  • Rebellion - Clock Escape Rooms (Greece)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • Another Dimension - Esc Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Room 201: Immortal - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Wake Up - Station 33 (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Red Riding Hood - The Mind Hunters (Greece)
  • Experimentum X - Trapped (Greece) (Greece)
  • Don't Take a Breath - Verone (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
Rooms Played: 260
I am Tim, 33 years old and owner of The escape room Rijswijk. I have played a lot of escape rooms in The Netherlands with our creative teams. We have 4 escape rooms.
Affiliated Rooms: 2
  • Jason's Curse - The Escape Room Rijswijk (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Ranked Rooms: 17 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 150
Escape room expert from Rijswijk. Played over 150 rooms. Involved in creating (online and offline) games.
Affiliated Rooms: 2
  • Jason's Curse - The Escape Room Rijswijk (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Ranked Rooms: 14 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 129
I played my first room in 2015, but in 2017 the addiction really started. Have played more than a hundred rooms since then, and the wishlist keeps on growing. Avid reviewer at escapetalk.nl and love talking about escape rooms... and playing them of course!
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
Rooms Played: 126
Played over 100 escape rooms! And hope that there will be many more
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 58
I love to play escaperooms! I have even put it in my Curriculum Vitae! Whether it's 1.0, 2.0 or 3.0, if an owner puts in love and dedication it always shows and that's when you get the best experience. All my visited escaperooms with verdict are displayed on my only public album on Facebook.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 147
Pim Arts has played about 150 rooms (two beautiful little kids don't help getting those numbers up) and runs escapetalk.nl, an escape room enthusiast platform serving The Netherlands, Belgium, and Luxembourg.
Affiliated Rooms: 1
  • Room 237 - Kamer 237 (Netherlands)
Ranked Rooms: 16 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 300
A enthusiast of the first hour, played his first game when there where only 2 in the Netherlands. Loves Sushi and cuddling brown bears.
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 127
25 y/o girl from the Netherlands. Crazy addicted to escape games! I play to create & create to play <3
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Battle for Britain - Escape Plan (United Kingdom)
Rooms Played: 61
Escape room enthousiast and builder/owner of flight 815, The Cooper Case and Molly's Game from Down the Hatch
Affiliated Rooms: 3
  • Flight 815 - Down the Hatch (Netherlands)
  • Molly's Game - Down the Hatch (Netherlands)
  • The Cooper Case - Down the Hatch (Netherlands)
Ranked Rooms: 11 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 54
Played my first room in 2015 and my hobby grew to playing now at least one room every month. I play with friends and family with a group of four or just with my boyfriend. I enjoy extensive rooms with a story and ambiance which includes a big variation of puzzles and games.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 75
Escaperoom enthusiast who has played over 75 rooms, mostly with our team of 4 called OLTM
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Clock Tower - Escape The Room (United States)
Rooms Played: 250
As an escaperoom owner and builder, I helped many escaperooms to improve. Together strong is in what I believe! Storytelling is my speciality. A perfect room according me is a correct story with the challenges blending in the story, correct sound effects & a build-up so the experience brings the people into the story. I’m over 200 escaperooms (stoped counting sorry) and love the game and collegues. Rik
Affiliated Rooms: 6
  • Molly's Game - Down the Hatch (Netherlands)
  • The Asylum Revealed - Mystery House (Netherlands)
  • The Ram Raid - ROX Escape Experience (formerly Project Escape) (Netherlands)
  • WW-II: Press Room - Team Trapped (Netherlands)
  • Jason's Curse - The Escape Room Rijswijk (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Ranked Rooms: 18 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Geldrausch - 66 Minuten (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The End - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
Rooms Played: 180
Escape room owner in the Netherlands since 2016. Also an enthusiast who has played more than 100 rooms.
Affiliated Rooms: 2
  • Jason's Curse - The Escape Room Rijswijk (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Ranked Rooms: 15 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 180
Escape room enthusiast and owner of Escape room Kamer 237 in Volkel The Netherlands
Affiliated Rooms: 1
  • Room 237 - Kamer 237 (Netherlands)
Ranked Rooms: 19 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • White Mission - Gozsdu Mission (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 70
Love to play a good escape room with our group.
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
Rooms Played: 68
Started playing rooms/experiences in 2017. Now has already played 68 rooms in Netherlands, Belgium, Germany, UK and Hong Kong. Plays at least twice each month, except The Corona-Monti’s. Already looking forward to playing in the USA and Canada in the months to come. Plays with his wife and son and several friends. Addicted? YES! Playing makes him feel alive!
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • The Blackwood Affair - Wake Up (France)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 275
New Zealand Escape Room Enthusiast
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • Zoe - Escapade Games (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
Rooms Played: 72
Maniac of adrenaline Tell me a story
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Freakshow - Break The Brain (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 102
Game master in Wyjście Awaryjne Bydgoszcz. Enthusiast who played about 100 rooms and is striving for more :)
Affiliated Rooms: 5
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Ranked Rooms: 12 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Location - TickTack (Poland)
Rooms Played: 80
I am 26 years old fan of puzzles, with over 80 visited escape rooms. Two times semi-fnalist of Poland Escape (2017, 2018) with my team "Zespół eR".
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Cursed Island - Escape Project (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
Rooms Played: 98
I like solving puzzles. I am a person who likes to work in a group, and escape rooms are a good escape from everyday life.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Freakshow - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 251
Fan of Volleyball and escape room's:)
Affiliated Rooms: 0
Ranked Rooms: 24 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 150
Member of Orka Przymierza team. Would rather spend 30' on single troubling riddle than take a clue. Current goal is to visit all rooms in Poland with as many records as possible. After that Europe awaits.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • The Plane - The Game (France) (France)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 426
Half of the team "Wypuśćcie Nas". She has visited 426 Escape Rooms since 2016. Finalist of the Poland Escape Championship in 2017. Speaker at the WroEscape Conference in Poland. Escape Rooms have become her great passion.
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 74
ER enthusiast and an owner.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 130
My name is Kaśka. I am huge fan of escape rooms. I started my journey in 2015, but highly developed in last 3 years. For now, I visited rooms in Poland and Greece. Cannot wait for more!
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 196
Every day... I work in IT. When I have some time I either try to visit some escape rooms or learn something new (languages or postgraduate studies)
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 247
I have visited 247 escape rooms since I started the adventure with them in the year 2017. I like to share my impressions and remarks on lockme.pl, where I have already submitted 242 reviews. I am also active on facebook fanpage FANI ESCAPE ROOM, which gathers Polish enthusiasts and gives them the possibility to exchange news and recommendations and organise joint visits in escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 239
I'm part of the "Instaxer" team. We did 200 room in just one year. Right now we have almost 240 room and counting... I love ERs! https://lockme.pl/pl/uzytkownik/83799/giakeap
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 125
Escape room lover, RPG, computer and board gamer, bookaholic cat lady :)
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Vampire - Exodus (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 239
Part of ER team InstaxER - after every room we take a photo with a Instax camera. We visited over 230 rooms since we started in march 2018. We also know many ER owners and employees and we thinking of opening our rooms, but we'll see what the future holds :)
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 72
I am an escape room player from Poland, I live near a city of Gdańsk. I am co-captain and cofounder of a small escape room team called Pomeranian Runaways. We travel around Poland to see as many Escape Rooms as we can. So far we also tried to participate in two escape room championships, one regional ending up in 5th place and recently ER Champs, unfortunately not qualifying to finals.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 373
Huge escape room enthusiast. Usually visiting ER’s in a duo.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 369
Huge ERs fan
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 201
Enthusiast and ex-owner of Spaced-out escape room Toruń. Has played 200 rooms in 18 countries, mostly in Poland. Loves traveling and the first thing she checks after booking plane tickets is where the best ERs are located.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • Race against Time - Insight Out (Lithuania)
  • Judgment Day - My Escape Club (Netherlands)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Asylum - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 200
My and my wife's passion for escape rooms led us to open our own company. We were doing most of the things ourselves, including scenarios and puzzles. I'm working as sysadmin/programmer and it helped me to learn how to build electronic mechanisms. Our company is now closed, but passion for escape rooms stayed.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • Race against Time - Insight Out (Lithuania)
  • Judgment Day - My Escape Club (Netherlands)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Asylum - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 93
PhD student in mathematics and escape room enthusiast. Loves when an escape room offers not only good riddles, but also a feeling of a great adventure.
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Yellow Sign - Action Escape (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 268
Enthusiast with over 260 rooms played. In love rooms that are somewhat unique and cross boundaries.
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 78
3rd place in PolandEscape 2019 contest organized by lock.me (contest now rebranded to ER CHAMP) as part of Ewarsaw Eagles team
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 50
I am a PhD student in biotechnology. Besides biology, I like math. While organizing manga and anime conventions, I met many great people with whom I discovered my love for escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 3 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
Rooms Played: 129
PhD student in Computer Science. Active competitive programmer. Member of Ewarsaw Eagles team that took 3rd place in PolandEscape 2019 (now rebranded to ER Champ). In the meantime I like playing chess and various board games.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 160
I've been visiting Escape Room games here in Poland for 5 years now. Been doing this only with my good friend as I think when going with more people might be fun you might miss alot either from the story or even whole puzzle if someone would solve it alone. At The moment I'm sitting On around 160 solved ERs, hopefully the number will go up again soon.
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 120
I have visited over 100 escape room. I am the captain o Panda Express team who won Poland Escape 2018 - Polish Escape Room Championship.
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 244
Gold medalist of ACM International Collegiate Programming Contest, PhD student in theoretical computer science. Member of team Ewarsaw Eagles that took 3rd place in PolandEscape 2019 (currently called ER Champ) and 13th in ER Champ 2020.
Affiliated Rooms: 0
Ranked Rooms: 31 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
Rooms Played: 188
I've played in almost 200 escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 158
An escape room lover. Owner of Amazeing Escape room in Poland. Two-time Polish runner-up in "escaping"
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
Rooms Played: 353
I visited the first ER in December 2016 and immediately understood that this would be my new hobby. Fortunately, my wife and children also liked to escape (the kids have visited more than 200 ER with us). Now, close to 350 ER later, me, my wife, daughter and my friend form the team "Planszoholicy" (the Boardgamesaddicts - my 2nd hobby :)) and we managed to be 3rd team in PolandEscape 2018 and 4th in PolandEscape 2019.
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 129
The creativity of many room makers is impressive - amazing scenography, story ideas and riddles woven into it all. All this makes it one of the games that I really appreciate and like. It requires me to use all my senses and engages my imagination and mind, allows me to experience adventures in the real world and spend time with people I like.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 286
I've visited 286 escape rooms. About 30 of them twice. So far, I have written over 40 opinions, I often tend to participate in the fan forum and I regularly organize ER trips for my team. I've happened to take part in game tests and sometimes I write feedback to ER owners. Visiting the ER is like an art for me. It requires me to use all my senses and engages my imagination and mind, allows me to experience adventures in the real world and spend time with people I like.
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • The Yellow Sign - Action Escape (Poland)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 53
For three years, I have been visiting escape rooms all over Poland with my homie. This is our hobby, we could never live without it.
Affiliated Rooms: 1
  • Who Is Max Winckler? - Mysterious Room (Poland)
Ranked Rooms: 10 (sorted by location)
  • Cursed Island - Escape Project (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 180
Ever since I was a child I have been an enthusiast of puzzles and riddles of all kinds. I write about puzzles and escape rooms on Facebook: https://www.facebook.com/zagadkowcy. I love inventing puzzles as well as designing and visiting escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cabinet of Curiosities - Dom Tajemnic (Poland)
  • Queen of the Vampires - Dom Tajemnic (Poland)
  • Cursed Island - Escape Project (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
Rooms Played: 141
I like Escape Rooms
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 80
Escape room enthusiast, fan of logic puzzles, board games and bridge. I like to travel a lot, and always looking for some interesting Escape Rooms in the area :) Usually playing in a team of 2
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 250
Owner at Fox O'clock, addicted to escape room games
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • Vampire - Exodus (Poland)
  • Ultimatum: Live or Die.. Make Your Choice - House Escape (Poland)
  • Superheroom - Mr Lock (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 94
Basically - escape rooms enthusiast, that’s why I am a Game Master in Exit19.pl. In escape rooms I focus on riddles, because in my opinion making satisfying riddles is the hardest thing in all process of making an escape room.
Affiliated Rooms: 8
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Murder at the Office - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Prison Escape - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
Ranked Rooms: 15 (sorted by location)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Vampire - Exodus (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 60
I'm escape room enthusiast, in my free time I love to spend some money on this kind of game. I'm Game Master in Exit19.pl. :)
Affiliated Rooms: 8
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Murder at the Office - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Prison Escape - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
Ranked Rooms: 12 (sorted by location)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Freakshow - Break The Brain (Poland)
  • Insanity - Break The Brain (Poland)
  • Superheroom - Mr Lock (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Operation: Metro - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Mystery of Nile's Emperor - Wyjście Awaryjne (Poland)
Rooms Played: 120
I have been an Escape Room fan since 2014. I have visited over 120 escape rooms on my account. I am the creator of an escape room in a real garage. It was free. Created thanks to the community on the crowdfunding portal "PolakPotrafi". I am a member of two escape room teams: "Kreple" which means donuts and "Hawerflocki" which means oatmeal.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Cursed Island - Escape Project (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Temple of Doom - Open The Lock (Poland)
  • City Tunnels - Quest Cage (Poland)
  • Moriarty Ltd - Quest Cage (Poland)
  • Gates of Time - Tortuga - TickTack (Poland)
  • Location - TickTack (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
Rooms Played: 63
Played 63 games. I am just an enthusiast and i play whenever a new room is out here.
Affiliated Rooms: 0
Ranked Rooms: 1 (sorted by location)
  • The Cursed Willy - Sherlocked Homes (Greece)
Rooms Played: 140
Ema is an escape room enthusiast from Belgrade, Serbia, having played over 140 rooms on 3 different continents. She is a co-founder and a creative director of Outrun, a company focused on making escape room/treasure hunt/murder mystery games for team buildings. Very passionate about escape rooms, board games and puzzle design.
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • The Metro - The Game (France) (France)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Catacombs - Golden Pop (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Lab Rat - Hatch Escapes (United States)
  • The Edison Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
Rooms Played: 250
Janice has played over 250 rooms across 14 countries; the figures would be higher were she based somewhere with easy access to flourishing escape room markets. She runs the Singapore-focused review blog Escaping SG (http://escapingsg.wordpress.com/).
Affiliated Rooms: 0
Ranked Rooms: 17 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
Rooms Played: 370
Definitely still an amateur and the "reluctant" accomplice of Toby Powell, who runs the escape game review site https://escapethereview.co.uk. Considers herself very fortunate to have been able to experience 357 physical games across 24 countries.
Affiliated Rooms: 0
Ranked Rooms: 44 (sorted by location)
  • Submarine Bunker - Escape Rush (Belgium)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Interview - Affect Laboratories (Estonia)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • The Metro - The Game (France) (France)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The End - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
Rooms Played: 150
POTOČNIK, Nataša: Co-founder and creative director of Enigmarium® and president of the Association of Escape Room Activities of Slovenia. After opening the first escape room in Ljubljana in 2014, she and her team at Enigmarium® have created over 25 original games. These trendsetting gamification projects in the Alpe-Adria region include the world’s first Escape Igloo® (Snovalec 2015 Award, Ministry of Tourism Slovenia), escape games fully incorporated into local history, a walking tour adventure (Unlock Ljubljana), a gamified exhibit at the Slovenian Alpine Museum in Mojstrana and gamification of a genuine medieval castle in Svetvinčenat, Croatia and the most visited tourist attraction in Slovenia: The Ljubljana Castle. www.escape-room.si natasa.potocnik@enigmarium.si
Affiliated Rooms: 1
  • Redlight Casino - Enigmarium (Slovenia)
Ranked Rooms: 12 (sorted by location)
  • BlueLab - Endorphin Games (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
Rooms Played: 100
Around 100 rooms player in roughly 3 years. Owner of a room in Alicante, Spain.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • The Interview - Cubick (Spain)
  • Catalepsy - Horror Box (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
Rooms Played: 72
HELLO I'M ISA! Member of the "SrySraCariño" Group. In our Group we are a couple of escapists who adore this world and each one of the rooms we have come across. To date we have 72 Escape Room rooms made and, growing, since we do not think to stop doing it ever!
Affiliated Rooms: 1
  • Yucatan: The Last Temple - Coco Room (Spain)
Ranked Rooms: 3 (sorted by location)
  • The Interview - Cubick (Spain)
  • Catalepsy - Horror Box (Spain)
  • The Mine - Unreal Room Escape (Spain)
Rooms Played: 350
Main blogger from Riddle Beaters, from Spain.
Affiliated Rooms: 0
Ranked Rooms: 47 (sorted by location)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • The Edison Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
Rooms Played: 440
Member of Buscadores de Akra (group of escapists from Alicante), has played 440 rooms, almost all in Spain but some outside.
Affiliated Rooms: 0
Ranked Rooms: 41 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
Rooms Played: 66
My name is Toni I am 46 years old, I have been escaping for about 2 years, with a family team (FamilySKP) mainly in Barcelona but also in Girona, Pamplona, ​​Vitoria, Logroño, Santander and Bilbao.
Affiliated Rooms: 0
Ranked Rooms: 30 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 78
I’m Arnau Royo, an escapist since 2019 with 78 Escape Rooms played and counting. I love everything of this world and write reviews about all the rooms I’ve played. You can read the reviews and scores on my Instagram @arnauroyo. The aspects I rate are the fun, the settings/decoration, the story, the puzzles and the Game Master. I wanna be part of this Project voting de bests Escape Rooms I’ve played. Thank you.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 140
Find out more about Aroa at http://segurqueteescapas.wordpress.com
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Ouija - Horror Box (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 170
Love to escape. Co-owner of Bizarre Escape Room, Barcelona. www.bizarrebcn.com
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • The Metro - The Game (France) (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 1200
Eulàlia Pujades (Barcelona, Spain), chemist and materials scientist by profession, pianist and flautist in her spare time and escape room enthusiast. Eulàlia, with her boyfriend, Josep Brull, make up Die Helden. Together they have played 1200 rooms (live and online - October 2020), making them likely the most experienced escape room players in continental Europe. With an amazing 99% escape rate, they started playing escape rooms in January 2014 in Barcelona. Although the vast majority of the games they've played have been in Spain (1150), they’ve also played in England, France, Poland and Andorra.
Affiliated Rooms: 0
Ranked Rooms: 55 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • La Pièce Odyssey - La Pièce (France)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
Rooms Played: 435
Owner of Golden Dreams Escape Productions, Locked ZGZ, Boom Escape, Moorder, Game Box Designer and manufacturer of Catacumbas Barcelona, Locktopus Madrid, Addams House Barcelona Fernando creates props or hall escape for more than 20 escape companies around Spain.
Affiliated Rooms: 2
  • Catacombs - Golden Pop (Spain)
  • Ritual - Locked ZGZ Escape Room (Spain)
Ranked Rooms: 26 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Roomanji - Ilusium (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 210
Escape Room Photographer & Marketing services based in Barcelona. Ex-escape room blogger and current addict to thrilling adventures created by this industry.
Affiliated Rooms: 12
  • The Interview - Cubick (Spain)
  • The Kidnapping - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Darkness - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • The Railway Station - Xkapa (Spain)
Ranked Rooms: 26 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • The End - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
Rooms Played: 53
I am a former escape room game master and I did more than 50 escape rooms since I started in 2017 until present day.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 115
Gemma (Barcelona) has played 115 rooms since November 2017, most of them in Barcelona or nearby towns.
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 157
Escapist as a way of life! I love this world because it sharpens your senses, unleashes your logical thinking and you meet wonderful people with whom to share this divine hobby!
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 106
Owner whitechapel room escape
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
Rooms Played: 330
Passionate of the escape rooms. I have played with my team @Roomeliers around 320 escape rooms all over Spain and Andorra
Affiliated Rooms: 0
Ranked Rooms: 44 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Cursed Expedition - Mythos Escape Room (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
Rooms Played: 200
Game master and player since 2013. Creator of H73, Tolok and Barum Dum.
Affiliated Rooms: 1
  • Barum Dum - Cinema Escape (Spain)
Ranked Rooms: 20 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Cursed Island - Escape Project (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 100
I am Jose Cayuela, I have 100 rooms and I love being able to participate in the TERPECA awards
Affiliated Rooms: 4
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Vikings - Unreal Room Escape (Spain)
Ranked Rooms: 26 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 1200
Josep Brull (Barcelona, Spain), with his girlfriend, Eulàlia Pujades, make up Die Helden. They have both played 1200 rooms (October 2020) always together, making them likely the most experienced escape room players in continental Europe. With an amazing 99% escape rate, they started playing escape rooms in January 2014 in Barcelona. Although the vast majority of the games they've played have been in Spain (1150), they’ve also played in England, France, Poland and Andorra.
Affiliated Rooms: 0
Ranked Rooms: 55 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • La Pièce Odyssey - La Pièce (France)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Volcano in Madagascar - Exit19.pl (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
Rooms Played: 250
I'm from Barcelona and I played my first escape room in 2015. Since then I have played more than 250 escape rooms around the world. Putting together two of my passions (traveling and playing escape rooms) I have played escape rooms in 19 different countries: Spain, United States, Canada, Russia, China, Japan, Thailand, Vietnam, Hungary, United Kingdom, Germany, Sweden, Denmark, Andorra, Croatia, Finland, Iceland, Italy, Czech Republic.
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Beast of Berlin - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Catacombs - Golden Pop (Spain)
  • Roomanji - Ilusium (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Clock Tower - Escape The Room (United States)
Rooms Played: 142
I'm an escape room player . I love it and I play everytime I can. I played 142 rooms already.
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 150
Escape room owner and player (more than 150 games played)
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Below Zero - Escapem (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Ouija - Horror Box (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 860
Escape rooms fan, enthusiastic traveller and dedicated spanish blogger. She has played more than 830 escapes in 21 countries and has all of them rated at www.room-escapers.com
Affiliated Rooms: 0
Ranked Rooms: 106 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Interview - Affect Laboratories (Estonia)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • Lab Rat - Hatch Escapes (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Red Giant - Quest Room (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
Rooms Played: 300
Miquel (Barcelona, Spain) has played over 300 escape rooms, mostly in Spain and also in Andorra, Belgium, UK, and Netherlands. He has played jointly with different teams and is one of the co-founders of Escape Radar (https://www.escaperadar.com/) (the first marketplace of escape rooms for searching and booking escape games in Spain) and recently a co-founder of a new company of escape games in Brutal Escape Room & Games (https://brutalescaperoom.com/)
Affiliated Rooms: 0
Ranked Rooms: 40 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 148
I have an Instagram page called the_d_escapers where you can check all the rooms I have done.
Affiliated Rooms: 0
Ranked Rooms: 39 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Cursed Expedition - Mythos Escape Room (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 54
I'm a room player in my free time from work: I'm a teacher. The first day I played, I didn't know what world I was going to discover. Since then I have not been able to stop playing and discover new rooms. I played mostly in Catalunya, and in Basque Country and the north of Iberian Peninsula.
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • The Interview - Cubick (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 352
Pedro Moreno has played over 250 rooms around Spain with his team Roomeliers since 2016.
Affiliated Rooms: 0
Ranked Rooms: 45 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Cursed Expedition - Mythos Escape Room (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
Rooms Played: 150
My name is Raul and I have been an “escapist” for about 4 years. I love the world of Escape Rooms so much and that’s why I’ve formed a team called "Esgafistas" with my family. Something super original! x) We’ve played more than 140 adventures.
Affiliated Rooms: 0
Ranked Rooms: 34 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • School of Magic - Yurmuvi (Spain)
Rooms Played: 180
Silvia started in this wonderful world of escape room three years ago and today is one of the owners of The Diamond of Souls. They have played approximately 150 rooms in different places in Spain.
Affiliated Rooms: 1
  • The Diamond of Souls - Inmortal Room (Spain)
Ranked Rooms: 24 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 257
I love escape rooms. When I played the first one I got out from there wanting more! When I found friends who were as addict as me I started to search original and fun escape rooms, set in films or those that I thought that would be astonishing. I like to test myself and solve all kind of conundrums and I feel great when a room escape challenge me and I achieve to go out!
Affiliated Rooms: 0
Ranked Rooms: 36 (sorted by location)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 210
Toni Casas has played more than 210 escape rooms, mostly in Spain but also a few in France, UK, Netherlands and Andorra. Together with the photographer Flavio Coddou he runs The Foodinis, a brand specialized in offering professional pictures and graphic design services to escape room owners to promote their business.
Affiliated Rooms: 13
  • The Interview - Cubick (Spain)
  • The Kidnapping - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Gladiators - Escape Masnou (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Darkness - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • The Railway Station - Xkapa (Spain)
Ranked Rooms: 32 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • L.A. Confidential - Lock Academy (France)
  • The Metro - The Game (France) (France)
  • The End - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 450
I've been playing scape rooms since 2014. I am the CEO of the group "Room Adictos" I played over 400 escapes.
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 365
Begoña started playing escape rooms four years ago and is now at 365 games played. They usually play with their partner, and also with friends. They play mostly in Spain.
Affiliated Rooms: 0
Ranked Rooms: 38 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
Rooms Played: 365
Javi has played 365 rooms. Living in Bilbao, they have played almost all rooms in the north of Spain. Also, they have travelled many times to Barcelona and Madrid to enjoy many escape rooms there. They are looking forward to playing many more rooms in the coming years as they just can't get enough of them.
Affiliated Rooms: 0
Ranked Rooms: 38 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
Rooms Played: 100
Iam a 40´s year old man from Spain with 100 Escape Rooms Played in my country and in Portugal too
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Catacombs - Golden Pop (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
Rooms Played: 354
My name is Nuria,from “La Hermandad de Elda”, a team with more than 300 escape rooms. I’m from spain.
Affiliated Rooms: 0
Ranked Rooms: 42 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Cursed Expedition - Mythos Escape Room (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
Rooms Played: 70
i love the "escaper" world ... when we plan the holidays, we do it thinking about the escape rooms we want to do. we love going en route. i love everything around this world.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
Rooms Played: 234
I am addicted to escape rooms, and I have played more than 200 rooms in Spain and some European country. I am currently Co-owner of Experiencity Madrid
Affiliated Rooms: 3
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • Red Experience - Experiencity (Spain)
  • Yellow Experience - Experiencity (Spain)
Ranked Rooms: 26 (sorted by location)
  • The Dome - Escape Room Nederland (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 235
David is part of "Els Cruxinis" an expert friendly room escape group. They have played 219 rooms and usually play as a team of three or four. Up till now they have mostly played in Spain but they have also done a holiday route in Budapest and some rooms in Belgium, Lisbon and Bordeaux.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
Rooms Played: 400
María Balcázar and Carlos Puyuelo are a Spanish couple with more than 350 escape rooms played. They are called "Cazadores de escapes" and have also created several online escape rooms. You can reach them at @cazadoresdeescapes instagram account, where they share their passion and knowledge about this hobby.
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Below Zero - Escapem (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 211
I have dicovered escape room 3 years ago and every time that i have time i play with my team "los atendos". We have played around 220 rooms around the world and thats the beggining. I love manual riddles and high tech one's. Terror it's my favorite theme
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Requiem - Mysterylab (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 120
Madrid escaper
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 142
Hi all, I am an enthusiast escape room blogger, who has played already 142 escape rooms and growing up! You can check my profile and verify my iddentity at Instagram (@escape_the_gate). It would be amazing to participate this year as a voter and next one as a nominator XD. Thank you!
Affiliated Rooms: 0
Ranked Rooms: 38 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Cursed Expedition - Mythos Escape Room (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
Rooms Played: 210
Enthusiastic escape room player. Rooms played in different countries. Running a blog in Spanish and English (escaperoomspain.com).
Affiliated Rooms: 0
Ranked Rooms: 35 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 95
I am part of the best two-player team in the world (hahaha), and always play with my girlfriend (and perhaps 1-2 friends more from time to time). We met 1 year ago and have played c.100 rooms since then, and would like to keep playing all over the world more and more of these amazing experiences.
Affiliated Rooms: 0
Ranked Rooms: 31 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 208
Josue Perez (Madrid, Spain) has played in all regions in Spain and also in Greece, Hungary, Israel and Serbia. Passionate player who likes to carefully choose the rooms he plays, reason why he continuously researches about the different regions escape room markets. He co-runs the blog site EscapeRoomSpain.com.
Affiliated Rooms: 0
Ranked Rooms: 42 (sorted by location)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
Rooms Played: 220
Addicted to escape rooms since early 2014, Lara has now played more than 220 games in Spain, France, UK, Greece and the Netherlands, and is the proud founder of INCOGNITO Escape in Madrid
Affiliated Rooms: 1
  • Operation Steampunk - Incognito Escape Game (Spain)
Ranked Rooms: 41 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • La Pièce Odyssey - La Pièce (France)
  • Requiem - Mysterylab (Greece)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
Rooms Played: 400
María Balcázar and Carlos Puyuelo are a Spanish couple with more than 350 escape rooms played. They are called "Cazadores de escapes" and have also created several online escape rooms. You can reach them at @cazadoresdeescapes Instagram account, where they share their passion and knowledge about this hobby.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Below Zero - Escapem (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 425
Máximo has played 425 rooms, in 15 countries and 4 continents, and is co-owner of 59:59 Escape, a Madrid escape room company.
Affiliated Rooms: 0
Ranked Rooms: 51 (sorted by location)
  • Submarine Bunker - Escape Rush (Belgium)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Live Thriller - Borderlive Concepts (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Slaughterhouse - One Hour (France) (France)
  • The Metro - The Game (France) (France)
  • White Mission - Gozsdu Mission (Hungary)
  • The Intervention - Escape Center (Israel)
  • Cube - The Maze (Israel)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • GhostHunters - Claustrophobia (Russia)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • The Edison Escape Room - Palace Games (United States)
Rooms Played: 220
Find out more about Pablo at www.circulo8.com
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 130
Soraya played their first escape room in january 2016. They had a great experience and after more than 100 escapes done, it is their favourite hobby.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • The Interview - Cubick (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
Rooms Played: 477
Spanish escape room lover. 477 rooms played throughout Europe.
Affiliated Rooms: 0
Ranked Rooms: 45 (sorted by location)
  • The Slaughterhouse - One Hour (France) (France)
  • Santa Muerte - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 101
I have start playing RoomEscapes 5 years ago and at today i have allredy play 101 on spain
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Castaway - Password Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 93
A little ER enthusiast with more or less 93 rooms played and about 50 more online. Part of the Sin Roombo team.
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 158
I'm Sonia, creator of the ERA (Escape Room Addict) group. I have played more than 150 escape rooms, and I like all kinds of themes, fear, adventure, science fiction, physics, ...
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 150
Hello, I am Ismael Martinez, I am a very active escape room player, I have owned my own room, I like to play for the satisfaction of being able to escape from each room and to discover a new world in each adventure, I have escaped from more than 150 rooms
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 167
Sandra didn't know the world of escape rooms until this June when she met it and was amazed at the wonders they are capable of creating. Since then she has played more than 150 rooms and rising. For now, she has only played in Spain and Germany, and makes small reviews on her Instagram profile, with more than 9000 followers and on Twitter, with more than 22000, @retrorunning_.
Affiliated Rooms: 0
Ranked Rooms: 32 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 200
I am a regular escape room player, we have played all over Spain. We are passionate about it.
Affiliated Rooms: 0
Ranked Rooms: 31 (sorted by location)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
Rooms Played: 200
Regular ER player, I have escaped 200 times throughout Spain and once in Scotland.
Affiliated Rooms: 0
Ranked Rooms: 31 (sorted by location)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
Rooms Played: 110
Owner and creator of Futura Escape Room
Affiliated Rooms: 1
  • Futura - Futura (Spain)
Ranked Rooms: 22 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Ouija - Horror Box (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 450
Find out more about Jose at Loscylons.wordpress.com
Affiliated Rooms: 0
Ranked Rooms: 47 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Jungle Quest - Escape Dimension (France)
  • Mystery on Lived Street - Escape Dimension (France)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
Rooms Played: 308
Escaping from real life since 1981, Carlos has played more than 300 rooms in 5 countries (mostly in Spain) and uses big data analysis to decide what to play next.
Affiliated Rooms: 0
Ranked Rooms: 44 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 80
Pedro has played 74rooms with his teammates of La Patrulla X Xcapers, where he's Coloso.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 121
I played my first room more than 5 years ago, but I really got hooked up since last year when I found the room scapers group. Currently I've made a playing team with 3 more friends. So far 121 rooms played.
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 437
Find out more about Anna at https://m.facebook.com/ribescapers/
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 85
Hello, my name is David and I am writing to you from Spain. I am passionate about escape rooms. I have played more than 80 rooms and I would like to contribute my ranking. My team on instagram is @los4fantasticos_david
Affiliated Rooms: 0
Ranked Rooms: 32 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
Rooms Played: 80
Antonio is a part-time elementary teacher at CENAP academy in Calella. He's been a lover of role-playing games since the age of 14 and is now 37. Co-owner and game master of EXITUS ROOM ESCAPE in Palafolls. He usually teaches his students through games so he loves gamification. Nominated in 2019 Escape Room Awards for best Gamesmaster, and best immersion.
Affiliated Rooms: 1
  • Heirloom - Exitus (Spain)
Ranked Rooms: 17 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 168
More than 4 years playing room escapes around Spain, especially in Catalonia. More than 3 years like a blogger testing games.
Affiliated Rooms: 0
Ranked Rooms: 33 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 221
Escape room enthusiast and digital technology professional. I love the role plays in the rooms and immersive experiences that takes you to a whole new world for an hour.
Affiliated Rooms: 0
Ranked Rooms: 32 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 164
I am just a big fan of scape rooms that have done more than 170 with my team, La Fuga de Piticli, in Spain and some over the world (London, Vietnam...) And I work as a GM in Cubick Escape Room here in Valencia, my home city
Affiliated Rooms: 1
  • The Interview - Cubick (Spain)
Ranked Rooms: 2 (sorted by location)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
Rooms Played: 313
A great enthusiast with more than 310 games, Saioa has played in all over Spain, Andorra, London, Poland and Budapest. Mostly with as a couple and a lot with several friends. Last year attended ERIC too.
Affiliated Rooms: 0
Ranked Rooms: 45 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 600
Find out more about Guillem at www.room-escapers.com
Affiliated Rooms: 0
Ranked Rooms: 49 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • Lab Rat - Hatch Escapes (United States)
  • Red Giant - Quest Room (United States)
  • The Study - The Basement (United States)
Rooms Played: 860
Enthusiast since 2016. Played in 21 countries and up to 700 games. Admin of the Spanish Enthusiasts group "room escapers" on Facebook and WhatsApp, member of "El Quinto Elemento" Escape team. www room-escapers.com
Affiliated Rooms: 0
Ranked Rooms: 106 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Interview - Affect Laboratories (Estonia)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Asylum - Exit19.pl (Poland)
  • Betrayal in Breslau - Exit19.pl (Poland)
  • King Arthur's Dungeons - Exit19.pl (Poland)
  • Necromancer - Ritual of Death - Exit19.pl (Poland)
  • Time Machine - The Secret of Leonardo - Exit19.pl (Poland)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • Lab Rat - Hatch Escapes (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Red Giant - Quest Room (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
Rooms Played: 700
More than 700 escape rooms played in Spain, Hungary, London, New York, Lisbon, southern France and Milan. Co-owner of Password Escape Room, with rooms in Vitoria, Madrid, Córdoba and Pamplona (Spain).
Affiliated Rooms: 1
  • Castaway - Password Room Escape (Spain)
Ranked Rooms: 25 (sorted by location)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Ouija - Horror Box (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Cursed Expedition - Mythos Escape Room (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
  • Frankenstein's Girlfriend - Yurmuvi (Spain)
  • School of Magic - Yurmuvi (Spain)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Prison Break - The Escape Game (United States)
Rooms Played: 60
Jose is a player that enyoys playing these games. He plays with his wife and has a group called Mañicos Escapistas.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • The Interview - Cubick (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
Rooms Played: 317
I've been playing escape rooms since 4 years ago. I'm a member of "Basquescapers team". At present, I have played more than 300 escapes of all kinds, mostly in Spain and a few in other countries
Affiliated Rooms: 0
Ranked Rooms: 42 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Real Estate - Insidious (Spain)
  • The Doctor's Cocktail - Insomnia Corporation (Spain)
  • The House - Insomnia Corporation (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • The Railway Station - Xkapa (Spain)
Rooms Played: 124
Kristen (LUND, Sweden) has played over 120 rooms; some in the US but most of them in Europe. Enthusiast in many fields including family, work, travel and of course, escape rooms! Loves escape weekends packed with rooms and has played in Budapest, Warsaw, Athens, Madrid and Netherlands. This year was more about exploring online rooms.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • Operation Steampunk - Incognito Escape Game (Spain)
Rooms Played: 195
Passionate gamer, creative architect.
Affiliated Rooms: 2
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Heist 1847 - Time Maze (Switzerland)
Ranked Rooms: 27 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Geldrausch - 66 Minuten (Germany)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 220
Find out more about Sandro at www.escaperoom-guide.com
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • The Dome - Escape Room Nederland (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 200
Co-owner of Trapgame, 10rooms escape room in Switzerland. Benoît has played more than 200 rooms.
Affiliated Rooms: 2
  • Jurassic Jones - Trapgame (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
Ranked Rooms: 11 (sorted by location)
  • Celestia - L'Atelier des Énigmes (France)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • Judgment Day - My Escape Club (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 136
I have been working on a luxury cruise ship for over 15 years and have traveled around the world. Since 2016 I have become fascinated by escape rooms, completing over 130 rooms in 29 counties (at the time of writing). My crew mates, family, friends, are all part of a group we call The World Escape Crew. We have our own Instagram page, website (under construction) and t-shirts!
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
Rooms Played: 74
I am a huge escape room enthusiast. Before meeting my current boyfriend I had only done one, now I have escaped over 70 times. My goal is to complete all the AdventureRooms franchised rooms in Switzerland before the end of 2020
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
Rooms Played: 150
Swiss player, with a 150 rooms experience mostly in Switzerland and Canada. Proud member of Les 4 fantastiques et la chieuse.Scenarios creator hoping to run my own escape room company one day!
Affiliated Rooms: 3
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Mr. Trippolyte's Vestibule - Trip Trap (Switzerland)
Ranked Rooms: 12 (sorted by location)
  • The Dreamwalkers - Cabinet Mysteriis (Canada)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 52
PhD student in neuroscience studying flow, and magic and VR in the past, now based in Geneva. I have played escape rooms since 2014 mostly in Europe and in the US, and have been a huge enthusiast of escape rooms immersive experience and alternate reality games in general. I do magic and improv and have designed amateur experiences in the past.
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Boda Borg - Boda Borg (United States)
  • The Vanishing Act - Locurio (United States)
Rooms Played: 349
True Escape lover, willing to play every time when it’s possible, and quite often spending a day filled with 4-5 rooms. I love to share those moments in a room with friends, and I love being immersed in beautiful set-ups!
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Jungle Quest - Escape Dimension (France)
  • Mystery on Lived Street - Escape Dimension (France)
  • Celestia - L'Atelier des Énigmes (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • Fairy Tale Regulations - Pandore & Associés (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Blackwood Affair - Wake Up (France)
  • Barum Dum - Cinema Escape (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 56
Selina lives in Geneva. She always loved riddles and mystery books, so when she discovered escape games, it was a hit
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Submarine Bunker - Escape Rush (Belgium)
  • La Pièce Odyssey - La Pièce (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Slaughterhouse - One Hour (France) (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 430
Mathieu has played over 430 rooms, all around the world, but mostly in Europe and more specifically Switzerland. Most of the rooms have been done with the Pingouins Ténébreux (Dark Penguins, https://www.pingouins-tenebreux.com). They are ranked first in the world championship (https://escape-room.academy/) and won the first Swiss escape championship. (https://www.escapegamepass.ch/) They like traveling (and visiting ERs while abroad), hiking, diving, boardgames. He designed an EG for his girlfriend on her hemibiodi (meaning she had spent half of her life with him :-D) It took him two months to create it, and if you can spare the time (staying at home with his broken collarbone helped) he really recommends you try it once. It's fun to create and then fun to watch!
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Interview - Cubick (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 232
Maxime has played over 230 rooms in 12 different countries. He likes to create escape games for their friends and for events at work. As an electronic engineer, he likes to create all kind of mechanisms and puzzles. He even taught his wife to design electronic circuits and are planning to do a big electronic puzzle. he loves horror themed escapes
Affiliated Rooms: 0
Ranked Rooms: 38 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • The Live Thriller - Borderlive Concepts (France)
  • Celestia - L'Atelier des Énigmes (France)
  • Einstein's Letter - Le Passage (France)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Woman in Black - Coven Escape Rooms (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Wake Up - Station 33 (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 434
After playing brain teasers and pub/music quizzes as well as video games such as the Myst and Zelda series for years, Stéphanie played her first escape room in 2015 and soon became addicted. She’s now played over 430 games in 19 different countries. She and her team Pingouins Ténébreux (pingouins-tenebreux.com) are Swiss champions (Escape Game Pass 2018), and ranked 1st in the Escape Room Academy World championship in Sofia (2018-2019). She also created two small (one-night-only) escape rooms for her work colleagues.
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Creepy Store and the Lost Souls - Escapepolis (Greece)
  • Requiem - Mysterylab (Greece)
  • Katharsis - Caves of Banjul - No Escape (Greece)
  • Death Row - No Exit (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • In the Shadow of the Pyramids - Wyjście Awaryjne (Poland)
  • Nautilus: The Underwater Adventure - Wyjście Awaryjne (Poland)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • The Interview - Cubick (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 83
I have started to play escape rooms only 1,5 years ago. Since then, my passion for this sort of sparetime activity has grown immensely. Most of the rooms I have played so far were in Switzerland and Germany. I am looking forward to discover the rest of the escape-room-world!
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
Rooms Played: 201
Joel is an Escape Room enthusiast! He works as a puzzle designer and gamemaster in Switzerland. He is also part of the Hivemind reviews at RoomEscapeArtist. More about him on his Youtube channel: www.youtube.com/Smileypeacefun
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
Rooms Played: 168
I'm an escape room owner from switzerland and played nearly 200 rooms all over the world.
Affiliated Rooms: 2
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Heist 1847 - Time Maze (Switzerland)
Ranked Rooms: 23 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 150
Founder and owner of Insidebreakout and co-founder of Escapetogether.ch in Switzerland. Loves playing and designing games.
Affiliated Rooms: 1
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
Ranked Rooms: 22 (sorted by location)
  • Geldrausch - 66 Minuten (Germany)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Poltergeist - The Code Agency (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
Rooms Played: 250
Escape Room Enthusiast with more than 200 Rooms played. Reviews on teamblackrose.com
Affiliated Rooms: 0
Ranked Rooms: 29 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 350
Enric has played 300+ rooms, while starting to play on Jun 2018. He has been involved in playtesting, hobby and competitive escaping. On his free time, Enric organizes private puzzle and treasure hunts and posts on http://www.teamblackrose.com
Affiliated Rooms: 0
Ranked Rooms: 43 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Secret Elixir - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Act II: The Litchver Woodland - Dare Escape Rooms (Greece)
  • The Dark Side of Elements - Exit Plan (Greece)
  • Death Row - No Exit (Greece)
  • Paradox Project 3: The Music Academy - Paradox Project (Greece)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • The Hour of the Beasts - Katharsis (Spain)
  • Until Dawn - La Clau (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Whitechapel: La historia de Charlotte - Whitechapel (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 100
I started playing Escape Rooms about 4-5 years ago with my boyfriend (most times only the two of us). We have played up to 100 rooms in Switzerland and other countries, especially on city trips. We participated in the Swiss championship twice and got to 2nd and 3rd place.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
Rooms Played: 225
Escape room enthusiast and part of “Team Black Rose” a group of friends who play escape rooms nationally as well as internationally. For reviews and rankings see our blog: https://www.teamblackrose.com/
Affiliated Rooms: 0
Ranked Rooms: 0 (sorted by location)
Rooms Played: 200
Escape Room Enthusiast and Owner (Time Maze in Baden)
Affiliated Rooms: 2
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Heist 1847 - Time Maze (Switzerland)
Ranked Rooms: 27 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Geldrausch - 66 Minuten (Germany)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Panzerknacker - The Art of Stealing - Limbus Escape Center (Germany)
  • The Alley - Rätselraum Ruhrpott (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Search for the Scepter of Light - The Code Agency (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 180
Phil is the owner of Pier Pressure in Brighton UK and has played over 175 games
Affiliated Rooms: 2
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Broken - Pier Pressure / Pressure Point Escape Rooms (United Kingdom)
Ranked Rooms: 16 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 52
Escape room enthusiast on 52 rooms (as of the date written)! Fell in love with escape rooms when I played with my partner 2 years ago at The Escapement in Margate, so got a job there last year and have been playing ever since!
Affiliated Rooms: 2
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Ranked Rooms: 7 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
Rooms Played: 260
Having started playing escape rooms on a family holiday in Barcelona I returned to the UK determined to build one. I have now designed (or been part of the design team) a dozen rooms, owned and sold physical venues, designed and marketed an online room, and played physical rooms in the UK, Spain, and Egypt.
Affiliated Rooms: 1
  • The Guardian of the Gallery - Want to Escape (United Kingdom)
Ranked Rooms: 17 (sorted by location)
  • Barum Dum - Cinema Escape (Spain)
  • Heirloom - Exitus (Spain)
  • Roomanji - Ilusium (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
Rooms Played: 114
Juliette has played over 100 rooms across the UK, US, New Zealand and Europe in what started as a simple hobby in 2015 before developing into a full blown obsession in 2018. Still terrible at searching for things; likes logic puzzles.
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 208
Started playing rooms 3 years ago, part of The WockCombles team who have played over 100 rooms. Ive played 188 to date covering England, Spain and Egypt. During lockdown I played circa 30 online games.
Affiliated Rooms: 1
  • The Guardian of the Gallery - Want to Escape (United Kingdom)
Ranked Rooms: 10 (sorted by location)
  • Barum Dum - Cinema Escape (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
Rooms Played: 800
Dave represented the UK at the RBERWC 2019, through no fault of his own, the rest of the team didn't tell him what was happening until the night before qualifiers. He looked at last year's contributers for TERPECA and decided he could be a contender for top twenty contributers, based on room count, so aggressively played terrible rooms all year long. Dave accidentally lost count of his room number somewhere around 350. Fortunately Sera kept a better count. Turns out he's nearly at 500. Dave hasn't updated his Bio this year, but he's up to 700ish, jesus, I don't know, it's getting ridiculous.
Affiliated Rooms: 2
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Ranked Rooms: 95 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Sub Terra - Co-Decode (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Prison Break - The Escape Game (United States)
Rooms Played: 93
I've been playing escape rooms for a few years now and been hooked since my second room at time run. I'm spoilt for choice down here in Kent and absolutely love chatting all things around escape rooms especially when visiting companies run and owned by fellow enthusiasts
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 295
No bio submitted
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Barum Dum - Cinema Escape (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Sub Terra - Co-Decode (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 217
Dean is a professional journalist and writer in the UK and has played over 200 rooms. His escape room writings can be found on EscapeReview.co.uk and podcast witterings at EscapeCast.co.uk
Affiliated Rooms: 0
Ranked Rooms: 28 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Haunted House - The Chamber (Czech Republic)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 124
Jess has completed 124 escape rooms and can be found in a lot of the post-escape pictures on www.escapereview.co.uk. Accidentally stole a key from an escape room in 2014 and has never been allowed to forget it by her teammates, despite immediately posting it back.
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Catacombs - Golden Pop (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 718
Jackie is probably Scotland's most prolific escape roomer with over 700 rooms played so far, which includes almost 300 remote rooms. She also runs a Facebook community page where Scotland's escape rooms are promoted ( https://www.facebook.com/exitgamesscotland/ ) and has even been known to create the occasional pop up room for events.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 65
I'm part of the 'best'-named escape room team in the known universe - Granny & the Anthropomorphic Panda Avengers. I blog here https://gatapae.home.blog/ focusing on family and young person-friendly rooms.
Affiliated Rooms: 0
Ranked Rooms: 2 (sorted by location)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
Rooms Played: 90
Designer, Gamemaster and player. My favourite rooms make me forget its a game. Fond of the surreal and the scary.
Affiliated Rooms: 3
  • Christmas Dream - Locked In Glasgow (United Kingdom)
  • Glasgow School of Magic - Locked In Glasgow (United Kingdom)
  • The Surgery - Locked In Glasgow (United Kingdom)
Ranked Rooms: 14 (sorted by location)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
Rooms Played: 102
Escape room enthusiast and owner since 2016
Affiliated Rooms: 2
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
Ranked Rooms: 10 (sorted by location)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
Rooms Played: 103
Myself and my partner are huge enthusiasts having now played over 100 rooms in under a year! I love the escape community and the joy it brings to everyone from escapees to owners and love a new experience!
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 117
Tim and his partner have been fully immersed in an Escape Room addiction for nearly two years and are just over the 100 rooms played mark. He's played a majority of the more highly rated and often recommended games, as well as his fair share of hidden gems.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • Sub Terra - Co-Decode (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 62
Enthusiast for all things escape room, played and designed them, can't get enough!!
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • The Mine - Unreal Room Escape (Spain)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 181
Member of the Uncontainables, 150+ rooms complete with a 100% success rate! No affiliations to any escape games, just an escape room fan!
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 482
Amy started playing escape rooms in August 2015 and since then has played a fair few games! Games for her are a stress release - in a strange way - taxing her brain has always been enjoyable, there is a certain enjoyment in popping open a lock and she loves the rush of adrenaline from completing a room - it can't be beaten! This crazy hobby obsession has led to some amazing times, from appearing as a cameo in an escape room, to appearing in publicity for others and speaking on the enthusiast panel at ERIC of course. The best thing, from her point of view, is the wonderful, amazing and brilliant people she has met on this journey! https://britofanescapehabit.wordpress.com
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
Rooms Played: 136
Alex D (London, UK) is an enthusiast who has played more than 100 rooms and despises difficulty through darkness.
Affiliated Rooms: 0
Ranked Rooms: 30 (sorted by location)
  • Escape from The Red Room - SCRAP (Japan)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 82
Long-time escape room enthusiast having completed over 80 rooms.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 150
Owner UNBOXD, a boutique experiential events agency, curating the best immersive entertainment and escape gaming experiences for UK audiences. Our mission is to increase awareness and build audiences for escape room operators and the industry as a whole.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 87
David is an escape room enthusiast from North East London. Since January 2019 he has played 87 rooms in The UK and Prague, the majority as a pair with his girlfriend. He's currently in the planning stage of opening his own room.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
Rooms Played: 220
Swenglish escape room all-rounder, first game completed 2013 in London. 200+ rooms completed all over UK and Europe. Many but not all reviewed on TripAdvisor. Attended ERIC in Nottingham.
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Interview - Affect Laboratories (Estonia)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 231
Fiona has played over 230 games across 9 countries and has a growing list of trips to make for rooms she "must" play, if only real life didn't keep getting in the way. She apologises for her hyper-competitive teammate.
Affiliated Rooms: 0
Ranked Rooms: 34 (sorted by location)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Sub Terra - Co-Decode (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • The Study - The Basement (United States)
Rooms Played: 106
I have completed over 100 Escape rooms in the last 4 years, and have started my own blog to review them (discomlogicated.com). My favourite tropes are handcuffs, having our team split into different rooms to work together, and being surprised by a well hidden secret room.
Affiliated Rooms: 0
Ranked Rooms: 5 (sorted by location)
  • Sub Terra - Co-Decode (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 256
Gord has played a little over 230 'real' rooms and just over 100 online 'experiences', mostly in the UK but North America has featured too. With his wife, Liz, he runs ReviewTheRoom, an outlet to try and make this escape room addiction seem more legitimate
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Zoe - Escapade Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
Rooms Played: 84
Karyan is an escape game enthusiast and has played over 70 escape rooms mainly in London but also other countries including Spain, Italy, Hong Kong and Japan. She and her husband are obsessed with these challenges and have formed a strong team together - it's one of their favourite pasttimes!
Affiliated Rooms: 0
Ranked Rooms: 2 (sorted by location)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 900
Ken has played over 900 rooms and runs The Logic Escapes Me, an escape room review blog covering the UK and Europe, as well as Exit Games UK, a directory, map, and news site for UK games. He was a member of Team UK in the 2017 Red Bull Escape Room World Championship, was on the design team for the 2019 competition, and was a speaker at both the UK and European escape room conferences in 2017, 2018 and 2019. Disclosure: Ken has received paid work related to escape rooms from Red Bull, Escape, Playful Solutions and Clue Adventures (none of these companies have nominated games) and has received complimentary games from many escape rooms. He has tried his best not to allow this to bias his rankings.
Affiliated Rooms: 0
Ranked Rooms: 66 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Submarine Bunker - Escape Rush (Belgium)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Plane - The Game (France) (France)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • Below Zero - Escapem (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 256
Escape Room Enthusiast and one half of the team at www.reviewtheroom.co.uk
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Zoe - Escapade Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
Rooms Played: 107
Escape Room Reviewer & Blogger over at www.theescaperoomer.com
Affiliated Rooms: 1
  • Our Finest Hour - Escape Hunt (United Kingdom)
Ranked Rooms: 5 (sorted by location)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 378
Mark is a keen enthusiast with over 375 rooms under his belt. He has got around a bit having escaped from 10 countries and been part of at least 4 different teams. He doesn’t consider himself an addict, especially when compared to other people on this list!
Affiliated Rooms: 0
Ranked Rooms: 37 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Night Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • The Study - The Basement (United States)
Rooms Played: 125
An escape room, Virtual & Augmented Reality, board game, interactive & immersive theatre enthusiast with 110+ rooms successfully escaped.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • The Live Thriller - Borderlive Concepts (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 71
Rory is an escape room enthusiast and fan of all kinds of puzzles. He's played over 70 escape rooms in 7 countries.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Dome - Escape Room Nederland (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Sub Terra - Co-Decode (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 226
Confessing escape room addict, half of team The Overthinkers. Completed all rooms in a country (Malta), played in 6 countries to date. Likes to play back to back games for hours. Obsessed with fake grass in rooms.
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 1804
Sarah Dodd (London, UK) has played just over 1800 rooms. This makes her almost certainly the most experienced escape room player in the western world alongside Sharan, with whom she's played every single game. Together they have a 99.8% escape rate, have played in 18 different countries, and once played 615 games in a single year. Only discovering escape rooms in May 2016 when Sarah decided to book something spontaneous for her own birthday, they have since been members of Team UK during both Red Bull Escape Room World Championships. They've played approximately 500 games as a pair and shared 1000 games with over 80 different teammates from around the world, at least 500 of which have been with the incumbent UK team, Team Squared. Sarah co-founded and has run the UK Escape Room Industry Conference 'ERIC' for the past three years, works as a UX and Design Consultant within the industry, was a speaker and panellist at Up the Game in 2017, 2018 and 2019, is an admin of the UK Escape Room Owners Facebook group, a moderator on the UK Escape Room Enthusiasts Group, one of three co-hosts of a UK-based ER podcast, runs Team Squared’s Instagram account and has been featured in the UK press, TV and radio on a number of occasions. Her real hobbies include bouldering and befriending wild animals. In her spare time, she's a doctor.
Affiliated Rooms: 4
  • Chronos - Escapologic (United Kingdom)
  • Howitz - Escapologic (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
Ranked Rooms: 121 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Submarine Bunker - Escape Rush (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Haunted House - The Chamber (Czech Republic)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 1804
Sharan has played lot of escape games, every single one with her partner in crime, Sarah. She's based in London. She's a civil engineer who loves bridges. She doesn't do much for the industry, other than play a lot of games, and drive other people around. Part of Team Squared. Part of UK Red Bull Escape Room team, both times
Affiliated Rooms: 0
Ranked Rooms: 122 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Submarine Bunker - Escape Rush (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • SawRoom: The Revenge - SawRoom (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Haunted House - The Chamber (Czech Republic)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • Cannibal Island - Quest Factory (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 226
ER enthuiast that started slow in 2018, but haven't looked back since. Enjoy original/unique themes and high levels of immersion. No country is too far (hence the weekend in Shanghai to play Mr X...)
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 646
Toby Powell (London, UK) has played over 600 rooms, runs the escape game review site https://escapethereview.co.uk, and has personally reviewed escape games in 26 different countries.
Affiliated Rooms: 0
Ranked Rooms: 48 (sorted by location)
  • Submarine Bunker - Escape Rush (Belgium)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • Interview - Affect Laboratories (Estonia)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • The Metro - The Game (France) (France)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The End - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • Nazi Gold - Black Cat Escape Room (Poland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
Rooms Played: 151
Manchester based escape room player
Affiliated Rooms: 0
Ranked Rooms: 3 (sorted by location)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
Rooms Played: 724
Regular escaper and Red Bull World Championship participant with Team Squared. Creator and Admin of UK Escape Room Enthusiasts Facebook group.
Affiliated Rooms: 0
Ranked Rooms: 89 (sorted by location)
  • An Avalanche of Oblivion - Claustrophobia (Andorra)
  • Going Underground - Crime Runners (Austria)
  • Al Capone's Secret Bar - 3KEY Rooms (Bulgaria)
  • BlueLab - Endorphin Games (Bulgaria)
  • The Secret Of Kryptos - Myst Entertainment (Bulgaria)
  • Atlantis - Teorema Escape Rooms (Bulgaria)
  • La Pièce Odyssey - La Pièce (France)
  • Einstein's Letter - Le Passage (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Yucatan: The Last Temple - Coco Room (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • The Brewery - Enigmik (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Heirloom - Exitus (Spain)
  • Yellow Experience - Experiencity (Spain)
  • Elkano Escape Room - Experientziak (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Roomanji - Ilusium (Spain)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Kidnapped in Barcelona - Kidnapped in BCN (Spain)
  • Until Dawn - La Clau (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Innkeeper's Son - DragonBorn Escape Room (Mad Mansion) (Spain)
  • 101 Years of Forgiveness - Over Time (Mad Mansion) (Spain)
  • Call or Die - Over Time (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • The Mystery of Scum Island - Madness Toledo (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • Quintana Mine / The Mine Diavik - Mina Madrid / Unreal Room Escape (Spain)
  • Explosives Specialist - Open Mind Room Escape (Spain)
  • Castaway - Password Room Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Apophis - Vortex Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • The Railway Station - Xkapa (Spain)
  • Kontinuum - AdventureRooms (Switzerland)
  • Spektrum - AdventureRooms (Switzerland)
  • The Ticking Heart (Part 1) - Inside Breakout (Switzerland)
  • The Forbidden City 1901 - Time Maze (Switzerland)
  • The Pirates of the Blacktrap - Trapgame (Switzerland)
  • An Evening with the Voodoo Queen - Trip Trap (Switzerland)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Sub Terra - Co-Decode (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 240
Owner of The Escapement and all round awesomeness
Affiliated Rooms: 2
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
Ranked Rooms: 19 (sorted by location)
  • The End - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • Prison Break - The Escape Game (United States)
Rooms Played: 156
Hollie is an escape room enthusiast who has completed 156 escape rooms at the time of writing, mostly in the UK but internationally as well. Her first room was in 2015 and was a wedding present, she did 6 rooms that year, 13 in 2016, 21 in 2017, 40 in 2018, 63 in 2019 and has done 13 so far in 2019 so the rate has increased year on year. She currently has a 100% escape rate which she expects to end any day now and her common team names are Collie, Top of the Stairs, The Highlanders or Salum & Collie, depending on who she's playing with.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • Revolt at Lock Academy - Lock Academy (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • Santa Muerte - E-Exit (Hungary)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
Rooms Played: 177
Enthusiast playing rooms since 2017, interested in the experience as opposed to setting times. Experienced LARPer and interested n the stories behind rooms as well.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Day Mode) - Lockhill (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • The Mine Box - The Box (Greece) (Greece)
  • Daylight Robbery - Cryptology (United Kingdom)
Rooms Played: 90
Red Dwarf
Affiliated Rooms: 2
  • Daylight Robbery - Cryptology (United Kingdom)
  • Dreamscape - Cryptology (United Kingdom)
Ranked Rooms: 12 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The Brewery - Enigmik (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
Rooms Played: 58
Photographer/hobby escaper
Affiliated Rooms: 0
Ranked Rooms: 1 (sorted by location)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 223
James has played around 200 live rooms, and runs Deadlocked Escape Rooms in the UK. He also wrote the book on 'Escape Room Puzzles'.
Affiliated Rooms: 1
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
Ranked Rooms: 7 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • GhostHunters - Claustrophobia (Russia)
  • Sub Terra - Co-Decode (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
Rooms Played: 211
I have been playing escape rooms since 2017 and have recently gone past 200 rooms played. I also now GM for Hysteria Escape Rooms in Chatham, UK.
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 71
I have played nearly 70 rooms in the UK and some overseas as well, I am also a regular contributor to the UK enthusiasts Facebook group.
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
Rooms Played: 130
UK based escape room enthusiast, part of blogging duo @escapingthecloset (instagram), having played over 100 rooms
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 54
My name is Austyn and I run a review website on Thrilling Attractions called Thrill Nation. Also work at Puzzalogical Escape Rooms in my hometown Bracknell.
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 119
An escape room enthusiast from Southampton, England!
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Sub Terra - Co-Decode (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 124
An Escape Room Enthusiast from Southampton, UK
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Sub Terra - Co-Decode (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 77
A simple teambuilding exercise with work quickly turned into a hobby for me. The feeling of being removed from the outside world, forgetting all your troubles and having a sense of achievement is what makes escape rooms so special to me. My biggest achievement is finishing a room in Birmingham UK quicker than team squared (and that's some accomplishment)
Affiliated Rooms: 0
Ranked Rooms: 3 (sorted by location)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
Rooms Played: 303
Phill Nathan (Surrey/Hampshire, UK) has played over 300 rooms, across UK, Europe and a smattering across North America (including a handful online). It has been known for most road trips to be based in/routed through escape rooms that are on his 'must play' list. He currently playtests games for others, and has begun to design challenging online puzzles for freeplay, and the next step is to start designing real-life actual rooms. His journey to this madness technically started back in 1999, when he started volunteering at a local youth centre, and quickly became known for bringing in gameshows on a shoestring budget to the venue. His highlight was convincing the managers to let him turn the entire youth centre building into the Crystal Maze for two weeks for the older age groups to play. Bear in mind, this was in 2003, so thankfully there are no digital photos of him dressed up as a maze master. For the next decade, he took this approach into nationally-run childrens' activity camps, winning a couple of company awards for interpretations of other gameshows to junior participants. Jumping forward to 2005, things got a bit more serious, when he joined a large online forum focused around point-and-click online escape games, riddles and puzzles, becoming part of the staff team in 2010. This meant that games like The Crimson Room were very much a part of his world. His favourite game of this type is probably the Hoshi Saga series. Occasionally he writes/hosts pub quizzes, and during lockdown got fed up with the general dross floating about on social media, so set about creating a few puzzles himself; which have inadvertently turned out to be a lot harder than first anticipated. He has more baseball caps than most of his friends' room counts, and his favourite part of a room's preamble is the bit where the GM has had to add in extra weird rules, because previous teams made poor in-game life choices.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Sub Terra - Co-Decode (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 249
To date I have played 240 rooms. The majority I play with my husband as a pair but we do sometimes play with other people! I am an enthusiast, not a blogger or owner.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Sub Terra - Co-Decode (United Kingdom)
  • Daylight Robbery - Cryptology (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • Age of Magic - Escape Reading (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 60
Sim discovered Escape Rooms when she started working for one in 2016. She started as venue staff, and while she can be seen busting out an occasional rhyming clue or two, is now more active in the regional IT team. She loves playing escape rooms as much as running escape rooms. She thinks the best part of working at an Escape Room is helping people pull off awesome marriage proposals. (The worst thing is having to watch people tread on the books 😢) Will talk Escape Room accessibility and game design at anyone who stands still and shows even the slightest bit of interest.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 150
Katie, along with her husband, has played over 150 games and now owns Clue Cracker in Tunbridge Wells, Kent, with three games. They are huge enthusiasts!
Affiliated Rooms: 1
  • The Diamond Dogs - Clue Cracker (United Kingdom)
Ranked Rooms: 15 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Sub Terra - Co-Decode (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
Rooms Played: 145
Escape room and all round gaming enthusiast from Worthing, West Sussex, UK. Kat loves immersive experiences and prefers the theatrical and story driven games to puzzle heavy or deliberately hard rooms. They want to truly believe it's real life and will travel as much as funds allow seeking out new experiences.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Haunted House - The Chamber (Czech Republic)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • Extinct - Escape from Jurassic Island - Houdini's Escape Room Experience (United Kingdom)
  • Loot the Lanes - Pier Pressure (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
Rooms Played: 84
As escape room enthusiast and owner, I have found that nothing else compares to the adrenaline rush of doing an escape room and having it surpass your wildest expectations.
Affiliated Rooms: 1
  • Return of the Pharaohs - Paragon Escape (United States)
Ranked Rooms: 13 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 125
Kimberly has played 125 rooms and counting, and is the owner of the forthcoming review site www.EscapeRoom.guru
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
Rooms Played: 58
I am one of four owners of Trivium Games in Emeryville, CA. I have been an active membe of the Bay Area puzzle community for years and contributed to the development of several puzzle hunts before launching Trivium Games. In 2020 we opened our first escape room, "Ghost Patrol," which pulls loosely on the themes from previous puzzle events we've run.
Affiliated Rooms: 1
  • Ghost Patrol - Trivium Games (United States)
Ranked Rooms: 8 (sorted by location)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 188
Enthusiast and owner. Have played just shy of 200 rooms mostly in Southern California.
Affiliated Rooms: 1
  • Time Machine - Not Another Escape Room (United States)
Ranked Rooms: 14 (sorted by location)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Elevator Shaft - The Basement (United States)
  • Playground - The Escape Game (United States)
Rooms Played: 150
Paige Kasper has played over 150 rooms across the United States. She's constantly creating new enthusiasts by dragging anyone she can to an escape room. She's even managed to inspire a couple of her friends to create an escape room company.
Affiliated Rooms: 1
  • Villains - Fuzzy Logic Escape Room (United States)
Ranked Rooms: 18 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 1295
Amanda Harris (Foster City, CA, USA) has played over 1200 rooms, making her likely the most experienced escape room player in North America. Amanda is also a Guinness World Record holder for most escape rooms played in one day.
Affiliated Rooms: 0
Ranked Rooms: 82 (sorted by location)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • GhostHunters - Claustrophobia (Russia)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 988
Drew has played 988 rooms on 4 continents. He's among the most experienced escape room players in North America.
Affiliated Rooms: 0
Ranked Rooms: 70 (sorted by location)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 235
Nick Baxter (USA) has played over 200 rooms in 11 countries. He was on the team that claims the first successful U.S. escape: Dec. 28, 2012. More recently, he was a participant in both the 2017 and 2019 Red Bull Escape Room World Championships. He is director of the U.S. Puzzle Championship, president of the International Puzzle Collectors Association, chair of the Nob Yoshigahara Puzzle Design Competition, and member of the advisory council for the Gathering for Gardner.
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • The Metro - The Game (France) (France)
  • White Mission - Gozsdu Mission (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Prison Break - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 97
Fan of escape rooms and haunts. Does a lot of wood working and hobby electronics for fun.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Zoe - Escapade Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 181
Kevin Schraith (SF Bay Area, CA, USA) has played over 180 games (known as Tronic to his NPL/Mystery Hunt friends). Member of Left Out team that wrote and ran the 2020 MIT Mystery Hunt.
Affiliated Rooms: 0
Ranked Rooms: 22 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • The Whispering Halls - Enchambered (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 627
Kiki has played over 600 rooms, but still doesn't consider herself a "real" enthusiast. As Rich's wife, she regularly enables his escape room addiction.
Affiliated Rooms: 0
Ranked Rooms: 93 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • GhostHunters - Claustrophobia (Russia)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 907
Rich Bragg is the founder of the Top Escape Rooms Project. Rich has played over 900 escape rooms and over 300 puzzle hunts in North America and Europe. He has three top 10 finishes in international escape room competitions (3rd in the 2017 Red Bull Escape Room World Championships, 10th in the 2019 Red Bull Escape Room World Championships, 3rd in the 2020 ER Champ International Escape Room Championship), is a former Guinness World Record holder for most escape rooms played in one day, and is the co-founder and CEO of ClueKeeper, a platform for creating and playing location-based clue hunts. Disclosure: Some of the companies with nominated rooms that Rich has played and ranked also offer hunts on ClueKeeper.
Affiliated Rooms: 0
Ranked Rooms: 105 (sorted by location)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • GhostHunters - Claustrophobia (Russia)
  • Insane Paranoid - Quest-Art (Russia)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Escape the R.M.S. Titanic - Houdini's Escape Room Experience (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 196
Roomescapeartist.com Hivemind Writer Cara is a master of burning her candle at both ends. By day, she is the Story Experience Producer for Meow Wolf. She is also the Co-Founder and CEO of Interwoven Immersive, Inc. and a frequent Contributor/ Festival Correspondent for NoProscenium.com. When she isn’t reviewing escape rooms for Room Escape Artist, she can probably be found… playing other escape rooms or attending immersive shows. No, YOU have a problem!
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 274
Douglas has played 274 escape rooms and is now nearly broke from his addiction. At night, he can be spotted along various freeway off ramps holding a sign that says “Will work for escape rooms”.
Affiliated Rooms: 1
  • Scooby-Doo and the Spooky Castle Adventure - Escapology (United States)
Ranked Rooms: 23 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 105
Kirk Damato is a writer and puppeteer in Los Angeles, CA. He co-designed the "Escape From Hollywood & Highland" room for the Upright Citizen Brigade Theatre's HOTEL HELL-A Halloween immersive show.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • Escape from The Red Room - SCRAP (Japan)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Study - The Basement (United States)
Rooms Played: 150
Based in Southern California, United States. Started playing escape room in late 2018, addicted and reviewing constantly by 2019, and finally established his own blogging website by late 2019 to early 2020. Friendly enthusiast and escape rooms and puzzle games reviews blogger at EscapeMattster.com :D (Mattster is a play on words; Matt plus master equals Mattster.)
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Stash House - Stash House (United States)
  • The Elevator Shaft - The Basement (United States)
Rooms Played: 120
Sarah Willson is a writer, editor, and game designer who delights in solving problems of all kinds. She serves as the Los Angeles correspondent for RoomEscapeArtist.com.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Escape from The Red Room - SCRAP (Japan)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Study - The Basement (United States)
Rooms Played: 486
Tammy McLeod (Los Angeles, CA, USA) has played nearly 500 rooms, was a member of Team USA in both the 2017 and 2019 Red Bull Escape Room World Championships, and was the 2009 United States National Sudoku Champion.
Affiliated Rooms: 0
Ranked Rooms: 42 (sorted by location)
  • White Mission - Gozsdu Mission (Hungary)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Strange Magic - Mind Masters Challenge Chambers (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • The Heist - Red Fox Escapes (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 150
Terry Rolapp is one half of the creative team behind Hatch Escapes in Los Angeles. He spent the aughts in New York City racking up degrees and passing time as a playwright, a composer, a graphic artist, a high school teacher, and a professor of art criticism at NYU. Then he picked up an MBA at UCLA and ran a few companies. In designing and building escape rooms, Terry has finally found the perfect vehicle for his unique assortment of skills and interests.
Affiliated Rooms: 1
  • Lab Rat - Hatch Escapes (United States)
Ranked Rooms: 30 (sorted by location)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 651
Tommy Honton is a Los Angeles-based experience designer who specializes in weaving interactivity and game mechanics into narrative storytelling. He has produced interactive and immersive work for audiences of all sizes across the planet. He is also co-creator and designer of Stash House and co-founder of the interactive exhibition Museum of Selfies.
Affiliated Rooms: 2
  • Zoe - Escapade Games (United States)
  • Stash House - Stash House (United States)
Ranked Rooms: 17 (sorted by location)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
Rooms Played: 68
I've played more escape rooms than I have friends
Affiliated Rooms: 4
  • Arena - MindTrap Escape Room (California) (United States)
  • Excalibur - Livestream - MindTrap Escape Room (California) (United States)
  • Gold Rush - Livestream - MindTrap Escape Room (California) (United States)
  • Oz - MindTrap Escape Room (California) (United States)
Ranked Rooms: 7 (sorted by location)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 560
Christine aka The Haunt Girl has her own blog www.TheHauntGirl.com where she has been reviewing escape rooms & haunts since 2015. She has played over 450 escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 28 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
Rooms Played: 200
Amy Yin has played over 200 rooms. Amy works in healthcare and would likely quit her job if she could actually support herself playing escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
Rooms Played: 183
Dan is an enthusiast who first wandered into an escape room with his wife in Prague 2016. He was immediately hooked and has since played over 180 rooms. Most of these have been located in California but he has also been on trips to try rooms in New Orleans, Portland, Las Vegas, Norway, Sweden, Spain, and Eastern Europe. Along with his wife, he also created an escape room tracker for Northern California for enthusiasts to share reviews and rankings. https://docs.google.com/spreadsheets/d/1dY6XChn5ghLUzlppD_PlT1uNEajjY1jjz4gVtOtAhNY/edit?usp=sharing
Affiliated Rooms: 0
Ranked Rooms: 31 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 70
Co-owner of Trivium Games in Emeryville CA. www.triviumgames.com
Affiliated Rooms: 1
  • Ghost Patrol - Trivium Games (United States)
Ranked Rooms: 8 (sorted by location)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 133
Justin Graham escaped his first room (TOMB) in 2004, and has since enjoyed over 130 escape rooms in 17 US states and 4 different countries, not to mention hundreds of other similar puzzle events (such as The Game, BANG, DASH, Shinteki, MIT Mystery Hunt, etc). He has no financial or business relationship to any game listed here.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Vanishing Act - Locurio (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 183
Katie Raser-McLeod is an escape room enthusiast with 183 rooms played. She is passionate about travel, puzzles, games, and beer. Escape rooms and post-escape celebrations quickly became a favorite hobby of her and her husband ever since their first room in Prague four years ago.
Affiliated Rooms: 0
Ranked Rooms: 31 (sorted by location)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • The Interview - Cubick (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Futura - Futura (Spain)
  • Catalepsy - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 215
Over 125+ in-person rooms, and 100+ virtual rooms under my belt. Love immersive rooms, chock full of puzzles and A-HA moments! Word puzzles are my drug of choice.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Vanishing Act - Locurio (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 90
Brandon West is an enthusiast and an owner of an escape room in Southern California. He has played 90 escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 100
A puzzle-lover for as long as she can remember, Divya played her first escape room in 2014 and has been hooked ever since. She and her husband have played 100+ rooms together and dream of designing their own room one day!
Affiliated Rooms: 0
Ranked Rooms: 13 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Prison Break - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 257
Sarah was dragged into the escape room vortex by her husband Randy Hum, the mastermind behind www.escaperumors.com. Together, they have traveled the world to review hundreds of escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 44 (sorted by location)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Boda Borg - Boda Borg (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 293
Janell Woodbury has played 293 escape rooms. When she played her first escape game, she found her passion and the thing that would annoy her friends and family by her incessant talks about them for years to come. She owns the very low key Exit Strategy Games, escape room in Elk Grove, CA, but she considers herself way more of an obsessive enthusiast than an escape room owner, and she considers the business as a way to fuel her escape room obsession.
Affiliated Rooms: 0
Ranked Rooms: 28 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 100
West Coast USA player. Play in a few states. Took a break from escape room as the first 4 games were lame. Found out how good rooms can be and now Im at over 100. I usually play with my future-husband who unfortunately wont do the spooky things XD
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 150
Brent Holman (San Francisco, CA, USA) is a veteran of the puzzle community. He spearheaded the development of six iterations of The Game and over a dozen 12-hour road rally puzzle hunts. He is the founder and lead puzzle designer of Shinteki (a company that runs puzzle-based public and private events throughout North America), as well as the co-founder of ClueKeeper with Rich Bragg. On the escape room side of things, he has been a core member of the design team at Palace Games in San Francisco since its inception. Disclosure: Some of the companies with nominated rooms that Brent has played and ranked also offer hunts on ClueKeeper.
Affiliated Rooms: 3
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
Ranked Rooms: 20 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Zoe - Escapade Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Elevator Shaft - The Basement (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 137
Cassandra began doing escape rooms in March of 2016. In November of 2019, she completed her 100th escape room. She enjoys escaping with her husband.
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 390
Jason Lee has played 390 rooms and was a member of Team USA in the Red Bull Escape Room World Championship in 2017 and 2019.
Affiliated Rooms: 0
Ranked Rooms: 26 (sorted by location)
  • White Mission - Gozsdu Mission (Hungary)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Study - The Basement (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 135
Enthusiastic enthusiast. Founder and chief engineer for Trivium Games. Consulted on Palace Games's Escape the Palace thing.
Affiliated Rooms: 1
  • Ghost Patrol - Trivium Games (United States)
Ranked Rooms: 15 (sorted by location)
  • Boda Borg - Boda Borg (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 137
An SF Bay area enthusiast of escape rooms, parkour, and memory. Everything looks like an escape room now.
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 180
Matthew Stein (San Francisco, CA) has played 180+ games and is a Hivemind reviewer for RoomEscapeArtist.com. He designs puzzle hunts, ARGs, and immersive theater through his company Enigmida (enigmida.com).
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Storykeeper - Locurio (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 350
Randy started EscapeRumors.com in 2017 to share his passion with others and to help grow the escape room community. He has played around 350 escape rooms in the US and overseas with the goal of connecting to fellow enthusiasts and introducing people to this new genre of entertainment. When stuck on a puzzle, he will resort to using a "cheat code" (aka Sarah, his better half) for a solution. Randy also created an Escape Room Enthusiast interactive dashboard, a tool that visually maps out player demographics from all over the globe. Outside of escape games, you can find Randy on the tennis court or on the road for a run!
Affiliated Rooms: 0
Ranked Rooms: 62 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Legend of the Three Dragons - Escaparium (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Entrenched - Conecta Escape / Experiencity (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Below Zero - Escapem (Spain)
  • Catacombs - Golden Pop (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 89
Will has been an escape room enthusiast since his first escape game in 2014, and an escape room addict since 2019 when he started traveling specifically for escape rooms. Would’ve reached 100 total games played if COVID-19 didn’t cancel plans for an escape room tour of Europe. 😭
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Whispering Halls - Enchambered (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 101
Jason Yu and his wife Emily Pong have played over 100 escape rooms, mostly on the US West Coast. Jason is the creator and GM for "Animal Crossing Escape: The Tea Party", an escape room built and run in Animal Crossing: New Horizons for the Nintendo Switch (on hiatus and not currently running): https://escaperoomtips.com/animal-crossing/escape-room-jason-yu Jason is also a composer and writer: http://jasonyu.me/
Affiliated Rooms: 1
  • Animal Crossing Escape: The Tea Party - Jason M. Yu (United States)
Ranked Rooms: 16 (sorted by location)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 112
[√] escape room enthusiast [√] travel to play escape rooms [√] escape room owner [√] barely made it out but still love escape rooms [√] ask for a hint every 5 min
Affiliated Rooms: 3
  • Chaos in the Galleria - Omescape (United States)
  • Joker's Asylum - Omescape (United States)
  • Pursuit of the Assassin Artist - Omescape (United States)
Ranked Rooms: 13 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
Rooms Played: 450
Trisha Huang (San Jose, CA, USA) has played over 450 rooms, around 100 of which were played while pregnant with twins. The twins have done around 5 rooms outside the womb.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Stash House - Stash House (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 699
Wei-Hwa Huang was a member of the Global Wildcard team in the 2017 Red Bull Escape Room World Championship, and was a puzzle consultant for the 2019 competition. As an award-winning game designer and four-time World Puzzle Champion, Wei-Hwa's accomplishments are enough to warrant his own Wikipedia page. He also contributed directly to this project by suggesting various approaches to consider for the data analysis including the one that led to the ultimately chosen approach.
Affiliated Rooms: 0
Ranked Rooms: 37 (sorted by location)
  • White Mission - Gozsdu Mission (Hungary)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Henry Fortune's House of Illusion - Escape Quest (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Viking - Extremescape (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 809
Has played over 800 rooms, and was part of the team to set the original Guinness World Record for most escape rooms played in one day. Her website is at https://anaulin.org.
Affiliated Rooms: 0
Ranked Rooms: 87 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • GhostHunters - Claustrophobia (Russia)
  • Insane Paranoid - Quest-Art (Russia)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 911
Dan Egnor has played too many rooms and is a Guinness World Record holder for most escape rooms played in one day. He was has contributed to the design and production of The Edison Room at Palace Games in San Francisco, ranked #6 in the 2018 TERPECA.
Affiliated Rooms: 3
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
Ranked Rooms: 92 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • GhostHunters - Claustrophobia (Russia)
  • Insane Paranoid - Quest-Art (Russia)
  • Abduction 3: The Exam - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Futura - Futura (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • Vault 27 - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 115
Blake is a mid-30s married geek girl living in Silicon Valley with her husband and dog. She loves traveling, trying new foods, scuba diving, riding her gas scooter, and escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • The Secret of Saint-Rumoldus - De Gouden Kooi (Belgium)
  • Submarine Bunker - Escape Rush (Belgium)
  • The White House, Secrets of the Culper Ring - Escape Rush (Belgium)
  • Chapter 2: Playtime - Lost Games (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 936
Nick Schilbe has played 936 rooms and is the owner of Off The Couch Games (https://offthecouchgames.com) in Santa Clara, California. He fell in love with escape rooms in 2013 when chasing down horror events for Halloween. Since then he has traveled the world trying to find the best escape rooms and eventually deciding to take what he's learned and build his own.
Affiliated Rooms: 0
Ranked Rooms: 40 (sorted by location)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Escape from The Red Room - SCRAP (Japan)
  • GhostHunters - Claustrophobia (Russia)
  • Insane Paranoid - Quest-Art (Russia)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 70
19-year-old enthusiast studying at UC Berkeley
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
Rooms Played: 119
Elizabeth Fitzgerald (Stanford, CA, USA) has played 117 rooms. She runs a small review blog and hopes to some day design her own escape room! She has also recently started working on a recommendation system for escape rooms in California, although she hopes to eventually expand the project to cover the entire US.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • The Edison Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 94
Jenn has been involved in the escape room business since 2015. They have worked for three different escape room companies and love playing rooms as often as they can afford.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
Rooms Played: 251
is a game designer at Funbi Games and the admin at Room Escape Problems on Facebook.
Affiliated Rooms: 6
  • Escape the Darkest Hour: Torture Chamber - Mission Escape Games (United States)
  • Escape the Hydeout - Mission Escape Games (United States)
  • Gold Rush - The Escape Game (United States)
  • Mission: Mars - The Escape Game (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Ranked Rooms: 0 (sorted by location)
Rooms Played: 110
Bay Area resident who actively writes reports for Bay Area Escape Rooms.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Ghost Patrol - Trivium Games (United States)
Rooms Played: 150
Denver, Colorado based artist and escape enthusiast who happens to play competitive roller derby for Rocky Mountain Rollergirls. Also an immersive obsessed world traveler with a penchant for geocaching and Liberty Puzzles. Excited to discover the world’s best escape games, Michelin starred meals, and breathtaking natural beauty.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 626
Darren and his wife, Melissa, have been hooked on escape rooms ever since they discovered them in May 2015. He posts puzzles from time to time on his site at https://sites.google.com/site/dkmiller71
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Strange Magic - Mind Masters Challenge Chambers (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 514
I am an escape room and immersive entertainment enthusiast with around ~500 rooms under my belt. I first played in the summer of 2016 for my bachelor party and have been hooked ever since! I'm so glad to get to help contribute to this awesome project.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Zoe - Escapade Games (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 90
Stuart has escaped a paltry 90 rooms and works as a software engineer in an attempt to be able to afford the next higher tier of enthusiast.
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • The Metro - The Game (France) (France)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
Rooms Played: 192
Sarah Eve is a co-owner of Kingdom Escape Games, WndrBox, and an enthusiast. They are an adrenaline junky with a passion for crazy adventures, escape rooms, puzzles, and anything weird or amazing.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 198
Hello! I'm Jakal, I am an Owner, creator, and Enthusiast. I am always striving to find the best / worse escape rooms I possibly can. I have done Escape rooms in many different states. I am very interested in traveling over seas to do more rooms as well as finding some of the best ones in the U.S. My Partner and I do spontaneous road trips all the time in which we roll dice to find random escape rooms all over the country by the luck of the die.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 423
Brian has solved over 400 escape rooms, including solving one in each of the 50 US states in 2018. Brian continues to travel regularly and writes about escape rooms and other puzzle challenges on PuzzleDrifter.com.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 88
Anne Lukeman has played over 80 rooms, in addition to designing about a dozen at CU Adventures in Time & Space, which she co-owns with her husband, Chris.
Affiliated Rooms: 1
  • The Wizard's Curse - CU Adventures in Time and Space (United States)
Ranked Rooms: 15 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 80
I'm the owner of Fox in a Box - Chicago and got started in the Escape Room industry in 2014 after playing my first rooms in Novi Sad, Serbia while traveling Europe on year long sabbatical with my wife & kids in a 36' American motorhome. In addition to owning Fox in a Box, I founded the Chicagoland association of owners group and am a lightweight enthusiast having played about 80 in person games and 8 virtual games.
Affiliated Rooms: 0
Ranked Rooms: 7 (sorted by location)
  • White Mission - Gozsdu Mission (Hungary)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Whispering Halls - Enchambered (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Prison Break - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 190
Emergency physician married to an emergency nurse who has become obsessed with escape rooms for the challenge and break from reality they represent.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Inventor's Attic - Escape My Room (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 316
Daniel Dilley has played over 300 rooms. Located in middle America, he usually plays with his wife while traveling to ballroom dance competitions all over the USA. He was a member of the Wildcard team in the London Red Bull Escape Room World Championship. Also has experience room escaping in Taipei during annual family visits.
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Lab: Lockdown - Revo Escape (Canada)
  • King of the Bootleggers - Secret City Adventures (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Detention - Ctrl Alt Esc (United Kingdom)
  • The Comms Room - Escape in the Towers (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • University of Magic: Dragon's Heart - Lucardo (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 201
Brian is an escape room enthusiast and escape game tech designer. He's an electrical engineer by trade, and an escape artist in his heart. He has played over 200 rooms across 13 states in the USA. His wife and he love escape rooms and play as much as they can. They have also recently discovered their passion for helping bring affordable and quality tech to escape room owners who are in need of engineering services on a budget. He's here because he loves the escape room community and want to help make it stronger and help others on their quest to find the perfect escape.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 201
My husband and I have played 201 escape rooms in 13 states. We began about two years ago when we only saw each other on weekends while living 4 hours apart. Now we get to plan all of our vacations around the best escape room areas. We even got engaged in a room where my husband was able to redesign half of the puzzles for me and we spent our honeymoon in Nashville and Atlanta! Our most exciting accomplishment is that we pretty regularly beat rooms that were meant for 3+ players with just the two of us. We plan to open our own room at some point, but for now we’re happy to travel and enjoy the experiences.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 109
Anthony Buono (Boston, MA) has played 109 escape rooms in the USA and Canada. He is fortunate to have an occupation that keeps him moving around the country, allowing him the opportunity to experience the best escape rooms in North America.
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Observatory - The Gate Escape (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 194
James Cobalt (Boston, MA, USA) has played somewhere between 170ish-190ish escape games (subject to your own personal game-counting rules and restrictions) across Europe and North America; mostly the top recommendations from fellow enthusiasts –resulting in skewed perspectives and unreasonable expectations of most venues. Before recklessly spending his time and money on these expensive distractions, he developed interactive experiences and story-driven puzzle hunts in the Boston area. Today he is nearly destitute.
Affiliated Rooms: 0
Ranked Rooms: 27 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • The Secret Lab - Locked in Edinburgh (United Kingdom)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • The Heist - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Observatory - The Gate Escape (United States)
Rooms Played: 420
With friends, on dates, during work team-builders and sometimes even by himself, Jarrod has escaped rooms from San Francisco to Switzerland. A previous owner, he now enjoys creating and participating in virtual puzzle hunts and running statistical analysis of escape room data.
Affiliated Rooms: 0
Ranked Rooms: 9 (sorted by location)
  • The Metro - The Game (France) (France)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • The Observatory - The Gate Escape (United States)
Rooms Played: 56
Rene owns The Gate Escape in Leominster Massachusetts.
Affiliated Rooms: 2
  • The Assistant - The Gate Escape (United States)
  • The Observatory - The Gate Escape (United States)
Ranked Rooms: 3 (sorted by location)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
Rooms Played: 80
I'm a frequent puzzle constructor and solver, with most of my creative output appearing in live and online puzzlehunts. I usually play escape rooms as a pair when I travel with my wife, and in larger groups with friends closer to home.
Affiliated Rooms: 0
Ranked Rooms: 18 (sorted by location)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Vanishing Act - Locurio (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 106
Jeff has played 106 escape rooms, making him the most experienced player in the town of Webster, MA, population: few. He also co-owns Outside the Box Escape Room in Webster, home of the semi-legendary "Aftermath", the current fan favorite "The Body Shop", and the totally unique "Darklight Disco Fight", all found at www.outsidetheboxma.com . Owning an escape room venue means Jeff has very little time to play the games he craves, which is why he coughs into his hand when saying "106" to enthusiasts who ask how many he's played. And also because of the poverty. Next year he plans to play more games and hopefully hit the fabled "107" mark.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • The Observatory - The Gate Escape (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 280
David has done almost 300 rooms across 5 countries and 3 continents. He loves them all from Gen 1 to crazy laser stuff... (except black light; please phase that out!)
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 109
Escape room enthusiast and general manager. Played more than 100 rooms.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 285
Chris is an escape room addict who has played over 285 rooms in 6 countries since discovering escape rooms just a few years ago.
Affiliated Rooms: 0
Ranked Rooms: 45 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Haunted House - The Chamber (Czech Republic)
  • Haunted House 2: Poltergeist - The Chamber (Czech Republic)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • Prison Break - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 366
Brandon Smith is the editor and writer for www.escapeadventurer.com, where he has written over 350 reviews for escape rooms and home puzzling experiences. He has escaped 366 rooms and has been playing escape room games as early as 2000, during the advent of the flash escape room games. During his adventures, he is joined by his wife, Kara, and his A-Team of escapists, Keyed Up!
Affiliated Rooms: 0
Ranked Rooms: 3 (sorted by location)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
Rooms Played: 225
Sheryl is an escape room enthusiast and owner who has been hooked on escape games since 2015. She ended up working for the same company where she played her first escape room and learned the ins and outs of the industry there. Upon relocating to Massachusetts, she decided to open up her own escape business and make it her full time career.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Lockwood Manor - Lockhill (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Red Giant - Quest Room (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • The Observatory - The Gate Escape (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 247
Will has played 247 rooms along side his wife throughout the US and in the UK. They love escape rooms and aren’t stopping anytime soon.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Study - The Basement (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 320
Lindsay "Fro" Froelich has played 300 escape rooms in 12 countries across four continents. When she isn't playing rooms, she can be found solo traveling the globe, hitting up concerts, watching the sun set on the beach and planning her next scuba diving adventure. With many of those activities currently unavailable, her greatest quarantine achievements include developing a taste for IPAs, learning to do cryptic crossword puzzles and FINALLY watching The Wire.
Affiliated Rooms: 0
Ranked Rooms: 34 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Neptune's Curse - Hidden Games (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 181
Escape room and immersive experience enthusiast from northern New Jersey. He's traveled across the country to play games and he's more than willing to do it again - when it is safe to do so.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • The Observatory - The Gate Escape (United States)
Rooms Played: 886
David is quite fond of dexterity and communication puzzles. Most of his free time is spent writing about the escape room world with his wife Lisa over at RoomEscapeArtist.com. He might like word puzzles, but his wife solves them before he ever gets to process them.
Affiliated Rooms: 0
Ranked Rooms: 85 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Rebellion - Clock Escape Rooms (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Midnight Killer MK II - Piwnica Quest (Poland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Strange Magic - Mind Masters Challenge Chambers (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 886
It’s true, Lisa is really good at word puzzles… and logic puzzles too. She might not be the most experienced escape room player in the world, but she is confident that she's the most experienced escape room scheduler in the world. You can see her work her magic on an Escape, Immerse, Explore tour.
Affiliated Rooms: 0
Ranked Rooms: 81 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Neptune's Curse - Hidden Games (Germany)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • The Sanatorium (Midnight Mode) - Lockhill (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Swamp Of Sorrows: Death And Despair - Room 54 (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Judgment Day - My Escape Club (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Time Machine - Deadlocked Escape Rooms (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Pudding Lane 1666 - TimeTrap Escape Rooms (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Strange Magic - Mind Masters Challenge Chambers (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 239
Brett Kuehner has played more than 230 rooms and teaches an escape room design class for high school students. He worked on Risa Puno's Privilege of Escape, an escape room which helps players understand how privilege affects us all. His house does not contain an escape room, but *does* contain a statistically improbable number of puzzles. He has done paid design and/or tech work for Escape the Room (Clocktower, Submarine, Meltdown), Escape My Room (Escape Extinction: Sharks), Escaped Vegas (Zoe), and Adventure Lab (Dr. Crumb's School for Disobedient Pets), and informal consulting for Olde City Games and trap't (for games that are not nominated this year).
Affiliated Rooms: 3
  • Escape Extinction: Sharks - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Ranked Rooms: 23 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • The Metro - The Game (France) (France)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • The Heist - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • The Observatory - The Gate Escape (United States)
Rooms Played: 108
Denise Kuehner (Old Tappan, NJ) has played over 100 rooms, and is a teacher who enjoys creating educational escapes for her students.
Affiliated Rooms: 2
  • Zoe - Escapade Games (United States)
  • The Clock Tower - Escape The Room (United States)
Ranked Rooms: 19 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Lost Island of the Voodoo Queen - Escaparium (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Red Giant - Quest Room (United States)
  • The Heist - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • The Observatory - The Gate Escape (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 283
Richard first heard of escape rooms in 2014. Once he read the description of what an escape room was he was hooked. He has since done over 250 escape rooms in 9 different countries.
Affiliated Rooms: 3
  • Chapter 2: Playtime - Lost Games (United States)
  • One Eyed Jack - Trapped! (United States) (United States)
  • Operation: X-13 Online - Trapped! (United States) (United States)
Ranked Rooms: 32 (sorted by location)
  • The Metro - The Game (France) (France)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 114
Co-owner of Lost Games in Las Vegas, NV. Loves the immersive, narrative based escape rooms with great puzzles and flow.
Affiliated Rooms: 1
  • Chapter 2: Playtime - Lost Games (United States)
Ranked Rooms: 16 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
Rooms Played: 226
Amanda is the creator of Charmandacure Puzzle Nails, which is a collection of free bimonthly room-escape-style puzzles in the form of manicures. She is often called on by other creators to beta test puzzles for subscription games, escape rooms, and puzzle books. She has played 226 escape games in 14 states and 3 countries and is an admin of the NYC Room Escape and Puzzle Enthusiasts Facebook group. She met her boyfriend through the puzzle website "Tim Tang Test" and won first place in a Brazilian Minesweeper tournament in 2016. She frequently participates in puzzle hunts and the World Puzzle Federation Grand Prix. Her team won 1st in the Great Gotham Challenge in 2020 and the Galactic Puzzle Hunt in 2017.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Strange Magic - Mind Masters Challenge Chambers (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 226
C.J. has played 220-230 (depending on what counts) rooms and played his first on the day he met his now girlfriend Amanda, with whom he has played almost all of those. He created and moderates the NYC Room Escape and Puzzle Enthusiasts facebook page (https://www.facebook.com/groups/219054565238345), and enjoys beta-testing and giving feedback and ideas to new rooms and projects in the area. He also regularly participates in puzzle hunts and competitions such as the World Puzzle Federation puzzle grand prix.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Strange Magic - Mind Masters Challenge Chambers (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 79
Ben Rosner (Brooklyn, NY, USA) has played over 80 rooms across 7 different states. His other interests (when not in pandemic times) include immersive attractions, theme parks and going to concerts.
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Playground - The Escape Game (United States)
Rooms Played: 300
David has done over 250 escape rooms across the globe. Wherever he travels he fits in an escape room at some point. He's also worked for escape rooms for the last 4 years. He notes that anaging an escape room is more difficult than playing one...
Affiliated Rooms: 0
Ranked Rooms: 8 (sorted by location)
  • The Metro - The Game (France) (France)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • The Clock Tower - Escape The Room (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 235
One of Rita's favorite puzzles is building crazy escape room itineraries in foreign places, and thus she has played over 230 rooms across 8 countries. She is an artist and designer of narrative tabletop puzzle adventures and the creator of PostCurious. (Getpostcurious.com)
Affiliated Rooms: 2
  • Jurassic Escape - Escape The Room (United States)
  • The Clock Tower - Escape The Room (United States)
Ranked Rooms: 43 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • White Mission - Gozsdu Mission (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Pirates' Robbers - Escape Life / Exit Room Israel (Israel)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 215
Theresa Piazza has played roughly 215 escape rooms and in her free time is a personal support human for David and Lisa Spira of RoomEscapeArtist.com.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 506
Brandon, along with his wife Cici have played over 500 escape games in over 30+ countries and 450 other categories of online games since 2018. They are the creators of ESCAPETHEROOMers (www.ESCAPETHEROOMers.com), a blog/vlog site for escape rooms and other "at home" games. They have helped create pop up games, participated as panelists at various escape room conventions including ERIC and RECON. Recently they've created a new YouTube series called "Behind The MasterMinds" where they highlight behind the scenes contents and inspiring stories from the game creators.
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • The Clock Tower - Escape The Room (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 206
Brendan I hit his 200th game in early 2020. In his spare time he's the IT utility guy at RoomEscapeArtist.com helping out in numerous technical capacities.
Affiliated Rooms: 0
Ranked Rooms: 20 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 506
Cici, along with her husband Brandon have played over 500 escape games in over 30+ countries and 450 other categories of online games since 2018. They are the creators of ESCAPETHEROOMers (www.escapetheroomers.com), a blog/vlog site for escape rooms and other "at home" games. They have helped create pop up games, participated as panelists at various escape room conventions including ERIC and RECON. Recently they've created a new YouTube series called "Behind The MasterMinds" where they highlight behind the scenes contents and inspiring stories from the game creators.
Affiliated Rooms: 0
Ranked Rooms: 21 (sorted by location)
  • Santa Muerte - E-Exit (Hungary)
  • Secret Subway - E-Exit (Hungary)
  • Escape from The Red Room - SCRAP (Japan)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Cutting Room - Locked in Edinburgh (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • The Clock Tower - Escape The Room (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 170
Enthusiast, 150+ games, NYC and CA based but will travel for great rooms. Physician and Founder of mental wellbeing startup Curio.
Affiliated Rooms: 0
Ranked Rooms: 16 (sorted by location)
  • Below Zero - Crypto Escape Rooms (Canada)
  • The Grand Wilshire Hotel - The Imaginarium (Canada)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 342
William Chen, along with his wife Yuan Jiang, has played over 340 rooms, runs Escape Room Tips (escaperoomtips.com), and was on the nomination panel for the USA Today 10Best Escape Rooms in 2017, 2018, and 2019.
Affiliated Rooms: 1
  • Vault of the Volcano God: The Break of Day - Epic Team Adventures (United States)
Ranked Rooms: 33 (sorted by location)
  • The Metro - The Game (France) (France)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 342
Yuan Jiang, along with her husband William Chen, has played over 340 rooms, runs Escape Room Tips (escaperoomtips.com), and was on the nomination panel for the USA Today 10Best Escape Rooms in 2017, 2018, and 2019.
Affiliated Rooms: 1
  • Vault of the Volcano God: The Break of Day - Epic Team Adventures (United States)
Ranked Rooms: 33 (sorted by location)
  • The Metro - The Game (France) (France)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Curio - Escapologic (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 385
Escape Room Enthusiast with games played throughout the United States. Former Contributor for EscapinGuru and organizer of Escape Room Marathons throughout the NorthEast US. Escape Room Enthusiast meetup organizer for 9 cities and counting. Outside of the ER World, Rachel works as the Chief of Staff for a Commercial Furniture Delivery and Installation company and teaches Pilates.
Affiliated Rooms: 0
Ranked Rooms: 19 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 181
Shuai has represented Team USA for both the Red Bull Escape Room Championships and has played games on three continents. She makes virtual escape games specifically for team-building (patchworkadventures.com) and has been working on that since 2017.
Affiliated Rooms: 0
Ranked Rooms: 23 (sorted by location)
  • White Mission - Gozsdu Mission (Hungary)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • The Heist - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
Rooms Played: 60
I am a middle-aged person with no kids and love a good puzzle. I have always been a problem solver so when I first discovered that escape rooms were a thing in 2014, I was super into the idea. I didn’t get to play one until 2016 though and since then my love for the industry has only grown. I travel in weekends to new cities and will play as many games as my brain can stand. My record, along with my partner is 13 rooms in two days. We have traveled quite a bit on the east coast (even during thepandemic, but we did it safely!) and are planning even more trips in 2021.
Affiliated Rooms: 0
Ranked Rooms: 6 (sorted by location)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Strange Magic - Mind Masters Challenge Chambers (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 1045
Jennifer Geske has played about 1050 rooms in 12 countries, and is a co-owner of Epic Team Adventures, an escape room company in Seattle, Washington.
Affiliated Rooms: 1
  • Vault of the Volcano God: The Break of Day - Epic Team Adventures (United States)
Ranked Rooms: 80 (sorted by location)
  • La Pièce Odyssey - La Pièce (France)
  • L.A. Confidential - Lock Academy (France)
  • Revolt at Lock Academy - Lock Academy (France)
  • Lost Asylum - One Hour (France) (France)
  • The Slaughterhouse - One Hour (France) (France)
  • The Metro - The Game (France) (France)
  • The Plane - The Game (France) (France)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Escape the Car - Killer - Lockbusters (Greece) (Greece)
  • The Emperor's Masterchef is Dead - Mister.E (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • Escape from Wonderland - Escape from Wonderland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Aunt Hilda's Room - Trip Trap (Switzerland)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Pirates of Polaris - The Escapement (United Kingdom)
  • The Pit - The Escapement (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • Zoe - Escapade Games (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Strange Magic - Mind Masters Challenge Chambers (United States)
  • Chaos in the Galleria - Omescape (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Heist - Red Fox Escapes (United States)
  • The U-Boat - Red Fox Escapes (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 314
Played more than 300 rooms in 20 countries and maintain EscapeRoomer, a Portland-focused escape room blog.
Affiliated Rooms: 0
Ranked Rooms: 37 (sorted by location)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • The Executioner - House of Tales (Germany)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • The Cursed Willy - Sherlocked Homes (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • Bella Ciao - Escape Game Katwijk (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Execution - The Escape Room Rijswijk (Netherlands)
  • The Legend of the Sword - Wyjście Awaryjne (Poland)
  • Operation Steampunk - Incognito Escape Game (Spain)
  • Dino Rising Blue Team - Dino Rising Experience (Mad Mansion) (Spain)
  • Dino Rising Red Team - Dino Rising Experience (Mad Mansion) (Spain)
  • The Temple of Chaak - The Legend Escape Room (Mad Mansion) (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • Hotel Hello - Way Out (Spain) (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 100
Patrick Rafferty owns and operates In Search Of An Exit Escape Rooms in Portland, Oregon. He’s played over 100 games, which is not a lot compared to some, but let’s be honest, that’s still too many games… we should all spend some more time outdoors, gang [2020 edit].
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Boda Borg - Boda Borg (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 238
Ben is the Director of Game Design & Development at The Escape Game and a passionate lover of escape games and all kinds of immersive experiences.
Affiliated Rooms: 7
  • Gold Rush - The Escape Game (United States)
  • Mission: Mars - The Escape Game (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Ruins: Forbidden Treasure - The Escape Game (United States)
  • Ruins: Forbidden Treasure (Remote Adventure) - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Ranked Rooms: 11 (sorted by location)
  • The Plane - The Game (France) (France)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Edison Escape Room - Palace Games (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Stash House - Stash House (United States)
Rooms Played: 410
Very likely among one of the earliest “enthusiasts”, Mark played his first game in October, 2013 and had played 34 games on three continents before the end of March, 2014. He is a co-founder of The Escape Game, which is based in Nashville and currently has 19 US-based locations. Mark has played over 400 rooms in 15 different countries including throughout Europe, Israel, China, and India. Mark plays most often with his family including wife Melinda and their children Carley and Dawson, who has himself played over 250 games. Mark heads up TEG’s game design department, and has co-designed all of TEGs escape games including 10 different games for their retail locations, a 400-player corporate training trilogy escape experience, as well as an escape game experience for Disney.
Affiliated Rooms: 7
  • Gold Rush - The Escape Game (United States)
  • Mission: Mars - The Escape Game (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Ruins: Forbidden Treasure - The Escape Game (United States)
  • Ruins: Forbidden Treasure (Remote Adventure) - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Ranked Rooms: 25 (sorted by location)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Utopia - Riddle Room (United States) (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
Rooms Played: 67
Myra is a senior at Rice University who has played over 60 escape rooms. She also founded an escape room club that makes free escape rooms for students and faculty at Rice.
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • Escape from The Red Room - SCRAP (Japan)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 155
Edward (Arlington, TX, USA) has played well over 150 rooms in countries around the world including the USA, Canada, U.K., Thailand, Singapore, Netherlands, Germany, Austria, Denmark, Czechia, and Texas (which is basically a whole 'nother country). Edward is most known for being Dawn Frost's husband, his better half when it comes to escape room completion because she's been there for almost every single room he has... and she's far better at combination locks. Dawn and Edward travel way too much and their most lasting memory of each country is what escape rooms they did while visiting.
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • Going Underground - Crime Runners (Austria)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
Rooms Played: 226
Cindi has played 226 rooms in the US, Europe, Asia, and Australia. She is responsible for creating other addicts in the family by dragging them to rooms whenever possible. Cindi works with Lisa & David Spira of REA fame and helped produce the virtual RECON 2020 convention.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • Escape from The Red Room - SCRAP (Japan)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 216
Marty shares the escape game addiction with his wife Cindi. He has played 216 games on 4 continents.
Affiliated Rooms: 0
Ranked Rooms: 25 (sorted by location)
  • Escape from The Red Room - SCRAP (Japan)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 58
Bradley is creative hunter-gatherer: professional actor, advertising hack, sound designer, mediocre musician, internationally-produced playwright, massage therapist, couch-surfing traveler, and escape room player who always solves the map puzzles. He is proud to have originated the role of The Ghost of Harry Houdini in Strange Bird Immersive’s immersive theatre-escape room mashup, The Man From Beyond.
Affiliated Rooms: 1
  • The Man from Beyond - Strange Bird Immersive (United States)
Ranked Rooms: 16 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 99
Haley ER Cooper (Houston, TX) is co-artistic director of Strange Bird Immersive (https://strangebirdimmersive.com) and a creator of The Man From Beyond. When Haley isn't performing or working on their next game Lucidity, you'll find her hunting down the best escape rooms in the US, at least, in non-pandemic times. She is the author of Immersology (https://strangebirdimmersive.com/immersology), where she explores best practices in immersive entertainment.
Affiliated Rooms: 1
  • The Man from Beyond - Strange Bird Immersive (United States)
Ranked Rooms: 22 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Vanishing Act - Locurio (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 96
One of the creators of Strange Bird Immersive (https://strangebirdimmersive.com), an escape game and immersive theatre company in Houston. Strange Bird's first game The Man From Beyond ranked #3 in the first TERPECA. He and the Strange Bird team have traveled throughout the US to speak at escape room and immersive entertainment conferences and to play escape games for research... and fun.
Affiliated Rooms: 1
  • The Man from Beyond - Strange Bird Immersive (United States)
Ranked Rooms: 21 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 250
Troy has been a game lover since birth. Starting out hosting game shows that he himself created in his family’s living room, he went on to receive multiple degrees in music composition. He has worked at a Kansas City based escape room company since 2017. His job there has seen him run rooms, design and create puzzles, and put together a local scavenger hunt attended by hundreds of people. (FYI: Designing puzzles that can be solved by dozens of people at once and don’t require any reset is harder than it sounds!) He very much enjoys multi-step puzzles and is often the “delegator” when doing escape rooms. On any given weekend you can find him writing music or driving hours to conquer rooms with his regular team “Caboose Coffee.”
Affiliated Rooms: 7
  • Gold Rush - The Escape Game (United States)
  • Mission: Mars - The Escape Game (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Ruins: Forbidden Treasure - The Escape Game (United States)
  • Ruins: Forbidden Treasure (Remote Adventure) - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Ranked Rooms: 8 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Study - The Basement (United States)
Rooms Played: 179
I am a self-employed nightclub owner. I love traveling the world and caught the travel bug when I was only 19 years old. Have been all over the world since then and have done Escape Rooms all over the world. My best friend Jamie and I enjoy doing them together. And we have done approximately 200 rooms together with a 95% success rate. I also like going to the gym, cooking, and trading stocks.
Affiliated Rooms: 0
Ranked Rooms: 10 (sorted by location)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • The Clock Tower - Escape The Room (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 278
Theresa Wagner (Washington, DC, USA) is a Hivemind Reviewer for RoomEscapeArtist.com and has played 281 rooms. She really likes whales, and dreams of an escape room with a real whale in it one day.
Affiliated Rooms: 0
Ranked Rooms: 33 (sorted by location)
  • The Night of the Wolf and the Serpent - Codex Escape Games (Canada)
  • The Reflection of Madness - Codex Escape Games (Canada)
  • The Wizard Four and the Book of Black Arts - Escaparium (Canada)
  • Circus of the Lost Souls - Immersia Escape Games Canada (Canada)
  • The Grand Immersia Hotel - Immersia Escape Games Canada (Canada)
  • Dream Weekend - Sauve Qui Peut (Canada)
  • Wrath of Poseidon - Sauve Qui Peut (Canada)
  • Galactic Pioneers - MindMaze (Czech Republic)
  • Haunted House - The Chamber (Czech Republic)
  • The Executioner - House of Tales (Germany)
  • Beast of Berlin - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Santa Muerte - E-Exit (Hungary)
  • Pirate Cave - Pirate Cave Escape Room (Hungary)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • Sub Terra - Co-Decode (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Grand Parlor - 13th Hour Escape Rooms (United States)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • Boda Borg - Boda Borg (United States)
  • Over The Falls - Escape City Buffalo (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • 8-Bit Escape - Escape Room Herndon (Ravenchase Adventures) (United States)
  • The Clock Tower - Escape The Room (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • Time Chasers: Race for the Cure - trap't Escape Room Adventures (United States)
Rooms Played: 84
Michael has completed 80 escape rooms in the US and Canada.
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
Rooms Played: 151
Justin is the inventor and producer of Cryptex(R) Security Boxes for the last 16 years (www.cryptex.org). He is also associated with the Cryptex Hunt, an online annual Puzzle Hunt. He is a big fan of Escape rooms with over 150 rooms played in three countries. Full disclosure: Some escape room companies use his Cryptexes in their escape rooms (but only one of the rooms was eligible to rank). However this has no impact on how he rates an escape room.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 55
I am a game designer with Haiku Games and am crazy about escape rooms and puzzle games of all sorts. I have been puzzling all my life, and have been doing escape rooms for the last 4 or 5 years with my husband. We mostly visit rooms in my home state of Washington, but also have done plenty in my husband's home state of Colorado and other odds and ends during our travels. I have also enjoyed many digital games with my company, and family.
Affiliated Rooms: 0
Ranked Rooms: 1 (sorted by location)
  • The Storykeeper - Locurio (United States)
Rooms Played: 50
I am a veteran game designer and escape room enthusiast. I have played primarily on the West coast of the US, with a few on the East coast as well. In 2016 I co-founded a company designed to create virtual escape rooms in AR (Hololens), but have put it on hold until the AR market revives.
Affiliated Rooms: 0
Ranked Rooms: 4 (sorted by location)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • The Study - The Basement (United States)
Rooms Played: 100
I am a Seattle-based escape room enthusiast who has done more than 100 rooms.
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 81
My name is Evan Kaufthal I’m a 12 year old boy from seattle in Washington last year was my first time ranking and I’m excited to do It again this year i enjoy playing sports and making escape rooms.
Affiliated Rooms: 0
Ranked Rooms: 11 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 110
Jon Kaufthal thinks escape rooms are pretty cool. He's played over 100 so far but is working on playing the rest just to make sure. He lives in Seattle with his wife and son who both join him as TERPECA voters--and with his daughter who tolerates all this, but is also somewhat concerned about the rest of the family.
Affiliated Rooms: 0
Ranked Rooms: 14 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • The Asylum - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 632
Jonathan McCue (Seattle, WA, USA) has played 632 rooms and is a co-owner of ClueKeeper, a platform for creating and playing location-based clue hunts. He believes that among the crazy, hopelessly addicted escape room enthusiasts he surrounds himself with, he is the sane one. Jonathan also provided valuable input in the data analysis phase of this project in determining the best approach to provide a fair, unbiased, and mathematically sound methodology for using individual stack ranks to generate a meaningful global ranking. Disclosure: Some of the companies with nominated rooms that Jonathan has played and ranked also offer hunts on ClueKeeper.
Affiliated Rooms: 3
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • The Vanishing Act Remote - Locurio (United States)
Ranked Rooms: 80 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 134
Julie Nevins has played over 100 rooms and hopes to play another 100 this year. In her non-escape room hours, she works at a university, writes novels, paints stuff – canvases usually – and spends time with her favorite Cryptex-maker.
Affiliated Rooms: 0
Ranked Rooms: 15 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Rooms Played: 96
Lulu has played 96 rooms and lives in Seattle
Affiliated Rooms: 0
Ranked Rooms: 12 (sorted by location)
  • Beat the Bomb Mission 01: Cyberbot - Beat the Bomb (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • Lab Rat - Hatch Escapes (United States)
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Stash House - Stash House (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
Rooms Played: 652
Summer Herrick (Seattle, WA, USA) has played over 650 escape rooms worldwide and is the co-owner of Locurio in Seattle, WA (www.locurio.com), which was ranked the #10 company and #15 room (The Storykeeper) in the 2019 TERPECAs.
Affiliated Rooms: 3
  • The Storykeeper - Locurio (United States)
  • The Vanishing Act - Locurio (United States)
  • The Vanishing Act Remote - Locurio (United States)
Ranked Rooms: 80 (sorted by location)
  • The Executioner - House of Tales (Germany)
  • Ghost Hunter Ernie Hudson and the Wailing Woman - Skurrilum (Germany)
  • Ghost Hunter Ernie Hudson and the Zoo of Death - Skurrilum (Germany)
  • Beast of Berlin - The Room (Germany)
  • Ghosthunter Brandon Darkmoor - The Room (Germany)
  • Go West - The Room (Germany)
  • The Lost Treasure of Alexander von Humboldt - The Room (Germany)
  • Room 107: Otherside - Escaped (Greece)
  • Cosmos 05: Death in Space - Escapepolis (Greece)
  • Requiem - Mysterylab (Greece)
  • El Exorcista - No Exit (Greece)
  • Paradox Project 2: The Bookstore - Paradox Project (Greece)
  • Paradox Project: The Mansion - Paradox Project (Greece)
  • Mrs. Rose's House - The Darkwood Village (Greece)
  • The End - DarkPark (Netherlands)
  • The Honeymoon Hotel - DarkPark (Netherlands)
  • The Orphanage - DarkPark (Netherlands)
  • Flight 815 - Down the Hatch (Netherlands)
  • The Dome - Escape Room Nederland (Netherlands)
  • The Girl's Room - Escape Room Nederland (Netherlands)
  • Room 237 - Kamer 237 (Netherlands)
  • The Amsterdam Catacombs - Logic Locks (Netherlands)
  • Catch Me If You Can - Next Level (Netherlands)
  • The Vault - Sherlocked Netherlands (Netherlands)
  • Abduction 3: The Exam - Abduction (Spain)
  • Abduction 4: Enterprises - Abduction (Spain)
  • Barum Dum - Cinema Escape (Spain)
  • The Interview - Cubick (Spain)
  • Alien: The Origin - Escape Barcelona (Spain)
  • Tomb Hunter: Akasha's Legend - Escape Barcelona (Spain)
  • Catacombs - Golden Pop (Spain)
  • Catalepsy - Horror Box (Spain)
  • Ouija - Horror Box (Spain)
  • Roomanji - Ilusium (Spain)
  • The Diamond of Souls - Inmortal Room (Spain)
  • Ulysses Spaceship - Maximum Escape (Spain)
  • The Mine - Unreal Room Escape (Spain)
  • The Narcos - Unreal Room Escape (Spain)
  • Project Ðelta - Archimedes Inspiration (United Kingdom)
  • The Battle for Britain - Escape Plan (United Kingdom)
  • Poppa Plock's Wonky Workshop - Handmade Mysteries (United Kingdom)
  • The Crystal Maze - The Crystal Maze (United Kingdom)
  • Dodge City - Tulleys Escape Rooms (United Kingdom)
  • Mutiny - Tulleys Escape Rooms (United Kingdom)
  • Nethercott Manor - Tulleys Escape Rooms (United Kingdom)
  • Revenge of the Sheep - clueQuest (United Kingdom)
  • cQ ORIGENES - clueQuest (United Kingdom)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • The Ghost of Mentryville - Arcane Escape Rooms (United States)
  • Murder Co - Black Market Escape Rooms (United States)
  • Boda Borg - Boda Borg (United States)
  • The Storyteller's Secret - Boxaroo (United States)
  • The Secret at Whitmore Estate - Breaking Point Escape Rooms (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • The Hex Room - Cross Roads Escape Games (United States)
  • The Psych Ward - Cross Roads Escape Games (United States)
  • Zoe - Escapade Games (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Lab Rat - Hatch Escapes (United States)
  • It's a Doggy Dog World - Level Games / ESCapades LA (United States)
  • Magic Kingdom - Maze Rooms (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Red Giant - Quest Room (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Stash House - Stash House (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Courtyard - The Basement (United States)
  • The Elevator Shaft - The Basement (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Observatory - The Gate Escape (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 201
Richard is an escape room enthusiast and investor. He is a writer for Room Escape Artist and a member of their Hivemind review group. He is a bit of an escape room philosopher. For him, reading, writing, talking and thinking about escape rooms and what they can be is just as interesting as playing them.
Affiliated Rooms: 0
Ranked Rooms: 24 (sorted by location)
  • Cutthroat Cavern - 13th Gate Escape (United States)
  • Tomb of Anubis - 13th Gate Escape (United States)
  • Plight of the Margo 1 & 2 - ConTRAPtions Escape Rooms (United States)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • The Skull Witch - Enchambered (United States)
  • The Whispering Halls - Enchambered (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Bonus Fun Time Game Show Challenge - Escape Factor (United States)
  • Inventor's Attic - Escape My Room (United States)
  • Smugglers Den - Escape My Room (United States)
  • Chapter 2: Playtime - Lost Games (United States)
  • The Edison Escape Room - Palace Games (United States)
  • The Great Houdini Escape Room - Palace Games (United States)
  • The Roosevelt Escape Room - Palace Games (United States)
  • Paradox: The Incredible Time Machine - Rabbit Hole Recreation Services (United States)
  • Ruins of the Mystic Temple - Rabbit Hole Recreation Services (United States)
  • Utopia - Riddle Room (United States) (United States)
  • The Man from Beyond - Strange Bird Immersive (United States)
  • The Study - The Basement (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
  • The Last Defender - The House Theatre of Chicago / Denver Center for Performing Arts (United States)
Rooms Played: 311
Kurt Duzeski is an avid escape room enthusiast playing over 300 games throughout North America in the past 5 years. He currently designs and builds all aspects of his "What The Lock?" Escape Room facility in downtown Manitowoc, WI utilizing his 25+ years experience in gaming, set design, electronics, programming, millwright, and carpentry.
Affiliated Rooms: 2
  • Orvellio's: Reconjured - What the Lock? (United States)
  • Vlad: The Third Letter - What the Lock? (United States)
Ranked Rooms: 7 (sorted by location)
  • Captain Spoopy Bones and the Magnificent Quest For Some Other Pirate's Treasure - Doldrick's Escape Room (United States)
  • Super Bomb Squad: Commandos Awesome - Doldrick's Escape Room (United States)
  • A Knight to Escape - Escape Effect (United States)
  • Utopia - Riddle Room (United States) (United States)
  • Playground - The Escape Game (United States)
  • Prison Break - The Escape Game (United States)
  • Special Ops: Mysterious Market - The Escape Game (United States)
Press

Press

Looking for more analysis and discussion on the TERPECAs? Check out the following sites:

2020

Room Escape Artist from the U.S. offered their take on how to maximize your personal value from the 2020 results.
EscapeGame•fr from France offered their thoughts about the 2020 Awards.
Serial Escapers from France offered their thoughts about the 2020 Awards.
Escape Maniac from Germany offered their thoughts about the 2020 Awards.
EscapeTalk.NL from the Netherlands covered the 2020 Awards in their monthly newsletter.

2019

Room Escape Artist offered more great analysis and detailed discussion about the 2019 awards and the project in general.
The Logic Escapes Me analyzed the winners in Europe and provided an in-depth review of the project.
Two Bears Life reviewed the 2019 awards and gave their take on the winners.

2018

Room Escape Artist offered some great analysis and detailed discussion about the project and its merits.
The Logic Escapes Me analyzed the winners in Europe and included a great interactive map of all of the winners worldwide.
Room Escape Divas talked to Rich on their podcast and got the inside scoop on how the project started and evolved.
Escape Room Tips provided some commentary on the project and links to the games they've reviewed among the winners.
Escape Rumors also provided some insight on the project and links to the games they've reviewed among the winners.
escapetalk.nl highlighted the project in their weekly roundup covering escape room news in the Netherlands and Europe.
No Proscenium interviewed Rich about how the project was conceived and what he looks for in an escape room.
The project was named to the inaugural Niche 100, which celebrates the most creative and compelling niche brands online today.
For Your Website

Download Logos

If your room or company is a TERPECA honoree or if you are a journalist or blogger writing about the project, please feel free to download these logos, subject to the usage guidelines listed below the logos.

2020

2019

2018

Usage Guidelines

  • Journalists and bloggers are free to use any of the logos in support of their TERPECA-related content.
  • Rooms and companies may only use logos associated with the status they've achieved. The Top Room, Top Online Room, and Top Company logos (and any modified logo with the "ribbon" design) are for only the official TERPECA winners, i.e. those who specifically won a Top Room, Top Online Room, or Top Company award. Finalist logos are only for rooms and companies that advanced to Phase 2 of the project. Nominee logos are only for rooms and companies that received a nomination.
  • Minor modifications to a logo that has been earned by a room or company is acceptable, provided that any modifications do not misrepresent the placement of a room or company, do not remove the year of the award, and do not misrepresent the goals or spirit of the project in general.
  • Use of the TERPECA logo that suggests an affiliation with TERPECA that does not exist, or that suggests a room or company has won an award it did not win is strictly prohibited.
  • If you're unsure of your usage, please contact us first at admin@terpeca.com.
Contact

Contact

Follow us on Facebook or Instagram for future announcements about the project.

If you've played 50 or more escape rooms and would like to contribute to the project in future years, visit the TERPECA Voter Portal to learn more and sign up.

If you have any other questions about this project, contact Rich Bragg at rich@terpeca.com.